别墅区地埋式生活污水处理站施工方案.doc_第1页
别墅区地埋式生活污水处理站施工方案.doc_第2页
别墅区地埋式生活污水处理站施工方案.doc_第3页
别墅区地埋式生活污水处理站施工方案.doc_第4页
别墅区地埋式生活污水处理站施工方案.doc_第5页
已阅读5页,还剩65页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through compliance reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 points) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 million Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performance (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the development and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.52 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig industry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emergence of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Western bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements. Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, about 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .别墅区地埋式生活污水处理站施 工 方 案2013年目录施工方案- 1 -第1章 施工技术标准、规范- 1 -1.1企业标准、规定- 1 -1.2施工安全技术标准- 1 -1.3质量检验评定标准- 2 -1.4施工技术规范、标准- 2 -第2章 施工准备- 4 -2.1 施工准备工作计划表- 4 -2.2 技术准备- 4 -2.3 拟投入的物资及机械设备- 5 -2.4 劳动力资源分配- 6 -2.5 质量工作准备- 6 -2.6 生产准备- 7 -2.7 材料准备- 7 -2.8 技术准备- 7 -第3章 施工技术方案- 9 -3.1 施工测量- 9 -3.2 土方工程- 10 -3.3 模板工程- 12 -3.4 钢筋工程(地埋设备基础施工阶段)- 14 -3.5 混凝土工程- 18 -3.6 砌体工程- 21 -3.7 设备安装工程- 23 -3.8电气施工方案- 26 -第4章 对关键过程的控制- 30 -4.1 电气系统的隐蔽工程- 30 -4.2 送、配电调试- 30 -4.3 仪表安装、调试电的关键技术要点- 31 -第5章 调试方案- 34 -第6章 施工进度安排及保证措施- 36 -6.1 施工进度计划- 36 -6.2 进度保证措施- 36 -第7章 确保工期的技术措施- 37 -第8章 工程的质量目标及保证工程质量的措施计划- 39 -8.1工程的质量目标- 39 -8.2 质量保证管理体系- 39 -8.3 保证工程质量的措施计划- 40 -8.4 成品保护措施- 45 -第9章 施工中的协调配合- 46 -9.1与土建单位的配合- 46 -9.2 与甲方、监理的协调配合- 47 -9.3 与其它施工单位的协调配合- 47 -第10章 确保使用的材料、设备为品牌产品的措施- 48 -第11章 文明施工措施- 49 -11.1 文明施工管理网络- 49 -11.2 管理措施- 50 -第12章 保证施工安全的技术措施- 51 -12.1 安全施工原则- 51 -12.2 安全施工目标- 51 -12.3 应急准备与响应- 51 -12.4安全保证措施- 51 -12.5安全用电- 52 -12.6 防火措施- 53 -12.7 安全活动制度- 53 -12.8成品保护与经济保卫工作措施- 54 -第13章 文明施工技术组织措施- 55 -13.1 现场布置- 55 -13.2 现场卫生管理- 55 -13.3 防止地下管线及地下地上设施的破坏- 56 -13.4 现场文明施工管理- 57 -13.5 环境控制- 57 -第14章 降低工程成本措施- 59 -14.4 现代化工程管理方法- 59 -14.2成本控制管理措施- 59 -第15章 工程保修及服务- 61 -4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent . 施工方案第1章 施工技术标准、规范针对工程施工内容,该工程安装施工主应遵守施工图设计所选用的和以下技术标准、规范:1.1企业标准、规定工程施工档案资料收集整理规定施工现场准备管理标准文明施工现场管理标准施工现场材料管理标准施工现场机械设备管理标准施工现场安全管理标准施工现场进度管理标准施工现场质量管理标准施工现场经济核算管理标准施工现场思想政治工作及民主管理标准安装工程质量控制上点安装工程施工程序标准建筑安装工程施工工艺及操作规程工程质量管理点管理标准焊接工程工艺标准防雷接地工程工艺标准1.2施工安全技术标准JGJ46-88施工现场临时用电安全技术规程JGJ33-86建筑机械使用安全技术规程JGJ80-91建筑施工高处作业安全技术规范GB50194-93建筑工程施工现场安全用电规范JGJ59-88建筑施工安全检查评分标准原国家建筑工程总局建筑安装工人安全技术操作规程1.3质量检验评定标准GBJ300-88建筑安装工程质量检验评定统一标准GBJ301-88建筑工程质量检验评定标准GBJ50184-93工业金属管理工程质量检验评定标准GBJ303-88建筑电气安装工程质量检验评定标准GBJ131-90自动化仪表安装工程质量评定标准GB50150-91电气装置安装工程电气设备交按试验标准GB50221-95钢结构工程质量检验评定标准GB50252-94工业安装工程质量评定标准1.4施工技术规范、标准JBJ23-96机械设备安装工程施工及验收通用规范JBJ29-96压缩机、风机、泵安装工程施工及验收规范GBJ50235-97工业管道工程施工及验收规范JBJ31-96起重设备安装工程设施工及验收规范GB50205-95钢结构工程施工及验收规范GBJ50204-94混凝土结构工程施工及验收规范GBJ50236-98现场设备、工业管道焊接工程施工及验收规范SYS407-90埋地钢管道环氧煤沥青防腐工程施工及验收规范GB50268-97给水排水管道工程施工及验收规范CJJ29-30-89建筑排水硬聚乙烯管道设计施工及验收规范GB50168-92电气安装工程,电缆线路施工及验收规范GB50169-92电气装置安装工程接地装置施工及验收规范GB50171-92电气安装工程盘柜及二次回路结线工程施工及验收规范GB2054-96电气装置安装工程低压电器施工及验收规范GB50235-97工业金属管道施工及验收规范GB50194-94建筑工程施工现场供电安全规范JGJ80-91建筑施工高处作业安全技术规范第2章 施工准备2.1 施工准备工作计划表表1-1 施工准备工作计划表序号工作内容实施人验收人实践期限1合同交底项目商务经理项目经理合同签订后1周内2图纸会审工程部、技术部项目总工程师收到正式图纸后1周内3施工组织设计与项目质量计划编制总工程师项目经理开工后1周内4施工预算编制工程部项目商务经理收到图纸后1周内5落实劳动力计划项目副经理项目经理开工后1周内6职工进厂安全教育安全工程师项目副经理工人进场1周内7平整场地,临建(含临时道路,水电管网)工程部项目副经理开工后1周内8大型机械设备进场工程部项目副经理开工后2周内9材料进场采购经理项目副经理开工后2周内10定位放线工程部总工程师开工后1周内2.2 技术准备工程开工前,项目经理及总工程师将尽快组织全体工程技术管理人员认真阅读设计文件和相关技术资料,了解设计意图,熟悉设计内容、设计要求,并据此制定工作计划和工作标准,为现场技术人员更好指导施工做好准备工作。开挖后做好复测工作,设置测站,施工中严格复测、复核制度,确保构造物位置准确。2.3 拟投入的物资及机械设备2.3.1 主要材料供应计划(1)根据施工图纸和施工进度计划,编制合理的材料需用计划表和进场时间计划。工程材料采购必须遵照公司质量体系程序文件规定,对供货方进行供货质量、能力信誉等方面的评价、选择,建立档案,项目部必须在公司确认的合格物资分包方名录中的供货单位采购供应。(2)大件批量材料采购前,应对生产产家企业性质、规模、信誉、产品质量史、供货能力、质量保证能力进行具体衡量,做出综合评价,以并择优选择。(3)有系统地搜集整理本地区材料、构件生产供应厂商、市场情况。为贯彻就近取材,合理节约代用产品,降低成本价格,积累信息资料。厂家应已获准国家质量认证,信誉、产品较好,便于大家共同认可,便于就近取材,保证质量。(4)在收到具体施工图纸后,立即组织人手编制主要材料和预制品、半成品需要量计划,根据施工部署和施工总进度计划,作为工程施工组织材料和制品加工、订货、运输、确定堆场和仓库的依据。(5)供应文件的编制必须清楚地说明订购产品的规范和设计规定和质量要求,并经主管领导批准。2.3.2 施工机械设备计划本工程需要的大型机械设备和测量设备主要有:土方挖掘机,自卸车等。土方挖掘机选用1立方挖掘机2台。土方运输机械选用自卸汽车2台。砼采用商品砼。砼场内输送采用地泵1台,必要时为保证混凝土浇筑速度考虑汽车泵作为补充。投入本标段的工程物资和施工设备数量比较少,根据施工需要进行配备,施工准备阶段,将根据施工需要从公司本部或本地租用。主要施工机械设备进场计划见附表一。计量器具进场计划见附表二。2.4 劳动力资源分配2.4.1 劳动力安排计划本工程的主要工作内容为:土方工程、砼工程、钢筋工程、模板工程、管道工程等。根据工程量及本工程的工期目标,确立各专业队伍的人员流量为:土建(含模板工、钢筋工、砼工等)20人左右;机电安装(含电工、管工、焊工、钳工、仪表工等)10人。2.4.2 施工人员组织及进场计划(1)我公司将组建一套精干、技术资质高和经验丰富的有施工经验的项目管理班子,并保证班子的所有人员均拥有岗位证书,项目经理具有相当的地埋设备施工项目管理的经验。其他主要的项目管理人员等均具有丰富的施工项目管理经验,努力使管理机构的设置知识化、专业化,满足本工程项目的各项要求。(2)在劳务队伍的选择上,挑选施工经验丰富、吃苦耐劳的优秀施工队伍,参加本工程施工,对特殊及技术工种,均保证持有统一考核颁发的操作作业证及技术等级证书。(3)进场后由项目经理部统一安排进行施工任务交底和文明安全施工教育,使施工队伍尽快投入到施工中去。(4)根据本工程既定的质量和工期目标,结合工程特点进行分解,确定各阶段目标。在各阶段中明确主导工序和重点环节,有针对性的制定相应的技术管理和施工等保证措施,落实专人跟踪管理,项目经理重点监控。劳动力计划见附表三2.5 质量工作准备(1)制定本工程的质量目标和质量计划,建立本工程的质量保证体系和质量管理体系。(2)项目经理部设专职质检工程师,各作业队设专业质检员,质检员持证上岗,并签订岗位责任制。(3)根据相关规程的质量检验评定标准,组织所有质量管理人员进行学习。 2.6 生产准备(1)进场伊始,既对施工现场进行调查,确定进入现场的水、电接入口,同时办理相关使用手续,布置场内临电、临水线路走向。(2)掌握现场地上地下障碍情况,向业主提交拆迁报告和地下障碍物的保护方案。(3)调查联系取土场和渣土消纳场,并按规定办理渣土消纳手续。2.7 材料准备(1)依据工程预算书,汇总项目内各种钢板、钢管及型钢、部件、配件、阀门等材料的总用量,并根据总进度制定出分期分批供应时间表。(2)依据招标文件的要求保证180天内提供全部设备,并采用书面形式将设备、材料的规格、型号、数量、进场日期提前提供给建设单位,到货时及时组织力量进行卸货、验收等工作。(3)项目部各专业施工员应把所需材料计划提前一周通知公司材料设备科。(4)所有使用的材料和设备必须符合图纸设计和建设单位认定的品牌要求。(5)项目经理部积极组织调配好施工机械及周转料具,保证材料型号符合、数量准确、性能优良、进场时间明确,充分满足各工序对施工机械的需求,并在施工中做好保养工作,保证机械性能的完好率和使用率,贮备相应的配件,做到万无一失,确保工程顺利进行,把不利于工程进度的因素减少到最低程度。2.8 技术准备(1)在接到中标通知书后,我们将与设计部门联系,组织有关施工员进一步了解设计意图,认真审查施工图纸及有关资料,及时准确地做出施工预算,预算人员根据设计预算和施工预算做出两算对比。(2)对工程的重要部位组织编制分项工程方案和工艺卡,做好充分的技术准备工作。(3)根据施工进度编制材料进场计划,提前做好半成品的加工定货工作,完备有关技术资料。(4)培训施工人员掌握新技术、新工艺,考核合格后方可上岗。(5)在施工实践中,施工员应随着设计和施工条件等因素的变化调整和补充完善施工方案,并制定相应的检查制度。施工方案的重大调整和修改,应经有关单位、人员审批。(6)施工前首先认真审核施工图,解决错、漏、碰、缺和各专业矛盾问题。并由工程项目技术负责人,将各专业、各工种的管线,采取单线划在一张平面图上,每种管道用彩色笔,在各交点处,末端设备安装点,综合其标高、位置、发现有矛盾之处,及时将问题解决在安装之前,避免打架和安装错位问题。第3章 施工技术方案3.1 施工测量3.1.1施工测量准备(1)测量仪器本工程应用的全站仪、经纬仪、水平仪等须经政府主管部门批准的计量检测单位校核,并确保使用时在有效检测周期内。(2)复核水平点及坐标点对业主提供的坐标桩及水平点进行复测,确定水平点和坐标的准确性。放线采用轴线交会法和极坐标两种,放样出主轴线的位置。(3)绘制场内高程方格网在进场后根据业主提供的坐标桩及水平点,对施工场区内按55m设置方格网,并进行各网点的高程测量,绘制成图。3.1.2施工测量平面控制网的测设首先根据施工总平面图建立的矩形控制网,利用仪器将控制桩引测到各单位工程周围的地面上,并对控制桩加以保护以防破坏。控制点引测:根据标准高程点在场区内引测不少于8个控制点,要求埋深0.6米,用混凝土浇筑并以钢柱标记,并测定高程作为工程定位放线的依据。控制网布设:依据场内导线控制点,沿距建筑物开挖线约1米远位置测设各轴线方向控制基准点,将主控轴线外引埋设基准点,并浇筑砼稳固。同时,对可能受施工影响的所有房屋和构筑物进行控制测量,设置定位标记和参照点。3.1.3高程测量和垂直度控制 (1)根据业主提供的水平点,利用水平仪,塔尺、钢尺(均经鉴定合格)传递至底板。(2)本工程按外控法埋设轴线控制桩及加密控制桩。轴线要使用经纬仪引测,并往返测量与基准点校核,误差要控制在规范控制范围内,轴线控制桩应布置在不易被破坏的地点。(3)对场内设水平点,每间隔一定时间须观测一次,以做相互检校。对检测后的数据成果须作逐一分析,以保证水平点使用的准确性。(4)误差要求 根据中华人民共和国国家标准工程测量规范GB50026-2007的要求轴线竖向投测及标高竖向传递的允许误差:轴线位移3mm,柱垂直度允许偏差3mm。标高测量允许偏差3mm。 (5)放线程序3.2 土方工程定位放线确定基础开挖尺寸后进行土方开挖。土方采用机械整体开挖,自卸式装卸车运输弃置于建设单位指定的堆场。3.2.1质量要求各层间标高允许偏差150mm。边坡允许偏差200mm,严禁亏坡。土方开挖开始时,先由建设方提供的放线控制桩位引线,并按基础外轮廓尺寸、基坑宽度施工以后,挖至距基底300mm处,剩余土方采用人工清理;机械挖土槽底标高与设计标高允许偏差200mm,不得扰动老土。槽底可预留300mm土层,机械挖土到设计槽底以上300mm,在挖该步土时,需由测量员配合进行。3.2.2雨季施工措施进行基坑开挖前,首要工作是进行全场排水,并在基坑边临时清挖排水沟,集中排向一个积水坑,用潜水泵抽出基坑。在做好基坑排水工作的同时,也做好施工场地的排水工作;采取的措施是根据现场情况,在低洼处设积水坑,将各方向排入积水坑的污水用潜水泵抽去,污水的排放将根据业主方与有关单位协商后提供的排放点进行排放。3.2.3土方回填(1)作业条件:回填前,应对基础进行检查验收,并要办好隐检手续。其基础砼强度应达到规定要求,方可进行回填。施工前,应抄平做好水平标志,室内和散水的边墙上弹水平线或在地墙上钉上标高控制木桩。(2)操作工艺工艺流程:基坑底清理检验土质分层铺土、耙平夯打密实找平验收。填土前应将基坑底的垃圾杂物等清理干净。压实过程中,现场土的含水量应在最佳含水量的3%的范围内。填方或回填料都应分层按均匀厚度填入,每层厚度不超过300mm,填方和回填应使用必要的压实方法和压实机械进行压实,以达到规定的压实度。基坑回填应在相对两侧或四周同时进行。基础墙两侧标高不可相差太多,以免把墙挤歪时,较长的管沟墙,应采用内部支撑的措施。(3)质量标准基底处理、回填的土料必须符合设计要求或施工规范的规定。每层压实完成后均要进行检验,检验方法应符合JGJ79-2002、GB/T50123-1999或其它等同规范的要求。(4)成品保护施工时应注意保护定位桩、轴线桩、标高桩、防止碰撞位移。夜间施工时应合理安排施工顺序,设有足够的照明设施,防止铺填超厚,严禁汽车直接倒土入槽。基础或管沟的现浇砼应达到一定强度,不致因填土而受损坏时方可回填。3.2.4 土方工程质量保证措施表2-1 土方工程质量保证措施相关部门措施执行人技 术制定合理方案,在施工中监督执行。项目技术负责人施 工监督施工,安排好各工序之间的协调。施工员班 组认真执行交底,发现问题及时向施工员反映。全体操作测 量密切配合测量员质 检严肃执行规定、规程、作好隐预检质检员3.3 模板工程模板及其支撑系统满足以下要求: (1)保证结构、构件各部分形状尺寸和相互间位置

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论