工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果检修间挖土方M3(4.5-2.7)*(7.5+1.58*0.24+2)*(11.86+0.44+0.48+4)298.39副厂房土方开挖M3(4.0-2.7)*(34.6+1.5+0.24+2)*(14.7+0.44+4)953.98检修间 副厂房回土M3298.39+953.98-330.11-33.47-31.65-186.14-9.98661.02工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果副厂房、检修间基础C15垫层JCTM33.2*1.4*0.1*41.904承台1M31.4*1.4*0.1*61.176承台2M33.2*1.4*0.1*198.512承台3M33.2*1.4*0.1*20.896承台4M36.8*1.6*0.11.088承台5M34.3*4*0.11.72承台6M34.3*6.6*0.12.838基础梁1M33*0.5*0.1*40.6基础梁2M3(12.5*7+7+16.5*2)*0.55*0.17.013基础梁3M3(9.1+7.5+14+14+23.1)*0.5*0.13.385基础梁4M31.45*2*0.3*0.40.348基础梁5M3(7.5-0.38*2)*2*0.55*0.10.741基础梁6M31.58*2*0.5*0.10.158基础梁7M3(6+2.2+3.66-1.26)*2*0.6*0.11.272合计M331.65工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果副厂房、检修间承台及基础梁C25JCTM33*1.2*0.95*413.68承台1M31.2*1.2*0.95*68.21承台2M33*1.2*0.95*1964.98承台3M33*1.2*0.95*26.84承台4M36.6*1.49.24承台5M34.1*3.815.58承台6M34.1*6.426.24基础梁1M33*0.3*0.4*41.44基础梁2M3(12.5*7+7+33)*0.35*0.522.31基础梁3M3(9.1+7.5+28+23.1)*0.3*0.48.12基础梁4M31.45*2*0.3*0.40.348基础梁5M3(7.5-0.38*2)*2*0.55*0.32.224基础梁6M3(1.7-0.12)*2*0.3*0.60.57基础梁7M3(6+2.2+3.66-1.26)*2*0.4*0.756.36合计M3186.14工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果检修间副厂房框架柱JKZ1M3(14.55-3.4)*0.5*0.85+(19.05-14.550)*0.5*0.555.98JKZ2M3(14.55-3.4)*0.5*0.85+(19.05-14.55)*0.5*0.555.98JKZ3M3(14.55-3.4)*0.5*0.85+(19.05-14.55)*0.5*0.555.98JKZ4M3(14.55-3.4)*0.5*0.85+(19.05-14.55)*0.5*0.555.98KZ1M3(14.5-2.8)*0.4*0.52.34KZ2M3(10-2.8)*0.4*0.51.44KZ3M3(16.319-2.8)*0.5*0.64.06KZ4M3(14.5-2.8)*0.4*0.52.34KZ5M3(14.5-2.8)*0.4*0.5*24.68KZ6M3(14.5-2.8)*0.4*0.5*24.68KZ7M3(14.5-2.8)*0.4*0.52.34KZ8M3(16.183-2.8)*0.4*0.5*25.36KZ9M3(16.319-2.8)*0.4*0.5*25.41KZ10M3(14.5-2.8)*0.4*0.52.34KZ11M3(14.5-2.8)*0.4*0.5*511.7KZ12M3(16.183-2.8)*0.4*0.5*25.36KZ13M3(16.319-2.8)*0.4*0.5*410.82KZ14M3(14.5-2.8)*0.4*0.5*37.02KZ15M3(14.5-2.8)*0.4*0.52.34KZ16M3(14.5-2.8)*0.4*0.52.34KZ17M3(16.183-2.8)*0.4*0.52.68KZ18M3(16.319-2.8)*0.4*0.52.7KZ19M3(14.5-2.8)*0.4*0.52.34ZM3(9.9-2.8)*0.5*0.5*23.55 合计M3109.76工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果检修间副厂房构造柱GZ- 1M3(15.45-3.4)*0.24*0.3*86.94GZ2M3(15.35-2.8)*0.24*0.3*43.61GZ3M3(15.35-2.8)*0.24*0.3*109.04GZ4M3(10-5.5)*0.24*0.3*20.65GZ5M3(7.7-2.8)* 0.24*0.3*20.71GZ6M3(14.55-10)*0.4*0.40.73GZ7M3(15.4-10)*0.24*0.30.39合计M322.07工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果检修间10.05梁KL1M30.3*(11.86-0.63*2)3.18KL2M30.34*0.7*(7.5-0.68+1.5)*22.53检修间14.5梁KL1M30.3*(11.86-0.63*2)3.18KL2M30.34*0.7*(7.5-0.68+1.5)*23.96合计M312.85工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果检修间19.05梁及斜屋面WKL1M30.3*0.9*(11.86-0.63*2)2.86WKL2M30.3*0.9*(12.84-1.26)3.13L1M30.3*0.75*12.842.89L2M30.25*0.55*12.841.77L3M35.93*0.3*0.61.07WKL3M30.3*0.8*(7.5+1.7-0.5-0.38)*23.66现浇斜屋面M3(7.5+1.58+0.24+1.92+1.7)*5.93*01.+(11.86+0.24)*2.964*0.111.26合计M326.64检修间天沟M3(1.04*0.09+0.15*0.15)*(10.2*2+11.86+0.44)3.8检修间窗上面梁M30.6*0.24*(11.86-1.26+6.82*2)+0.2*0.24*(11.86-1.26)4检修间YP1M30.19*0.7*5.24+0.0296*(5.24+2.8)0.935窗台压顶M30.1*0.24*20.30.49工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果副厂房5.5M梁及现浇板KL-1M30.24*0.34*(14.7-2.6)0.99KL- 2M30.24*0.34*14.11.15KL-3M30.24*0.33*13.21.05KL-4M30.24*0.39*13.21.24KL-5M30.24*0.34*14.21.16KL-6M30.24*0.39*(14.7-1.5)1.24KL-7M30.3*0.74*(14.7-0.75)3.1KL-8M30.3*0.74*13.73.04KL-9M30.24*0.39*13.21.24KL-10M30.24*0.34*13.21.08KL-11M30.24*0.29*30.6+0.24*0.2*5.5+0.3*0.3*73.02KL-12M30.3*0.69*32.46.71KL-13M30.3*0.69*32.46.71KL-14M30.24*0.29*30.6+0.24*0.2*0.55+0.3*0.3*77.79L-1M30.24*0.55*151.98L-2M30.24*0.24*3.76*20.43L-3M30.24*0.19*1.26*20.12L-4M30.24*0.24*3.760.22L-5M30.24*0.24*3.760.22L-6M30.24*0.24*2.560.15L-7M30.24*0.19*0.560.03L-8M30.24*0.19*2.16*20.2L-9M30.24*0.24*2.560.15L-10M30.24*0.19*0.760.04L-11M30.24*0.19*1.24*20.11L-12M30.24*0.19*3.250.15L-13M30.24*0.29*7.520.52L-14M30.24*0.29*7.52*21.05L-15M30.24*0.29*3.760.26L-16M30.24*0.29*3.760.26L-17M30.27*0.29*7.520.52L-18M30.24*0.29*3.76*20.52L-19M30.24*0.29*11.280.79L-20M30.24*0.29*10.88*21.51L-21M30.24*0.29*3.76*20.52L-22M30.24*0.29*3.76*20.52L-23M30.24*0.29*11.280.79L-24M30.24*0.19*2.140.1L-25M30.24*0.24*3.760.22L-26M30.24*0.19*1.780.08挑梁M30.3*0.59*1.5*41.06现浇板M336.34*15.2*0.11-(1.26*2.06+3.76*1.26+0.6*1.26+1.16*2.14*2+3.76*1.26*2+1.88*1.26*2+1.66*0.88*2+0.56*2.16+0.56*0.56+1.64*0.56+2.08*0.56+3.76*0.36*2)*0.1157.26合计M3104.32楼梯投影面积M23.76*6.26+2.36*5.7618.57工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果副厂房标高10M有梁板KL-1M30.24*0.33*12.9*22.04KL-2M30.24*0.33*14.21.12KL-3M30.24*0.33*13.2*22.09KL-4M30.24*0.33*14.21.12KL-5M30.3*0.73*13.953.06KL-6M30.3*0.73*13.73KL-7M30.24*0.33*13.21.05KL-8M30.24*0.33*13.21.05KL-9M30.34*0.28*(36.1-9.5-2.4-0.48)+(0.34*0.7+0.24*0.2)*8.54.69KL-10M30.24*0.28*(36.1-2.2-0.72)2.23KL-11M30.24*0.28*(36.1-1.6-0.28-0.38-0.48)2.24KL-12M30.34*0.28*(36.1-9.5-2.4-0.48)+ (0.34*0.7+0.24*0.2)*8.54.69L-1M30.24*0.18*3.010.13L- 2M30.24*0.28*3.760.25L-3M30.24*0.28*7.520.51现浇板M334.84*12.98*0.12+1.96*34.84*0.1-18.57*0.1258.87合计M387.89标高10.95M装饰线条M30.49*0.15*(36.1-9.5+0.12)*23.93YP2M33.47*0.19/2*1.5+(0.07*0.28+0.01)*6.470.69楼梯投影面积M23.76*6.26+2.36*5.7618.57工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果标高14.55M斜屋面有梁板WKL-1M30.3*0.73*2*(14.76-1.1)2.99WKL-2M30.24*0.53*14.161.8WKL-3M30.24*0.55*13.16*23.35WKL-4M30.24*0.53*14.161.8WKL-5M30.24*0.53*13.161.68WKL-6M30.3*0.73*13.963.06WKL-7M30.24*0.53*13.161.68WKL-8M30.24*0.53*13.11.67WKL-9M30.24*0.28*(36.1-9.5-2.8)+0.3*0.58*8.53.08WKL-10M30.3*0.8*(36.1+0.24-2)8.24WKL-11M30.3*0.8*(36.1+0.24-3.2)7.95WKL-12M30.24*0.28*(36.1-9.5-2.8)+0.3*0.58*8.53.08L-1M30.24*0.53*14.041.79现浇面M3(36.1+0.24+36.1-4)*0.12*7.5+15.1*2.24*0.1265.65合计M3107.82工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果副厂房 天沟M30.95*0.09*(37.29*2+14.7+0.24)+(0.08*0.26+0.15*0.15)*(36.1*2+0.48+0.95*4+14.7+0.24)11.61主副厂房毛石及瓷砖上下线条C30M30.34*0.2*23415.91副厂房二层窗下线条C30M30.39*0.15*59.93.515.54M装饰线条C30M3(5.5+3.82*2+14.7+0.24+0.6)*0.15*0.733.14门窗过梁C30M30.24*0.24*170.89.84卫生间止水带M30.24*0.2*33.921.63屋面伸缩缝止水带M3(14.76+12.84*2)*0.2*0.32.43增加过梁设计变更编号(FJ02-1)M30.24*0.4*50.48门厅工程量MTL1C25M30.24*0.3*9.10.66素土夯实M20.88*9.38.18200厚2:1碎砖沙垫层M30.88*9.3*0.21.64100厚C15垫层M30.68*9.3*0.10.82门厅基础砖墙普通砖M7.5水泥砂浆M3(0.55*0.24+0.24*0.12)*9.1+2.724*2*(0.18*0.36+0.3*0.24+0.75*0.12)+3.26*2*(0.18*0.36+0.3*0.24+0.12*0.75)+9.1*3*0.07+3*9.1*0.1515.45门厅5.85M板现浇C30M33.26*9.1*0.123.56门厅楼梯M22.7*9.124.57门厅板两侧斜梁M30.3*0.2*6.35*20.762门厅斜现浇板及梁YL1M30.65*0.24*8.51.32YL2M33.26*2*0.35*0.240.55斜屋面M3(8.5*2+3.5*4.66)*0.124TYP1M3(0.65*0.08+0.27*0.08+0.15*0.15)*(8.5+2.6+7+0.65)1.8由于甲方变更门厅斜屋面从新浇筑C30混凝土,后贴瓦时改变坡度(设计院通知单编号FJ03-5)M35.8+3.59.3副厂房墙长大于4.5M增加构造柱M30.24*0.24*(1.6*3+3.9*8+4.9*8)+0.12*0.24*(3.9*2+4.9*4)5.12模板及钢筋从新立模及绑扎设计变更02-2M215.14*1.522.71砸墙增加门洞设计变更02-1M20.8*3.72.96大厅16A及19A轴柱子加宽(装修时增加)C30M3(0.08*0.1+0.38*0.18)*4.35*20.67大厅16A及19A轴柱子加宽(装修时增加)模板M2(0.18+0.28+0.38)*2*4.357.308C3上增加过梁钢筋植筋跟1212工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果 地下一层地沟碎石100厚M353*0.8*0.1+0.14.34垫层C15 100厚M353*0.6*0.1+0.13.28人工挖土运距100MM353*0.4+1.4*1.4*1*225.12回土M353*0.4+1.4*1.4*1*2-53*0.4*0.2-0.4*2-7.6212.46普通砖M7.5砂浆砌筑M353*0.12*0.2*2+2.4*1.2*0.122.544抹灰M253*0.62+2.4*1.2*238.62不锈钢网状盖板M253*0.4+1*223.2工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果检修间4.4M以下普通砖墙M3(9.2*2+10.6*2)*1.05*0.249.98防潮层M2(9.2*2+10.6*2)*0.249.5检修间外墙M3(19.05-1.4-4.4)*(9.2-0.24*5)*2-0.9*8.1*6-2.4*5.2*2+(19.05-4-2)*10.6-3.9*5-2.4*4.5-2.4*2.7*2*0.2457.21检修间内墙M3(19.05-3.4)*0.8*2*0.246.01检修间屋面及雨棚找平M2(7.5+1.58+0.24+1.92+1.7)*5.93+(11.86+0.24)*2.964+33.94*0.72+5.24*1.4144.37检修间屋面及雨棚防水M2(7.5+1.58+0.24+1.92+1.7)*6.33+(11.86+0.24)*2.964+33.94*1.35+5.64*1.8173.75屋面盖瓦M2(7.5+1.58+0.24+1.92+1.7)*5.93+(11.86+0.24)*2.964112.6检修间屋面盖瓦油漆M2112.6检修间外墙抹灰M2(19.05-4)*9.2*2-0.7*8*6-2.2*5*2+(19.05-4)*(10.6+1.7+0.48)-3.7*4.8-2.2*4.3-2.2*2.5*3369.94检修间内墙抹灰M2(19.05-1.4-4.45)*(9.2-0.24*5)*2-0.7*8*6-2.2*5*2+(19.05-4-2)*10.6-3.7*4.8-2.2*4.3+(19.05-4)*1.04*2-2.2*2.5*3281.51检修间梁柱面抹灰M2(19.5-4)*(0.85*6+0.26*2)+8.2*2*1.4+10.6*2131.27检修间内墙涂料M2(19.05-1.4-4.45)*(9.2-0.24*5)*2-0.7*8*6-2.2*5*2+(19.05-4-2)*10.6-3.7*4.8-2.2*4.3+(19.05-4)*1.04*2+(19.5-4)*(0.85*6+0.26*2+1)+8.2*2*1.4+10.6*2-2.2*2.5*3428.28检修间顶棚涂料M2(7.5+1.58+.24+1.92+1.7)*6.42+(11.86+0.24)*2.96+12.84*(2.1+1.8+1.35)186.3检修间外墙深灰色毛石贴面M2(9.2*2+8.88)*1.5542.28外墙贴面砖M29.55*(9.2*2+12.78)-0.7*7.9*6-2.2*4.6254.47外墙涂料M25.85*31.24-2.2*2.5*2-2.2*4.3-3.9*4+2.7149.39工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果检修间坡道(素土夯实100碎石100混凝土面层使用芝麻灰花岗岩)M25.6*2.0511.48检修间楼梯M22.5*1.684.2检修间地坪设计变更01-3素土夯实M212.3*9.7119.31100厚碎石M312.3*9.7*0.111.93120厚C15厚混凝土M312.3*9.7*0.1214.32直径6双向钢筋网片t(9.65+0.36+0.2)*62*0.222+(12.25+0.36+0.2)*52*0.2220.288地砖(地砖及里面砖)M212.3*10.25-4.2121.88瓷砖踢脚线M12.3*2+9.2*2+0.8*4-3.9-2.539.8楼梯大理石M22.1*(1.05+1.68)5.733楼梯黑金砂M20.4*(1.05+1.68)1.09防护栏杆M8.18.1散水(素土夯实、100碎石、80C15混凝土)M2(9.2*2+12.78-3.9+7.9+2.5)*0.830.14油膏灌缝M9.2*2+12.78-3.9+7.9+2.5+1.13*442.2工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果副厂房地下一层地坪素土夯实M2(36.1-0.72)*14.7+0.22*2*9.5524.23100厚碎石夯实灌1:5水泥砂浆M3524.23*0.152.4260厚C15表面撒1:1干水泥中粗沙压实抹光M2524.23524.23冷底子油一道、热沥青二道防潮层M2524.23+0.65*(36.1*2+14.7+5.34*6+6.1*6)+26.96652.29撒绿豆沙一层粘牢M2524.23+0.65*(36.1*2+14.7+5.34*6+6.1*6)+26.96652.2960厚C15表面撒1:1干水泥中粗沙压实抹光M2524.23524.23一层楼地面一层楼满砂浆找平M2160.14+34.94+304.58499.66门厅花岗岩M2(11.76-0.4)*(8.68-0.4)+7.4*7.6+8.2*0.3*2*2+3.5*1.835*2+3.9*1.835+7.6*1.835160.14走廊花岗岩M2(34.6-11.76-0.44)*1.5634.94门厅走廊黑金砂M211.76*2*0.2+8.68*2*0.2+0.24*4+7.4*0.4+(34.6-11.76)*2*0.2+1.56*0.4421.92门厅走廊100高不锈钢镜面踢脚线M11.76*2+8.68*2-4+8.2*2+(34.6-11.76)*2+1.56-3.76-2.3694.4一层抛光地砖M2(14.7+0.44)*1.5+3.82*6.1*2+10.36*6.6+15.76*6.26+6.26*3.76+7.76*5.76304.58一层瓷砖踢脚线M14.7+0.44+1.5*2+3.82*2*2+6.1*2*2+10.36*2+6.6*2+15.76*2+6.26*2+6.26*2+3.76*2+7.76*2+5.76*2-1.2*4-1.5*4-0.9171.16一层卫生间防滑地砖M23.76*5.7621.66一层卫生间墙砖M2(6+3.76*3+3.6*2+3.76-1.4+5.76-0.24)*4.35-2.7*4129.97一层卫生间隔墙M3(3.76+5.76-1.3-0.98)*4.35*0.12-7.7*2*0.12+8*0.24*0.32.51一层卫生间木制隔断M28*216二层地面找平M240.68+10.7+248.31+117.49+21.66438.84二层走廊花岗岩M2(34.6-0.12-0.4-8)*1.5640.68二层走廊黑金砂M2(34.6-0.24-0.4-8)*0.4+1.56*0.210.7二层走廊100高不锈钢镜面踢脚线M(34.6-0.24-0.4-8)*2+1.96-2.36-3.7647.76二层抛光地砖M23.82*5.76*3+3.88*5.76+7.88*5.76+10.42*6.26+7.88*6.26248.31二层瓷砖踢脚线M3.82*3*2+5.76*3*2+3.88*2+5.76*2+7.88*2+5.76*2+10.42*2+6.26*2+7.88*2+6.26*2-10155.68控制室木地板M27.76*(14.7+0.44)117.49控制室100高木制踢脚线M7.76*2+15.14*2-1.544.3控制室不锈钢栏杆M5.2+1217.2二层卫生间防滑地砖M23.76*5.7621.66二层卫生间墙砖M2(6+3.76*3+3.6*2+3.76-1.4+5.76-0.24)*4.35-2.7*4129.97二层卫生间隔墙M3(3.76+5.76-1.3-0.98)*4.35*0.12-7.7*2*0.12+8*0.24*0.32.51二层卫生间木制隔断M28*216楼梯花岗岩M2(2.36-0.8)*(9+10.05-3.4)+(3.76-0.8)*(9.8+6.65)73.11楼梯黑金砂M20.8*(12+6.65+6.65+13)30.64楼梯踢脚线M4*2+1.44*2+2.36+2.6+2.36+1.26*2+8+2.48+4+3.76+4.35+245.31工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果一层门厅石膏板造型吊顶顶M211.76*8.18+0.3*(5.1+9.8)*2105.14一层走廊石膏板吊顶M2(14.7+0.44)*1.5+(34.6-11.76)*1.96+2.36*1.3+3.76*1.3+1.28*3.680.04一层机修间石膏板吊顶M23.76*6.2623.54二层走道石膏板吊顶M226.6*1.96+3.76*6.62+2.76*6.12+1.28*3.698.53二层房间石膏板吊顶M23.82*5.76*3+3.88*5.76+7.88*5.76+10.42*6.26+7.88*6.26+1.28*3.6+0.3*24260.119一二层卫生间集成扣板吊顶M23.76*5.88*2-1.28*3.6*235.0016二层控制室一层YP3铝塑板吊顶M2(14.7+0.44)*7.76+3.5*8.6147.59一层大厅美国白麻石材干挂M2(0.28*2+0.6)*2*3.5+(0.26*2+1)*3.5*640.04大门厅600*1200瓷砖干挂M24.1*3*2+11.76*359.88二层控制室木工板基层桃木饰面M2(0.45+0.16*2)*4*3+(0.45*3+0.16*4)*315.21二层接待室木工板基层桃木饰面M2(0.45+0.16*2)*4*3+3.5*423.24接待室墙纸M2(10.6-0.9-0.16*2+6.5-0.32)*3-1.2*1.8*3-2.7*234.8工程量计算书项目清单项目名称计算依据单位承包人申报监理审核备注计算式结果地下一层内墙涂料M2187.49+85.55+19.2*2.04312.21地下一层顶棚涂料M236.1*14.7+308.83-4*6.5-2.6*6839.510到11轴内墙涂料M2(14.47+0.44)*(9+1)+(0.8+1.26+1.5)*9181.1410到11轴顶涂料M212.84*1.519.26副厂房一层内墙涂料M23.82*2*2+6.1*2*2+10.36*2+6.6*2+15.76*2+6.26*2+6.26*2+3.76*2+7.76*2+5.76*2+11.76*2+8.68*2-4+8.2*2+(34.6-11.76)*2+1.56-3.76-2.36*3-1.2*1.8*9-1.5*2.7*4-1.2*2.7*4-2.7-0.6*5.1*3-1.6*3-1.6*2.8-3*2.8*3-3.4*3.7*2-3.6*3.9-0.6*5.1*3-1.6*3-1.6*2.8-3*2.8-3*3.9604.64副厂房一层顶涂料M211.76*8.18+0.3*(5.1+9.8)*2+(14.7+0.44)*1.5+(34.6-11.76)*1.96+2.36*1.3+3.76*1.3+1.28*3.6+3.82*6.1*2+10.36*6.6+15.76*6.26+7.76*5.76443.51副厂房二层内墙涂料M247.76+3.82*3*2+5.76*3*2+3.88*2+5.76*2+7.88*2+5.76*2+10.42*2+6.26*2+7.88*2+6.26*2+7.76*2+15.14*2*3-2.7*10-1.8*1.2*12-1.6*2.2*2-3.4*2.2
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 ISO 1813:2025 EN Belt drives - Electrical conductivity of antistatic belts: Characteristics and test methods
- 【正版授权】 ISO 5684:2025 EN Adhesives - Floor covering adhesives and products for flooring installation - Assessment and classification of low volatile organic compound (VOC) products
- 2026年中国时尚业发展展望及投资策略报告
- 高二历史同步讲义(选择性必修1):第17课 中国古代的户籍制度与社会治理
- Z170型无限船用柴油机随机技术文件
- 河南数学高中会考试卷及答案
- 南阳生物中招试题及答案
- 2025年分析中考真题试卷及答案
- 贵州地理会考试题及答案
- 2025年护理健康指导试题及答案
- 2025城发环保能源(汝南)有限公司招聘4人笔试历年备考题库附带答案详解试卷3套
- 河北省沧衡名校联盟2025-2026学年高三上学期11月期中考试语文试题(含答案)
- 2025年酉阳土家族苗族自治县辅警招聘考试真题附答案详解(满分必刷)
- 世界艾滋病日健康讲座
- 2025-2026学年河南省天一大联考高一上学期9月月考历史试题
- 省级总代理合同协议范本2024
- 物业公司服务标准手册
- 爱情合同协议电子合同
- 有趣的汽车越野教案
- 城市商业综合体管理运营策略分析
- 国开2025年《行政领导学》形考作业1-4答案
评论
0/150
提交评论