




已阅读5页,还剩57页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of第一章 编制依据及原则11 编制依据111 湖北鼎元建筑装饰工程有限公司外装饰施工设计图;112 本工程现场实际情况;113 本公司质量手册和程序文件及相关管理制度要求;114 国家现行规范、标准要求。12 编制原则121 编制本施工组织设计力求全面、细致;122 编制本施工组织设计力求具有针对性和可操作性,达到实用要求;123 编制本施工组织设计力求具有指导性,能指导本工程全过程的施工与管理;124 编制本施工组织设计力求能反映本公司的技术实力、施工实力和施工管理水平;125 本施工组织设计若经本公司、监理公司和甲方审批后,将成为本工程项目施工的纲领性指导文件,属于公司贯标管理体系的重要组成部分。第二章 工程概况及特点21 工程概况211本工程为浙江省金华市浦江三联房地产公司开发建设的一家四星级酒店,工程位于浦江县环城南路,主体结构为21层框架结构,裙楼5层,塔楼16层,主体结构建筑高度为87.4m由浙江工业大学建筑设计院设计,现主体结构已全部施工完成。212外墙装饰设计由湖北鼎元建筑装饰工程有限公司设计,外墙装饰设计形式主要有明框玻璃幕墙,全玻点支式幕墙,石材幕墙,铝塑板幕墙,氟碳金属漆等,外装包括门楼钢结构补形,主楼19层以上钢结构补形及观光电梯全玻玻璃罩、门楼及屋面补形部分彩钢板屋面等。外装总面积约13500平方米。22 工程特点:221本工程为高层建筑,外装面积大,垂直运输难度大,工作量大; 222幕墙形式多,且工作量分散;223施工单位多,协调工作量大,管理复杂;第三章 工程主要施工内容及工程量、主要材料及用量31主要施工内容本装饰工程我公司承担的主要施工内容有外墙石材幕墙、玻璃幕墙、铝塑板金属幕墙、19层以上钢结构补型及门楼钢结构等。32 主要工程量(见下表)主要工程量清单序号主要施工内容工作量单位备注1石材幕墙2石材幕墙线条m3明框玻璃幕墙4点式玻璃幕墙5铝塑板幕墙6铝塑板吊顶7GRC线条m8钢结构制安t33 主要材料及用量(见下表)主要材料及用量清单序号材料名称规格数量单位拟进场时间备注1幕墙石材开工后 天进场需加工成型2幕墙石材线条m开工后 天进场需加工成型3幕墙铝型材150系列t 4明框幕墙玻璃开工后 天进场需加工成型 5点式幕墙钢化玻璃厚=12开工后 天加工成型进场安装 6双面铝塑板厚=4开工后 天定型加工进场 7角钢50*50*5t开工进场分批 8角钢63*63*6t开工进场分批 9角钢40*40*4t开工进场分批 10槽钢10号t开工进场 11槽钢25号t开工进场 12镀锌角钢50*50*5t开工进场分批13钢板厚=14t开工进场14钢板厚=12t开工进场15钢板厚=10t开工进场加工成型后镀锌16GRC线条m开工后 天第四章 施工组织和部署41 总体部署411 按要求成立浙江浦江国际大酒店装饰工程项目经理部,配备强有力的项目管理班子,并且对设计、施工、技术、质量、材料设备供应、安全文明施工等项目部将明确专人负责,以便协调和管理,保证工程施工顺利进行。412 管理目标质量目标:争创优质工程;进度目标:绝对工期146天;安全和文明施工目标:保证重大伤亡事故为零,轻微事故1%42 管理体系421 项目管理体系钢结构作业队石材幕墙作业队玻璃幕墙作业队422 项目管理人员配备序号姓名岗位职务职称学历持证情况1黄远明项目经理工程师大专二级项目经理2马国栋项目工程师助理工程师大本二级项目经理3张新旺施工员高中施工员4胡明珠预算员助理工程师大专预算员资料员资料员5金成亮材料员高中材料员6程育军安全员高中安全员423 项目部各岗位主要职责4231 项目经理A、代表公司对本项目全面负责,以全面履行工程承包合同为已任;B、对工程施工进行组织、指挥、协调和控制,保证质量、工期、成本、安全和文明施工目标的实现;C、负责对施工进行总体安排,对人、材、物进行调度,以满足工程需要,保证施工顺利进行;D、负责和甲方、监理单位、政府相关部门、公司各部门进行联系和沟通、解决相关问题;E、负责对项目部各成员进行工作安排和分配,并进行督促和检查。4232项目工程师A、负责项目全面的技术管理工作;B、负责组织图纸自审、会审,技术交底,施工组织设计和施工作业设计的编制;C、负责项目技术规范,标准配备及管理;D、负责协助项目经理进行管理,主管项目技术、质量、资料管理工作;E、负责工程竣工图的绘制。4233项目施工员A、负责现场的施工管理工作;B、负责日常施工作业的安排编制,施工周计划,月计划;C、负责各工种的工序安排和工序交接;D、负责编写项目施工日志,工序交接单,砼施工记录等;E、负责现场平面定置管理。4234项目质量员A、负责工程施工质量,对工程施工全过程进行监督和检查;B、负责工程分部(子分部)项划分,并配备相应的检验和评定表格;C、负责组织隐蔽工程检查验收,并填报相关表格资料;D、负责编写项目质量检查计划,并负责质检计划的实施;E、负责材料质量送检和报验。4235项目预算员A、负责工程预算工作和决算工作;B、负责工程合同管理,包括总包合同和分包合同;C、负责按工程进度编制工程预算,并向甲方申报进度款;D、负责协助项目经理进行成本管理,协助鉴订分包合同;E、负责组织合同交底,协助办理施工鉴证。4236项目设计员A、负责组织设计交底;B、负责对施工图进行完善,解决施工中的设计问题;C、负责就设计问题与甲方进行沟通,并就甲方意见鉴发设计变更通知单。4237项目安全员A、负责项目施工安全管理工作,为项目安全第一直接责任人;B、负责安全检查和验收以及安全教育和宣传;C、负责安全管理资料的收集和整理;D、负责现场文明施工管理。4238项目材料员A、负责工程施工中的工程用料和施工用料的采购;B、负责现场材料的堆放保管和标识;A、 负责材料的进库,出库登记台帐。43 施工准备431 技术准备。工程开工前,项目部应组织图纸自审、会审工作,将技术规范、标准配备齐全,相应的资料表格配备齐全,监视和监测装置配备到位,并搞好设计交底和技术交底。432 劳动力准备。根据本工程实际工作内容,在公司劳务层通过竞标确定施工作业队伍,相关技术工种作业人员均需持证上岗。所要求工种及人员配备数量如下表。劳动力计划表序号工种数量(人)进场时间持证情况备注1石材幕墙工20开工65天2玻璃幕墙工15开工45天上岗证3木工5 开工进场4电工1开工前进场上岗证5电焊工12开工进场上岗证7小工15开工进场分批进场433 材料准备。开工前应做好材料计划,准备好大临设施材料,并组织进场;对型钢、铝型材、石材、玻璃等主要工程用料联系确定厂家,签订好供货合同。434 机械设备准备。开工前应组织现场施工所需的机械设备进场,并检查其状况,进场后做好试运行,并做好试运行记录,所需机械设备及用具如下表:序号设备名称规格型号数量功率(kw)拟进场时间备注1手提石材切割机牧田410122.5开工60天进场2打胶枪手动6开工60天进场3飞机钻2开工45进场4手电钻12开工进场5电锤日立384开工进场6台式钻床Z162开工进场7电焊机BX3-500-310开工进场分批8铆钉枪5开工45天进场9铝材切割机2开工45天进场10砂轮切割机2502开工进场11三相切割机2开工进场435 施工用水、用电。本工程采用土建单位用水点,不再另接用水点,施工用电由甲方配电房新接,临时电源箱共8个,底层2个,屋顶2个,19楼1个,裙楼西立面屋面2个,每处功率50kw,四楼总配电箱1个,共350kw。436测量放线。开工前由土建单位进行轴线和标高交底,项目工程师和施工员按土建单位轴线和标高交底将横向、纵向各轴线点及标高投设到外墙面,此轴线和标高将作为施工的基准点,测设标识完应填报测量放线定位记录表。44总体施工安排和部署施工安排:先施工19层以上钢结构补形、彩钢板屋面、GRC线条、明框幕墙、门楼钢结构;再施工门楼点式玻璃幕墙、主楼铝塑板幕墙、裙楼明框幕墙;最后施工石材幕墙及门楼铝塑板吊顶。施工分三个作业班组:钢结构施工班组、玻璃幕墙施工班组及石材干挂班组。441流水段的划分。 由于本工程工期紧,除外装外还有屋面局部钢结构加层补型和增加门厅钢结构等结构改造,因此我公司拟分三个流水阶段进行平行流水施工。其中钢结构改造为第一流水段,外墙装饰为第二流水段,石材干挂为第三流水段。442 主要分项分承包情况分承包情况表序号项目名称工程量单位分包情况分包单位备注1钢结构补型105t不分包2石材幕墙不分包3石材线条m不分包4玻璃幕墙不分包5全玻璃幕墙不分包6GRC线条m不分包7铝塑板吊顶不分包45 施工平面布置451 作业工人住房、仓库及项目部办公室按甲方指定四楼区域,搭设简易大临设施,管理人员住房在附近租赁。铝型材加工、铝板加工、玻璃加工及小型结构加工在四楼指定区域。452屋面补型钢结构在屋面制作安装,门厅钢结构在一楼制作安装。 第五章 主要子分部或分项工程施工及验收51 结构改造工程分部5.1.1屋面钢结构补型及门楼钢结构施工(1)钢结构制作A、 钢结构制作按设计图纸经与现场实际尺寸经复核后,在现场加工制作;B、 与原主体结构连接的埋件在现场加工制作;C、 钢梁、钢柱的加工制作按设计要求进行下料焊接,焊缝的厚度和长度应符合设计和规范要求。D、 钢结构柱、梁制作应保证有平整的场地,故本工程拟用2根14槽钢找平制成中到中600mm宽制作平台,放置于楼面上找平,供钢结构梁、柱制作用,此制作平台共两个;(2)钢结构油漆A、 钢材进场即除锈刷防锈底漆一遍,然后方可下料制作;B、 钢结构柱、梁制作完成,即可刷第二遍防锈漆,然后刷第一遍面漆,待安装完成后,刷第二遍面漆;C、 钢结构油漆涂刷要均匀,漆膜厚度应达到设计要求,不可露底、起皮、开裂,每刷一遍应待上一遍干后再刷。(2)钢结构运输A、 钢结构材料垂直运输采用土建单位塔吊;B、 钢结构在屋面水平运输采用人工抬运。(3)钢结构安装A、 钢结构安装应搭满堂脚手架;B、 钢结构柱及梁安装采用2吨手拉葫芦吊装;C、 先安装钢结构柱,再吊装钢结构梁,逐层安装;D、 钢结构柱由于较高,施工中将按设计要求将钢柱分成三段组装,组装节点按设计节点图施工;E、 钢结构柱垂直度及轴线控制:底层钢结构柱安装按底板平面定位,将钢结构柱下部点焊定位后,通过吊线垂控制单根柱的垂直度,单根柱安装完成后,将单根柱用两根50角钢逐根点焊连成整体,保证相临每根间的间距;F、 钢梁安装顺序是逐层安装与土建主体结构连接的钢梁,最后安装钢柱间的钢梁;G、 钢结构安装完后,应将焊缝补刷防锈漆;H、 钢结构施工完,再施工彩钢板屋面; I、 屋顶及门楼钢结构安装均需搭设满堂脚手架(具体另写方案要求)52 装饰装修工程分部本外装饰工程主要是石材幕墙,明框玻璃幕墙,点式玻璃幕墙,铝塑板幕墙,门楼铝塑板暗龙骨吊顶等,装饰分部(或子分部)与分项工程划分如下表。装饰工程各子分部与分项工程划分表分部子分部名称分项工程名称装饰分部幕墙工程玻璃幕墙铝塑板金属幕墙石材幕墙吊项工程暗龙骨吊顶521点支式玻璃幕墙A本工程点式玻璃幕墙为悬吊式玻璃幕墙;B、点支式幕墙安装是在钢结构施工完后,提出幕墙玻璃下料计划,在玻璃生产厂家定型制作运至现场安装;C、钢结构梁及底板(座)施工完后,安装肋玻璃不锈钢槽,然后安装肋玻上部不锈钢驳接件,再安装肋玻;D、肋玻安装固定好,再安装不锈钢驳接件,调整平整度和直线度可通过拉通长线的方式;E、幕墙玻璃安装顺序是从下往上逐层调平,逐层安装;F、玻璃安装好后,块间缝应用无色耐候密封胶填充;522明框玻璃幕墙工程(1)施工准备A、熟悉图纸,对照图纸和现场,核准板块划分;B、定购材料,按图纸设计提出材料计划,定购材料;C、准备施工机具和测量器具;D、进行测量放线,弹出横竖龙骨位置线,以及埋件位置线;E、材料取样送检,安装前取得复检合格证明。(1)施工工艺 测量定位埋件安装防雷接地龙骨安装调平结构隐蔽验收补刷防锈油漆板块制作防雷接地验收玻璃板块安装注耐候胶填缝型材切割下料清洁卫生验收(2)施工方法及注意事项A、测量放线。按一层标高、轴线放线基准点,按设计板块划分和龙骨布置图,将立杆弹线定位,并弹出锚固埋件位置线;B、埋件安装。用冲击电锤按锚固埋件位置线钻孔,通过膨胀螺栓(或化学螺栓)将埋件固定,钻孔深度应达到要求,螺栓应拧紧,埋件不得松动,并应满足设计抗拉拔要求;C、龙骨安装调平。安装顺序为:竖杆横杆防雷接地补防锈漆。竖杆安装时应吊线锤,拉水平线,以保证单根竖杆垂直度和竖杆相互间的平整度,竖向龙骨安装调平后将螺栓拧紧,然后安装横向龙骨,横向龙骨以竖向龙骨水平度为准,龙骨安装完后应做好隐蔽验收记录。竖向龙骨一般3m以上,等于层高,上下框连接采用内框套料连接,上下框断开约10mm 作伸缩缝。D、玻璃安装。玻璃板块制作在加工厂制作,运至现场安装,玻璃板块均需四边磨边,玻璃与下部横杆接触处应垫橡胶垫片,不得直接接触,橡胶垫片为8mm,玻璃安装前应沿四周双面粘贴双面胶条,安装到位后,注耐候密封胶。E、防雷接地。龙骨安装完后应进行防雷接地施工,其施工应按防雷接地设计要求进行,施工完应进行防雷接地检测,检测应作好记录资料。玻璃安装的质量控制流程图安装工资格考核办理工序交接手续测量定位中间抽查玻璃缝宽要一致玻璃面要平整注意玻璃安装标准安 装保证打胶质量自检执行验收标准清理现场、文明施工质量评定焊条合格证玻璃出厂合格证资料整理测量记录自检记录质量评定记录施工记录(4)玻璃幕墙工程的检查验收施工质量验收规范的规定主控项目1各种材料、构件、组件第9.2.2条2造型和立面分格第9.2.3条3玻璃第9.2.4条4与主体结构连接件第9.2.5条5连接紧件螺栓第9.2.6条6玻璃下端托条第9.2.7条7明框幕墙玻璃安装第9.2.8条8超过4m高全玻璃幕墙安装第9.2.9条9点支承幕墙安装第9.2.10条10细部第9.2.11条11幕墙防水第9.2.12条12结构胶、密封胶打注第9.2.13条13幕墙开启窗第9.2.14条14防雷装置第9.2.15条一般项目1表面质量第9.2.16条2玻璃表面质量第9.2.17条3铝合金型材表面质量第9.2.18条4明框外露框或压条第9.2.19条5密封胶条第9.2.20条6防火保温材料第9.2.21条7隐蔽节点第9.2.22条8明框幕墙安装允许偏差(mm)幕墙垂直度幕墙高度30m1030m幕墙高度1560m90m25幕墙水平幕墙幅宽35m5幕墙幅宽35m7构件直线度2构件水平构件长度2m2构件长度2m3相邻构件错位1分格框对角线长对 角 线 长度2m3对角线长度2m4523石材幕墙工程施工验收(1)施工准备A、熟悉图纸,结合现场实际,搞好板块划分;B、按设计要求订购石材,将样品送检,请甲方、监理公司确认;C、将石材按实际分格板块尺寸制下料单,按下料单向石材供应厂家订货加工,并需将石材块料编号,以便施工。对石材线条,需向厂家提供大样图。D、将石材开槽机、钻孔机、切割机等加工机具,电锤、砂轮切割机等施工机具准备到位。(2)施工工艺复测预埋件位置尺寸及土建主体结构尺寸测量放线绘制工程翻样图金属骨架加工金属骨架安装隐蔽工程验收钢结构刷防锈漆 安装质量检查防火保温棉石材表面防护安装底极件现场置尺放线石材饰面板加工石材饰面板安装安装质量检查质量检查灌注嵌缝硅胶幕墙表面清洗(3)施工方法A、基层处理:结构表面的残留物应清理干净,基层平整度或垂直误差不能大于30mm,超出此标准必须剔凿或修补,若剔凿修补难度较大时,可请设计人员调整钢龙骨布置和石材加工料,B、测量放线:进场后对标高和轴线进行校核,做到心中有数,并用水准仪将水平线反投到外墙面,尤其需校准首层基准线,再用经纬仪或线锤在墙面弹出竖向(轴线)控制线,若发现误差,及时调整尺寸。对于预留孔洞位置、尺寸、必须标注清楚准确。C、安装骨架及挂件:对墙上没有予埋件的连接点,采用膨胀螺栓或化学螺栓,膨胀螺栓扩孔时,其孔径控制在12+2=14mm,膨胀螺栓必须胀紧,用300NM 扭力扳手抽查左右,胀紧后经检查后方可电焊固定埋件。膨胀螺栓或化学螺栓安装步骤:.在外墙上按竖线安装竖向龙骨,每根上下二端距离二端头各180mm左右各补一处胀孔,胀孔控制在范围内。.对打完的胀孔进行检查、清理,把残渣用毛刷清干净,然后请质检人员进行检查。.查清强力胶的配合比,将两种材料配合后进行均匀搅拌,室外温度在23时,拌合后在分钟内使毕。.将搅拌均匀的强力胶送入孔底,灌至栓孔一半高度,使胶能挤满外面(此灌胶高度可根据现场施工试验决定),无论用何种操作形式,栓孔内壁必须挤满胶。.用长扳手由专人负责上紧螺栓。对每个螺栓上紧螺母,所使用的力量要均匀一致。对上紧螺栓,用300扭力扳手进行检查,抽查时,扭力扳手的力控制在100110NM的范围内,一般抽查左右。焊接钢龙骨:.竖向龙骨与埋件:竖向龙骨与角钢L50*50焊接长度必须60mm,焊接高度5mm ,主埋件焊件长度120mm。.角钢水平焊接时位置要准确,其水平位置偏差不大于5mm ,且必须经常核对位置,焊接前对在运输、堆放和安装中所造成变形的角钢必须矫正。.钢材采用Q235,焊条采用天津大桥牌焊条E4313型号或猴王焊条,若受潮必须烘干。.焊接质量必须符合钢结构的规范要求,焊接表面严禁有裂纹、夹渣、焊瘤、烧穿、弧坑、针状和熔合性飞溅等缺陷,气孔、咬边必须符合施工规范要求,且焊波均匀,焊完后焊渣和飞溅物必须清除。.竖向龙骨安装时应吊线锤,拉水平线,以保证单根垂直度和竖杆相互间的平整度,竖向龙骨安装调平后将螺栓拧紧,然后安装横向龙骨,横向龙骨以竖向龙骨水平度为准,龙骨安装完后应做好隐蔽验收记录,上下框连接采用内框套料连接,上下框断开约10mm 作伸缩缝。.现场焊接点必须做防锈处理,刷二遍防锈漆,严禁漏刷。D、防雷接地。龙骨安装完后应按设计要求进行防雷接地施工,其施工应按防雷接地设计要求进行,施工完应进行防雷接地检测,检测应作好记录资料。E、石材安装:.按现场实际尺寸对进场石材二次加工,编号石材四周或背侧开槽或开孔应保证与挂件一致。.安装必需挂水平线和吊垂直线,按分格和编号由下往上挂贴,通过挂件调整水平度、垂直度、缝隙大小等,调整好后,拧紧挂件螺丝,注石材结构胶固定。 钢结构制作的质量控制程序钢材焊条准备合格证学习图纸和技术资料明确操作规程和质量标准场地和焊接工具准备准备工作电焊工考试合格检验工具准备工地技术人员向现场操作人员进行书面交底技术交流核实下料品种、规格、尺寸制作大样拼架下 料按不同型号挂牌焊接试样实验钢结构焊接工程质量程序制 作执行验评标准材料代用核定单质量评定不合格品的处理(返工)材料合格证焊接实验记录自检记录质量评定记录资料整理出厂合格证明施工记录办理出厂合格证明钢结构安装的质量控制程序学习图纸和技术资料明确操作规程和质量标准检查合格证明、钢结构就位焊条焊剂准备检查合格证焊接工具的准备和检验电焊工资质检查准备工作吊装前对钢结构复检技术交底办理和上道工序的交接测量定位资料整理施工记录注意构件安装标高和平面位置焊接质量控制程序安 装焊条合格证不合格品的处理招待验评标准质量评定测量记录中间抽查自 检钢结构出厂合格证办理出厂合格证明质量评定记录自检记录钢结构焊接工程质量控制程序检查焊条合格证学习图纸和技术资料、明确操作规程和质量标准焊接记录质量评定记录自检记录焊接实验记录自检中间抽查电焊资质检查焊条烘熔质量评定现场整理技术交流准备工作准备、检验焊接工进行和上道工序交接的质量检查、特别注意检查焊缝区的处理情况 焊 接首次施焊的钢和焊接材料要进行性艰测试钢材预热保证焊缝长度和烘焙记录办理下道工序的交接手续焊条合格证及烘焙记录清除熔渣及金属飞油物在焊接缝附近打上钢印代号现场整理焊缝质量检验记录清理现场、文明施工执行验评标准不合格品的处理资料整理钢结构涂装工程质量控制程序配洗、喷丸机械除锈准备油漆检查合格证施工准备油漆时相对温度不应大于85%办理上道工序交接手续不得任意稀释油漆后4小时严防雨淋控制漆膜厚度控制设计要求涂刷遍数防止灰尘污染施 工自 检中间抽查不合格品的处理(返工)资料整理质量评定执行验评标准施工记录质量评定自 检隐蔽验收记录油漆质量证明清理现场、文明施工(4)石材幕墙工程验收项次项 目允许偏差(mm)检查方法光面镜面粗磨面麻面条纹面天然石1立面垂直室内2235用2m托线板检查室外245-2表面平整123-用2m靠尺和楔形塞尺检查3阳角方正234-用200mm方尺和楔尺检查4接缝平直2345拉5m线检查,不足5m拉通线和尺量检查5墙裙上口平直6接缝高低0.3120.5用方尺和塞尺检查7接缝宽度0.3112用塞尺检查施工质量验收规范的规定主控项目1材料质量第9.4.2条2造型、分格、颜色、光泽、花纹、图案第9.4.3条3石材孔、槽第9.4.4条4预埋件和后置埋件第9.4.5条5各种构件连接第9.4.6条6框架和连接件的防腐第9.4.7条7防雷装置第9.4.8条8防火、保温、防潮材料第9.4.9条9结构变形缝、墙角连接点第9.4.10条10表面和板缝处理第9.4.11条11板缝注胶第9.4.12条12防水第9.4.13条一般项目1表面质量第9.4.14条2压条第9.4.15条3细部质量第9.4.16条4密封胶缝第9.4.17条5滴水线第9.4.18条6石材表面质量第9.4.19条7安装允许偏差(mm)幕墙垂直 度幕墙高度30m1030m幕墙高度60m2560m90m25幕墙水平度3幕墙表面平整度光2麻3板材立面垂直度3板材上沿水平度2相邻板材板角错位1阳角方正光2麻4接缝直线度光3麻4接缝高度差光1一接缝宽度光1麻2526吊顶工程施工验收本外装工程吊顶只包括门楼内铝塑板吊顶。吊顶为暗龙骨吊顶。平顶部分采用UC50系列主龙骨,铝塑板饰面,造型灯槽部分主龙骨为UC50系列,造型采用木芯板基层,白色铝塑板饰面。5261 吊项工程施工(1)施工准备A、熟悉图纸,将吊顶工程材料用量计划提交采购人员,采购材料;B、将一层标高线用水准仪测投至通道吊顶次龙骨标高,在墙面标识;C、在结构顶板上弹吊杆位置线;D、准备施工用门式台架,准备好加工铝塑板的工作台。(2)施工工艺测量弹标高线安装吊杆安装主龙骨安装次龙骨调平隐蔽验收 安装面板分隔缝填胶揭去保护膜验收(3)施工方法及注意事项A、测量弹标高线。由施工员和项目工程师将标高线测投至吊顶次龙骨标高处,并标识在墙面上,吊顶木工根据此标高线来进行吊顶标高施工控制,同时应将吊杆位置线逐排弹出。B、安装吊杆。按所弹吊杆位置线,将埋件铁板固定,将吊杆与埋铁焊接,吊杆长短规格应一致;C、安装主龙骨。主龙骨安装应以墙面标高线为准,用尼龙线拉水平线找平安装,主龙骨和吊杆连接采用UC50系列连接件,次龙骨安装应先在结构项板上用水准仪按3m间距测标高点,然后以标高控制点控制该点次龙骨标高,其它部位次龙骨标高以此处标高拉水线控制,当面积较大时,应按要求起拱;D、安装面板。龙骨安装调平完后,需作隐蔽工程验收,合格后即可安装面板。面板安装应按板缝分格要求下料,面板切割边应刨平直,不能有毛边,面板采用结构胶粘贴牢固,不得空鼓,翘边,灯槽处阳角应作碰角处理;E、分格缝填胶。面板粘贴完,板缝应刮胶填平,待胶干后,铝塑板面层保护膜才可以按箭头指示方向揭去。5262 吊项工程验收施工质量验收规范的规定主控项目1标高、尺寸、起拱、造型第6.2.2条2饰面材料第6.2.3条3吊龙、龙骨、饰面材料安装第6.2.4条4吊杆、龙骨质量第6.2.5条5石膏板接缝第6.2.6条一般项目1材料表面质量第6.2.7条2灯具等设备第6.2.8条3龙骨、吊杆接缝第6.2.9条4填充材料第6.2.10条5项目允许偏差检验方法纸面石膏金属板矿棉板木板、塑料板、格表面平整4222用2m靠尺和塞尺检查接缝直线41.544用5m线,不足5m拉通线,用钢尺接缝高低111.51用钢直尺和塞尺检查第六章 项目质量管理计划61 质量方针以市场为主导,以设计为根本,以技术为保障,以信誉求发展,以质量求生存,以客户为中心。62 质量目标争创优质工程63 质量管理体系 产品实现顾 客 满 意顾 客 要 求资源管理质量管理体系的持续改进管理职责测量、分析和改进产品 输入 输出 增值活动 信 息 网图1:以过程为基础的质量管理体系对特定产品、项目的质量管理的过程和资源做出的规定A级质量管理体系文件质量手册施工组织设计项目质量计划B级质量管理体系文件程序文件施工组织设计项目质量计划C级质量管理体系文件D级记载活动及结果记录资料图2:质量管理体系文件的结构64 质量管理措施641 质量对人员的要求6411 对管理人员的要求。项目管理人员的质量意识,管理和技术水平,工作责任心和态度等对工程的形成过程将产生直接的影响,因而项目管理人员的配备及人员素质至关重要。我公司拟配备岗位齐全,责任明确,技术素质全面的项目管理班子,并成立以项目经理为组长,技术负责人和质检员为副组长的项目质量管理小组。6412 对作业工人的要求。作业工人是建筑产品形成的直接责任人,其技术水平和质量意识将直接影响产品质量,因而作业工人的选择和配备至关重要。我公司拟在公司劳务层中挑选技术水平高,工作责任心强的各工种作业人员,并签订质量责任书和奖罚措施。642质量对材料的要求(1)型钢。幕墙用的龙骨型材应采用正规厂家生产的产品,进场应取样送检,并检查其合格证。(2)石材。石材定货加工前应先取样送检,符合甲方要求和国家规范要求才能进行加工,加工完后进入现场应检查其加工成型质量,看成型是否符合图纸设计要求。(3)铝型材。铝型材必须有出厂合格证和检验报告,应见证取样送检,符合要求才能使用。(4)结构胶、焊条、铝塑板等其它材料进入现场使用均需有合格证明或材质报告,对无合格证的产品一律作为不合格品不得使用。643质量对机具的要求(1)石材干挂切口开槽采用专用的石材开槽机,以保证其精度和质量。(2)玻璃加工采用大型专用机械加工,不采用手工机具加工,以保证其加工成型质量。644 质量管理制度(1) 技术交底制度坚持以技术进步来保证施工质量的原则。技术部门应编制有针对性的施工组织设计,积极采用新材料、新设备、新工艺、新技术;针对特殊工序编制具有针对性的作业设计,每个工种、每道工序施工前要组织进行各级技术包括项目工程师对工长的技术交底,工长对班组长的技术交底,班组长对作业班组的技术交底。各级交底以书面进行,因技术措施不当或交底不清而造成质量事故的要追究相关部门和人员的责任。(2)材料进场检验制度本工程的钢材、饰面材料等各类材料需具备出厂合格证,并根据国家标准要求分批进行抽查检验,抽查不合格的材料一律不准使用,因使用不合格材料而造成的质量事故追究验收人员的责任。类材料:需要合格证;类材料:需要合格证外,还需取样送检;类材料:需要合格证,取样送检外,还需龄期检验。(3)样板引路制度施工操作注意工序的优化、工艺改进和工序的标准化操作,通过不断探索,积累必要的管理和操作经验,提高工序的操作水平,确保操作质量,每个分项工程或工种(特别是量大面广的分项工程)都要在开始大面积施工前做出示范样板,包括房样板、墙样板、柱样板、地面样板等,统一操作要求,明确质量目标。(4) 施工挂牌制度主要工序如基层、贴面工程等,施工过程中在现场实行挂牌制,注明管理者、操作者、施工日期,并做相应的图文记录,作为重要的施工档案保存,因现场不按规范、规程施工而造成质量事故的要追究有关人员的责任。(5) 过程“三检”制度实行坚持自检、互检、专检制度,自检由班组长记录,隐蔽工程要由工长组织项目技术负责人、质检员、班组长共同进行检查,并做出较详细的记录;专检由项目专职质检员进行检查。(6) 质量一票否决制度对不合质量要求的分项、分部(子分部)工程必须进行返工,不合格工序流入下道工序,要追究班组长的责任,不合格分项工程流入下道工序,要追究工长和项目施工员的责任,有此责任的人员要对出现不合格的原因采取必要的纠正和预防措施。(7)质量例会制度 项目按周举行质量例会,例会由质量员组织,项目经理参加,项目部管理人员和工长、班组长全部参加。(8) 质量文件制度质量记录是质量责任追溯的依据,应力求真实详尽,各类现场操作记录及材料试验记录,质量检验记录等要妥善保管,特别是各类工序交接的处理,应详细记录当时的情况,以便分清各方责任。(9) 资料求实制度技术资料的管理、编制、整理和汇总,应做到与施工过程的实际情况相符,做到分类科学,记录准确,其中的图表规格,填写方法、计量单位、符号使用等,均应按国家有关规定要求执行。施工中对各施工程序、环节和系统技术资料严格控制,按天做好施工日记,按分项、分部工程做好安全技术交底;按规定索要材料、成品、半成品出厂合格证书,按国家施工规范要求做好取样送检,同时,每个分项工程结束后,要有分项质量检验批验收资料,每个子分部工程完工后,都应有质量评定汇总,全部施工资料要在竣工后,按要求将资料移交档案馆。(10)工程质量等级评定制度工程竣
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 直播电商2025年主播与品牌合作模式创新策略与风险防控
- 2025-2030年全球新能源产业海外投资案例分析报告
- 机关工会活动策划方案范文
- 熊皮人阅读测试题及答案
- 教育测评考试试题及答案
- 南通会议考试试题及答案
- 2025年电商知识产权保护与知识产权保护法律风险评价报告
- DB65T 4498-2022 高压气地下储气井定期检验规则
- DB65T 4415-2021 机采棉田土壤封闭除草技术规范
- 唱歌 爸爸妈妈听我说说课稿-2025-2026学年小学音乐西师大版三年级下册-西师大版
- 公共危机管理概论课件
- 稀土元素-稀土的应用
- JGT161-2016 无粘结预应力钢绞线
- 人事档案摘抄表
- 造价咨询(三级复核记录表)
- 初步验收证书
- 六年级数学上册奥数题-分数乘法(附答案)
- 快递工程系列(技术员、助理工程师)职称考试-快递设施设
- 城市轨道交通调度指挥高职PPT完整全套教学课件
- 高职《高等数学》说课稿
- 中国图书馆分类法讲座
评论
0/150
提交评论