




免费预览已结束,剩余5页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Gay is now a provincial key construction project of aluminum Ltd province with an annual output of 50 000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager In this technological transformation projects he has overall responsibility for the day to day affairs of the project In order to ensure that southern company s control the scale of investment strengthen field management pay special attention to project progress and ensure a successful operation the overall goal He and Engineering Department under the leadership of all the staff in the company s technical command on the difficulties and to overcome technical difficulties in the process work hard have made outstanding achievements mainly reflected in the following aspects first careful organization and management achieved remarkable results Technical innovation project of the year started and completed a series of bids and completed to date from production engineering to put into production after nearly a year has achieved very significant results A project first 56 slots from dismantling the old slot just 168 days civil engineering installation commissioning guarantee engineering quality under the premise on the production side transformation under difficult conditions created the national industry s fastest speeds II 32 large prebaked electrolytic cell on November 7 has been installed marks has an annual production capacity of 50 000 tons of electrolytic aluminum production capacity of aluminum Entire project almost 8 months earlier than planned achieved the goal of production transformation benefits that year created favorable conditions for aluminum through South Second effectively control the investment Project is subject to a scientific approach to bidding bidding to make savings of 20 million Yuan in the implementation process of the project every domestic prices of steel cement and other building materials the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering but through rationalization and optimization project control in fixed investment of 350 million Yuan Third environmental energy saving effect of the project Project investment of nearly 30 million Yuan using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology fluoride and other harmful gases purification efficiency of up to 98 Compared with Soderberg cell before the modification power consumption can be reduced by 1500 tons of electrolytic aluminum and project environmental protection and energy saving effect is obvious Four are in a relatively short period of time to the normal production After four months of efforts a project has put into operation all the 54 240KA large cell into regular production stable current channel conditions and all the economic indicators are good current efficiency in October had reached 93 is close to and reach the domestic advanced level In the case of production half of the cell this effect can be achieved and better level in the industry 50 000 tons of electrolytic modification process from preliminary study to equipment selection cost control project progress quality control and coordination among the various sub projects and various professional technical command under the correct leadership both from an overall perspective emphasis on integrity and earnestly implement the relevant laws and regulations strictly act according to the contract He tried to learn relevant knowledge good style of business operational and organizational coordination ability project efficiency quality and safety assurance system in place with all units involved with the coordination and good Four outstanding works They are derived from their own inner feelings I also sent a student to attend the class Department speech contest failed to get a good result but also actively cooperate with the Department and class activities in order to create a demonstration dorm room our weekly class to every bedroom check where proposed is insufficient In order to clean up the bedroom we use the brush brushes a bedroom again For the class out of a force In the event we many projects did not get the desired results But we understand that we tried and in the struggle Also has made good progress in many of the in my class the work carried out and the results achieved thanks to the concern and support of the Department thanks to instructor teacher s good proper guidance thanks to 46 students in the class will work closely together to work together Of course we also have our weaknesses needs to be further correction in their future learning and life with a view to achieving greater results Five declarations of good party branch branch is a fortress a party member is a banner Fighting in the railway engineering construction Group Headquarters Headquarters branches a total of members 18 Role of the Xiang GUI railway and tight South Lebanon railway heavy poor conditions of disadvantage the branch closely around the construction work Holding high the flag of our party members unite and lead staff on the difficulties overcome difficulties take the zhengyou a job well done and an engineering task won the highly valued by leaders at all levels Since October last year since the project began Headquarters Branch is tightly around the center of its activities Face South climate is wet sooner or later temperature larger specific difficult I branch from thought requirements all workers active motivated do can long term hard dare fight of spirit prepared while requirements all members lead encouraged colleagues Zhijian each other help each other learning business knowledge overcome temporarily difficult active into to engineering official starts of the prepared work in the to play out has as a branch of fighting fortress role and members of pioneer model role Since its start I command under the correct leadership of the party branch in the Group and the superior party centering on building a qualified party branches branch of the forts and the battle to play the exemplary vanguard role of party members actively working In command personnel less and task heavy of situation Xia all members always according to party stronger and style to are and service better and efficiency to high of requirements from overall starting better to completed has production organization and coordination and guarantees and the management work in engineering progress and quality and benefits and safety aspects are made has good of results get has owners and the Group and grass roots units of praise First give full play to the exemplary role of party members The exemplary role of party members and cadres are silent on the command the exemplary role of party members and cadres are the best of the ideological and political education We pay close attention to party building requires political party members and cadres must take the lead in learning set strict demands on themselves 本科生学期论文本科生学期论文 题目名称 论中西方思维方式的差异 院 系 外国语学院 专 业 英 语 学生姓名 曲研 学 号 421012401021 指导教师 姜 虹 2014 年 12 月 3 日 Gay is now a provincial key construction project of aluminum Ltd province with an annual output of 50 000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager In this technological transformation projects he has overall responsibility for the day to day affairs of the project In order to ensure that southern company s control the scale of investment strengthen field management pay special attention to project progress and ensure a successful operation the overall goal He and Engineering Department under the leadership of all the staff in the company s technical command on the difficulties and to overcome technical difficulties in the process work hard have made outstanding achievements mainly reflected in the following aspects first careful organization and management achieved remarkable results Technical innovation project of the year started and completed a series of bids and completed to date from production engineering to put into production after nearly a year has achieved very significant results A project first 56 slots from dismantling the old slot just 168 days civil engineering installation commissioning guarantee engineering quality under the premise on the production side transformation under difficult conditions created the national industry s fastest speeds II 32 large prebaked electrolytic cell on November 7 has been installed marks has an annual production capacity of 50 000 tons of electrolytic aluminum production capacity of aluminum Entire project almost 8 months earlier than planned achieved the goal of production transformation benefits that year created favorable conditions for aluminum through South Second effectively control the investment Project is subject to a scientific approach to bidding bidding to make savings of 20 million Yuan in the implementation process of the project every domestic prices of steel cement and other building materials the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering but through rationalization and optimization project control in fixed investment of 350 million Yuan Third environmental energy saving effect of the project Project investment of nearly 30 million Yuan using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology fluoride and other harmful gases purification efficiency of up to 98 Compared with Soderberg cell before the modification power consumption can be reduced by 1500 tons of electrolytic aluminum and project environmental protection and energy saving effect is obvious Four are in a relatively short period of time to the normal production After four months of efforts a project has put into operation all the 54 240KA large cell into regular production stable current channel conditions and all the economic indicators are good current efficiency in October had reached 93 is close to and reach the domestic advanced level In the case of production half of the cell this effect can be achieved and better level in the industry 50 000 tons of electrolytic modification process from preliminary study to equipment selection cost control project progress quality control and coordination among the various sub projects and various professional technical command under the correct leadership both from an overall perspective emphasis on integrity and earnestly implement the relevant laws and regulations strictly act according to the contract He tried to learn relevant knowledge good style of business operational and organizational coordination ability project efficiency quality and safety assurance system in place with all units involved with the coordination and good Four outstanding works They are derived from their own inner feelings I also sent a student to attend the class Department speech contest failed to get a good result but also actively cooperate with the Department and class activities in order to create a demonstration dorm room our weekly class to every bedroom check where proposed is insufficient In order to clean up the bedroom we use the brush brushes a bedroom again For the class out of a force In the event we many projects did not get the desired results But we understand that we tried and in the struggle Also has made good progress in many of the in my class the work carried out and the results achieved thanks to the concern and support of the Department thanks to instructor teacher s good proper guidance thanks to 46 students in the class will work closely together to work together Of course we also have our weaknesses needs to be further correction in their future learning and life with a view to achieving greater results Five declarations of good party branch branch is a fortress a party member is a banner Fighting in the railway engineering construction Group Headquarters Headquarters branches a total of members 18 Role of the Xiang GUI railway and tight South Lebanon railway heavy poor conditions of disadvantage the branch closely around the construction work Holding high the flag of our party members unite and lead staff on the difficulties overcome difficulties take the zhengyou a job well done and an engineering task won the highly valued by leaders at all levels Since October last year since the project began Headquarters Branch is tightly around the center of its activities Face South climate is wet sooner or later temperature larger specific difficult I branch from thought requirements all workers active motivated do can long term hard dare fight of spirit prepared while requirements all members lead encouraged colleagues Zhijian each other help each other learning business knowledge overcome temporarily difficult active into to engineering official starts of the prepared work in the to play out has as a branch of fighting fortress role and members of pioneer model role Since its start I command under the correct leadership of the party branch in the Group and the superior party centering on building a qualified party branches branch of the forts and the battle to play the exemplary vanguard role of party members actively working In command personnel less and task heavy of situation Xia all members always according to party stronger and style to are and service better and efficiency to high of requirements from overall starting better to completed has production organization and coordination and guarantees and the management work in engineering progress and quality and benefits and safety aspects are made has good of results get has owners and the Group and grass roots units of praise First give full play to the exemplary role of party members The exemplary role of party members and cadres are silent on the command the exemplary role of party members and cadres are the best of the ideological and political education We pay close attention to party building requires political party members and cadres must take the lead in learning set strict demands on themselves 论中西方思维方式的差异 摘要 摘要 论文针对中国人和西方人的思维方式差异 从曲线与直线 解析与整体 模糊 与精确 中庸与偏激等几个方面进行了比析 指出了各自的优势与不足 有利于我们了 解中西方思维方式差役的特点和原因 有利于我们既保持自身的号的特性 克服不足 能 更好地融合到文化全球化的趋势之中对我们有一定的启迪意义和实际的操作价值 关键词 关键词 中西方 思维方式 差异 Gay is now a provincial key construction project of aluminum Ltd province with an annual output of 50 000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager In this technological transformation projects he has overall responsibility for the day to day affairs of the project In order to ensure that southern company s control the scale of investment strengthen field management pay special attention to project progress and ensure a successful operation the overall goal He and Engineering Department under the leadership of all the staff in the company s technical command on the difficulties and to overcome technical difficulties in the process work hard have made outstanding achievements mainly reflected in the following aspects first careful organization and management achieved remarkable results Technical innovation project of the year started and completed a series of bids and completed to date from production engineering to put into production after nearly a year has achieved very significant results A project first 56 slots from dismantling the old slot just 168 days civil engineering installation commissioning guarantee engineering quality under the premise on the production side transformation under difficult conditions created the national industry s fastest speeds II 32 large prebaked electrolytic cell on November 7 has been installed marks has an annual production capacity of 50 000 tons of electrolytic aluminum production capacity of aluminum Entire project almost 8 months earlier than planned achieved the goal of production transformation benefits that year created favorable conditions for aluminum through South Second effectively control the investment Project is subject to a scientific approach to bidding bidding to make savings of 20 million Yuan in the implementation process of the project every domestic prices of steel cement and other building materials the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering but through rationalization and optimization project control in fixed investment of 350 million Yuan Third environmental energy saving effect of the project Project investment of nearly 30 million Yuan using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology fluoride and other harmful gases purification efficiency of up to 98 Compared with Soderberg cell before the modification power consumption can be reduced by 1500 tons of electrolytic aluminum and project environmental protection and energy saving effect is obvious Four are in a relatively short period of time to the normal production After four months of efforts a project has put into operation all the 54 240KA large cell into regular production stable current channel conditions and all the economic indicators are good current efficiency in October had reached 93 is close to and reach the domestic advanced level In the case of production half of the cell this effect can be achieved and better level in the industry 50 000 tons of electrolytic modification process from preliminary study to equipment selection cost control project progress quality control and coordination among the various sub projects and various professional technical command under the correct leadership both from an overall perspective emphasis on integrity and earnestly implement the relevant laws and regulations strictly act according to the contract He tried to learn
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 商业综合体储藏室所有权转移协议
- 民营企业厂房租赁安全生产协议范本
- 涉及租赁房屋周边商业配套的退房协议
- 房屋委托租房协议书范本
- 农产品集中采购合作协议
- 无人振捣机轨迹规划
- 下肢深静脉血栓治疗与护理
- 2024年高考语文复习:宫苑类题材古代诗歌阅读练习题(含答案解析)
- 制造客户需求培训
- 四有好老师教师培训讲座
- 2024年福州第十一中学招聘笔试真题
- 【泉州:寒街孤影寻暖意 一抹亮色映霜花】中原地产2024年泉州楼市分析报告正式版
- 小学生反分裂课件
- 外科病房医院感染防控工作职责
- DB34∕T 3262.2-2018 普通公路养护预算 第二部分:定额
- 2025年省定远县第三批“曲阳雁归”工程公开招录50名村(社区)干部高频重点提升(共500题)附带答案详解
- 旅游学概论(李天元)课件
- 大数据技术原理与应用-林子雨版-课后习题答案(文档).文档
- 医院信息化网络安全培训
- 发电厂安全隐患排查
- 《特种设备安全管理员》考试通关题库(600题 含参考答案)
评论
0/150
提交评论