
全文预览已结束
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
BUS TERMINAL REFER TO 2A/P.A.40.07 FOR UNFOLDED ELEVATION ST-1 7 P.A52.34 2 P.A52.73 ST-1 ST-1 (3) CONCEALED HEAT EXHAUST FLUES; IN PLANTER, BEHIND ROOF EDGE BEYONND (DASHED) SEISMIC JOINT (DASHED) GL-10 GL-10 T.O.W. = 4.53 M E.L. = 2.93 M T.O.W. = 4.53 M T.O.W. = 1.60 M E.L. = -1.27 M E.L. = -1.37 T.O.W. = 1.60 M P.A51.36 1 P.A51.34 2 CATV & TELECOM. RM. EASTERN CONNECTOR ROAD BUS TERMINAL ENTRY MALL ENTRYVESTIBULE PC-3.4-C PC-4.2-A PC-5.1-A PC-4.1-B PC-2.1-E PC-4.2-B PC-5.1-A PC-3.2-B PC-2.1-B MP-13A PC-3.2-B PC-2.1-B PC-3.1-D PC-2.1-B PC-1.1-A PC-4.2-A PC-5.1-A PC-3.1-A PC-2.1-E PC-4.2-B WT-20 MP-13A HR-1 BUS TERMINAL ENTRY / EXIT REFER TO 1B/P.A40.07 FOR UNFOLDED ELEVATION REFER TO 1A/P.A.40.07 FOR UNFOLDED ELEVATION REFER TO 2A/P.A.40.07 FOR UNFOLDED ELEVATION PC-5.1-A ST-1 STATIC SIGN INTERNALLY ILLUMINATED (10 X 9.75 M) ST-1 10000 9745 ROOF EDGE BEYOND (DASHED) 100007950 L-2 T.O.W. = 1.60 M E.L. = -1.27 M E.L. = -1.37 M T.O.W. = 1.60 MT.O.W. = 1.60 M E.L. = -0.65 M E.L. = 0.03 M E.L. = 0.21 M T.O.W. = 1.60 M MP-4MP-4 MP-4 MP-4 PC-4.2-A PC-3.2-A PC-2.1-A PC-1.1-A PC-3.2-A PC-2.1-A PC-1.1-A PC-5.1-A PC-3.2-A PC-2.1-A PC-5.1-A ST-1 PC-4.2-A PC-3.2-B PC-2.1-B PC-1.1-A PC-5.1-A PC-3.4-C PC-2.1-E GR-2A L-1 L-1 L-1 WT-22CWT-2AWT-2A WT-3 WT-3 WT-3WT-3 WT-8B PC-2.1-A PC-2.1-B PC-2.1-B PC-2.1-E PC-3.4-C PC-2.1-EPC-2.1-E PC-3.2-A PC-3.4-C PC-1.1-D PC-2.1-E ROOF EDGE BEYOND (DASHED) E.L. = 0.03 ME.L. = 0.21 M L-2 PC-4.1-B PC-5.1-A PC-2.1-A PC-1.1-A PC-3.2-A ST-1 GR-2A PC-5.1-A ST-1 PC-5.1-A PC-4.1-B PC-4.1-B REFER TO 1A/P.A.40.07 FOR UNFOLDED ELEVATION WT-8B L-2 ST-1 ST-1 ROOF EDGE BEYOND (DASHED) T.O.W. = 1.60 M E.L. = -0.65 M E.L. = 0.03 M PC-4.2-A PC-5.1-A PC-2.1-A PC-1.1-A PC-3.2-A ST-1 L-1 PC-2.1-A PC-1.1-A PC-3.2-A PC-3.2-A PC-1.1-A PC-2.1-AL-1 PC-5.1-A REFER TO 1B/P.A40.07 FOR UNFOLDED ELEVATION WT-3WT-3 WT-3WT-3 WT-3 WT-2AWT-2AWT-2A WT-8B ROOF EDGE BEYOND (DASHED) T.O.W. = 1.60 M E.L. = -1.27 M E.L. = -1.37 M T.O.W. = 1.60 M GENERATOR BOILER/CHILLER FA LOUVRE (20msq) AT B1 L-1 PC-4.2-A PC-5.1-A PC-2.1-B PC-3.2-B PC-1.1-A PC-2.1-B PC-3.2-B PC-1.1-A ST-1 ST-1 PC-5.1-A PC-1.1-A PC-3.2-B PC-3.2-B PC-2.1-B PC-2.1-B CRT TRACK LEVEL E.L.-11.82m LEVEL S5 E.L.-26.2m LEVEL S4 E.L.-20.2m LEVEL S3 E.L.-14.7m LEVEL S2 E.L.-9.2m LEVEL S1 E.L.-3.2m LEVEL S6 E.L.-32.9m T.O. BANDING, E.L. -30.2m T.O. BANDING, E.L. -28.2m T.O. BANDING, E.L. -26.2m T.O. BANDING, E.L. -24.2m T.O. BANDING, E.L. -22.2m T.O. BANDING, E.L. -20.2m T.O. BANDING, E.L. -18.2m T.O. BANDING, E.L. -16.2m T.O. BANDING, E.L. -14.2m T.O. BANDING, E.L. -12.2m T.O. BANDING, E.L. -10.2m T.O. BANDING, E.L. -8.2m T.O. BANDING, E.L. -6.2m T.O. BANDING, E.L. -4.2m T.O. BANDING, E.L. -2.2m T.O. BANDING, E.L. -.2m T.O. BANDING, E.L. 1.8m T.O. BANDING, E.L. 3.8m T.O. BANDING, E.L. 5.8m T.O. BANDING, E.L. 7.8m T.O. BANDING, E.L. -32.2m RE-10RE-9RE-8RE-7RE-6RE-5RE-4RE-3RE-2RE-1 P.A51.35 1 P.A51.35 2 RE-10RE-12RE-14E-3E-4E-1 E-2 RE-11RE-13 E-3 TS-4 E-1 TS-2 E-3E-4E-5 E-2 R-1 L-1AL-1AL-1AL-1AL-1A GL-10 BUILDING FACADE OUTLINE BUILDING FACADE OUTLINE REFER TO ELEVATION 2 AND 4 ON SHEET P.A40.07 FOR FACADE LAYOUT GL-10GL-10GL-10GL-10 MP-4MP-4MP-4MP-4MP-4MP-4 WT-27 WT-27 WT-27 WT-27 WT-27 WT-3WT-3WT-3WT-3WT-3 MP-4 LEVEL S5 E.L.-26.2m LEVEL S4 E.L.-20.2m LEVEL B1 E.L.-38.9m LEVEL S6 E.L.-32.9m T.O. BANDING, E.L. -30.2m T.O. BANDING, E.L. -28.2m T.O. BANDING, E.L. -26.2m T.O. BANDING, E.L. -24.2m T.O. BANDING, E.L. -22.2m T.O. BANDING, E.L. -20.2m T.O. BANDING, E.L. -18.2m RE-9RE-8RE-7RE-6RE-5RE-4RE-3RE-2RE-1 CRT TRACK LEVEL E.L.-11.82m LEVEL S5 E.L.-26.2m LEVEL S4 E.L.-20.2m LEVEL S3 E.L.-14.7m LEVEL S2 E.L.-9.2m LEVEL S1 E.L.-3.2m LEVEL B1 E.L.-38.9m LEVEL S6 E.L.-32.9m T.O. BANDING, E.L. -30.2m T.O. BANDING, E.L. -28.2m T.O. BANDING, E.L. -26.2m T.O. BANDING, E.L. -24.2m T.O. BANDING, E.L. -22.2m T.O. BANDING, E.L. -20.2m T.O. BANDING, E.L. -18.2m T.O. BANDING, E.L. -16.2m T.O. BANDING, E.L. -14.2m T.O. BANDING, E.L. -12.2m T.O. BANDING, E.L. -10.2m T.O. BANDING, E.L. -8.2m T.O. BANDING, E.L. -6.2m T.O. BANDING, E.L. -4.2m T.O. BANDING, E.L. -2.2m T.O. BANDING, E.L. -.2m T.O. BANDING, E.L. 1.8m T.O. BANDING, E.L. 3.8m T.O. BANDING, E.L. 5.8m T.O. BANDING, E.L. 7.8m T.O. BANDING, E.L. -32.2m RE-9RE-8RE-7RE-6RE-5RE-4RE-3RE-2RE-1 LEVEL S5 E.L.-26.2m LEVEL S4 E.L.-20.2m E.L.-14.7m LEVEL B1 E.L.-38.9m LEVEL S6 E.L.-32.9m T.O. BANDING, E.L. -30.2m T.O. BANDING, E.L. -28.2m T.O. BANDING, E.L. -26.2m T.O. BANDING, E.L. -24.2m T.O. BANDING, E.L. -22.2m T.O. BANDING, E.L. -20.2m T.O. BANDING, E.L. -18.2m T.O. BANDING, E.L. -16.2m MP-4 MP-4 MP-4 MP-4 MP-4 GL-10 GL-10 GL-10 GL-10 ST-1 ST-1 PC-3.4-C ST-1 ST-1 PC-5.1-A MP-4 MP-4 PC-2.1-E WT-8G MP-4 HR-1 P-S5-438 P-S5-443 P-S5-444 P-S5-445 P-S5-446 P-S5-447 P-S5-448 RE-9 LEVEL S5 E.L.-26.2m MP-4 MP-4 MP-4 4045 SCREENED AREA FOR CINEMA EASTERN CONNECTOR ROAD CINEMA 6 P.A52.34 B.O. HEADER E.L. -16.072 M T.O. COPING E.L. -8.2 M AREAWAY B.O. HEADER E.L. -13.037 M CIN CINEMA R-1 PC-3.1-A PC-2.1-E PC-5.1-A PC-4.2-B CRT TRACK LEVEL E.L.-11.82m LEVEL S5 E.L.-26.2m LEVEL S4 E.L.-20.2m LEVEL S3 E.L.-14.7m LEVEL S2 E.L.-9.2m LEVEL S1 E.L.-3.2m LEVEL S6 E.L.-32.9m RE-8RE-7RE-6RE-5RE-4RE-3RE-2RE-1 MP-4 MP-4 MP-4 MP-4 MP-4 GL-10 GL-10 GL-10 GL-10 ST-1 ST-1 PC-3.4-C ST-1 ST-1 R-1 L-1 PC-5.1-A MP-4 MP-4 PC-2.1-E WT-8G MP-4 HR-1 CRT TRACK LEVEL E.L.-11.82m LEVEL S5 E.L.-26.2m LEVEL S4 E.L.-20.2m LEVEL S3 E.L.-14.7m LEVEL S2 E.L.-9.2m LEVEL S1 E.L.-3.2m LEVEL S6 E.L.-32.9m T.O. BANDING, E.L. -30.2m T.O. BANDING, E.L. -28.2m T.O. BANDING, E.L. -26.2m T.O. BANDING, E.L. -24.2m T.O. BANDING, E.L. -22.2m T.O. BANDING, E.L. -20.2m T.O. BANDING, E.L. -18.2m T.O. BANDING, E.L. -16.2m T.O. BANDING, E.L. -14.2m T.O. BANDING, E.L. -12.2m T.O. BANDING, E.L. -10.2m T.O. BANDING, E.L. -8.2m T.O. BANDING, E.L. -6.2m T.O. BANDING, E.L. -4.2m T.O. BANDING, E.L. -2.2m T.O. BANDING, E.L. -.2m T.O. BANDING, E.L. 1.8m T.O. BANDING, E.L. 3.8m T.O. BANDING, E.L. 5.8m T.O. BANDING, E.L. 7.8m T.O. BANDING, E.L. 9.8m T.O. BANDING, E.L. -32.2m DESIGN ARCHITECT SAFDIE ARCHITECTS, LLC. 100 PROPERZI WAY SOMERVILLE, MA 02143-3740 USA EXECUTIVE ARCHITECT P&T GROUP INTERNATIONA LTD 31/F, TOWER B, CITY CENTER OF SHANGHAI NO. 100 ZUN YI ROAD, SHANGHAI, CHINA ZIP CODE: 200051 STRUCTURAL ENGINEER ARUP INTERNATIONAL CONSULTANTS (SHANGHAI) CO., LTD 39/F-41/F, HUAI HAI PLAZA 1045 HUAI HAI ROAD (M), XUHUI DISTRICT SHANGHAI, CHINA ZIP CODE: 200031 MEP ENGINEER PARSONS BRINCKERHOFF (ASIA) LTD 7/F, ONE KOWLOON 1 WANG YUEN STREET KOWLOON BAY, HONG KONG LOCAL DESIGN INSTITUTE CHONGQING ARCHITECTURAL DESIGN INSTITUTE P.R.CHINA NO. 31 RENHE ROAD, YUZHONG DISTRICT, CHONGQING, CHINA ZIP CODE: 400015 CLIENT CHONGQING CAPITALAND GU YU XIONG GUAN REAL ESTATE CO., LTD. SUITE 3508 35 FLOOR YINGLI INTERNATIONAL FINANCE CENTER NO. 28 MINQUAN ROAD, YUZHONG DISTRICT, CHONGQING, CHINA ZIP CODE: 400012 RETAIL DESIGN CONSULTANT THE
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 电池厂废料处理流程管理规定
- 松原事业单位笔试真题2025
- 2025年度产品购销合同(设备与信息技术)
- 油墨厂原料库防静电接地制度
- 2025民事诉讼授权合同
- 第18课《天下第一楼(节选)》说课稿2023-2024学年统编版语文九年级下册
- 探索手工空竹的制作 教案-2023-2024学年高一上学期劳动技术
- 中医师考he试题及答案
- 2025秋季云南普洱市景东彝族自治县教育体育局学期基础教育银龄教师招募7人笔试备考试题及答案解析
- 代理公司注销及后续事务处理协议
- 民警培训安全驾驶简报课件
- 十年(2016-2025)高考生物真题分类汇编(全国通.用)专题10 基因的自由组合定律(解析版)
- 2025年大数据应用工程师认证考试预测题详解与实战指南手册
- 2025年山东省潍坊市中考数学试卷附答案
- 俄罗斯礼俗课件
- (2025秋新版)人教版九年级物理上册全册教案
- 2024统编版八年级历史上册全册知识点复习提纲
- T-CES 153-2022 电力巡检无人机边缘智能终端技术规范
- 《中国金融学》课件 第4章 信用形式与信用体系-课件
- 新版2026统编版小学道德与法治三年级上册 第6课《争做未来科学家》第2课时 做个小小科学家 教学课件
- 康复医生进修汇报课件
评论
0/150
提交评论