


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Unit 3 Back to the past Project Creating an illustrated time chartPart AStep I ReadingRead the article and try to get the main idea of each paragraph:Paragraph 1 Main events in Rome and China between 753 BC and 479 BC.Paragraph 2 Similarities between China and Rome during the Han Dynasty.Paragraph 3 Both Rome and China influenced areas between 212 BC and 100 BC.Paragraph 4 Rome and China had a difficult time in the following hundred years.Read the article again and answer the following questions:1. When did Rome become a republic and what happened in China then?2. When was China united and by whom?3.3. Which city did Han Dynasty have as its capital? Where is it now?4. What did China and Rome have in common during the Han Dynasty?5. When was Silk Road was in use? And what was it used for?6.6.When did the trade between China and Rome begin? What goods were traded?7. When did Han Dynasty fall and what did it result in?8.8.When was Roman Empire ended? Was it the same story for China?Step 2 Time chartRead the time chart carefully and answer the following questions:1. What happened in both China and Rome in the year 509 BC?2. What about the year 27 BC?3.3. When was Confucius born?4. How long did the Han Dynasty last?Conclusion:What is a time chart?A time chart should be a chart marked with time periods and important events that take place in certain time periods.Part B Creating an illustrated time chartSteps for creating an illustrated time chartPlanningWork in small groups and do the following:1. Discuss and research time periods in history you are interested in.2.2. Choose one as the time period you will illustrate in your time chart.3. Discuss the tasks for each member.Research _Write the outline _Illustrate the time chart _Present the time chart _Preparing 1. Find information from various sources on the time period.2. Sort the information by date.3. Discuss the information and decide what to include in the time chart and what to leave out.4. Write an outline, paying attention to the time period and its significance.Producing5. Design the time chart based on the outline.6. Proofread it and add new
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 制药生产设备管理制度
- 小学餐饮浪费管理制度
- DB3410T 51-2025 工程建设项目全流程一码管地技术规范
- 别墅转让方案(3篇)
- 消防窗户整改方案(3篇)
- 消防孙峰课件
- 厂区立柱保护方案(3篇)
- 村庄彩绘方案(3篇)
- 小学课程规划方案(3篇)
- 采石场承包合同矿产资源保护与综合利用协议
- 《低段培智学生行为习惯养成教育的研究》小课题研究中期报告
- TC4钛合金拉拔工艺探索
- 八年级数学上册《平方差公式》的教学反思(优秀3篇)
- 填石路堤沉降差检测记录表
- “乡村振兴”战略应知应会试题及答案(分享)
- 衢州万达暖通工程施工方案(最终版)
- 学校端午假期致学生家长一封信
- 遗传自制习题答案个我
- 链轮齿数尺寸对照表三
- 植物生理学第九章光形态建成.ppt
- (完整版)施工占道施工方案
评论
0/150
提交评论