




已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
MODERN AIDS IN THE DESIGN OF RAILWAY BOGIESBy A. W. Manser, B.Sc. (Eng.) (Member)The paper illustrates work carried out on motored and non-motored underground train bogies and the experiments carried out in the use of light-alloy bogies and vehicles.INTRODUCTIONSMALL though the London underground system may appear in comparison with main line railways, the intensity of the service run and the physical characteristics of the system impose exceptionally severe conditions on many of the rolling stock components. This is particularly true of the bogies, where the high rate of acceleration and braking, frequent incidence of stopping, severity and number of curves, together with the unusually high load/tare ratio, combine to produce as exacting a problem as may be found in the railway world, apart from the further almost unique disadvantage-in the case of the Tube lines, where the tunnel diameter is only about 12 ft-of a critical space limitation.Of the two types of bogie, motored and non-motored, the former obviously presents by far the more difficult problem in design, and with the continuing trend toward higher rates of acceleration, the motored bogie has become the more numerous. This paper, therefore, deals primarily with the motored bogie, although many of the conclusions apply also to the non-motored bogie.HISTORY OF BOGIE EXPERIENCEThe history of bogie experience on the London Transport system may be summarized by saying that, until recent times, only those bogies of exceptionally robust (and therefore heavy) construction had a record reasonably free from trouble in respect of main structural defects. Even in some of the heavier designs, freedom from structural troubles was achieved only after extensive and costly modification of what had started as basically a main line design of proven reliability.On a system where, by reason of station spacing, quite apart from signal checks, the requirement is to stop every two-thirds of a mile on average, there can be hardly anything more wasteful than to be pushing around unnecessary mass. It is obvious that, with the high present-day costs of energy and materials, such as tyres and brake blocks, and rates of interest and depreciation, the capitalized value of weight of rolling stock on an urban service is no mean consideration.With this in mind, it has been the aim of designers for many years to reduce weight, and it is principally from this consideration that the production of light alloy vehicles for the London Transport service has stemmed.Many of the earlier attempts at weight reduction of the bogies cannot be regarded as an unqualified success, as structural cracks developed in the course of time at many points.With the growth of welding technique between 1930 and 1939, opportunity was seen to achieve a major step forward in reduction of weight by adopting an all-welded design of tube-stock motor bogie (Fig. 1) incorporating some radical departures from former practice. Experience with this design was unhappy, as frame cracks appeared in a number of positions after relatively few years in service. Fig. 2 shows the positions at which cracks were, in the course of time, found to initiate. From the easy position of being wise after the event, it is now clear that the troubles resulted from a combination of the following disadvantageous conditions :(1)The design left something to be desired in that it was more like one of riveted construction, with the riveted knees and brackets omitted, and the main members welded together at their points of abutment.(2) The welding technique applied was inferior by present-day standards.(3) The structure was not stress-relieved after fabrication.(4) The design was of inadequate strength having regard to the necessity to withstand certain forces that arise in service, the severity of which had not been appreciated.Although much could be said on the subject of the first three points mentioned above, it is with the fourth point that the author wishes to deal in this paper, because the experience in carrying out investigations into the stressing of bogie frames in service shows how extremely valuable can be the contribution to design considerations that can be made by strain gauge measurements taken under service conditions.ATTEMPT TO USE THE TECHNIQUE OF RUBBER MODELSA technique has been developed in recent years in which rubber models are used to study the type of deformation produced by a system of forces which are known as to their direction of operation. This technique has been described in a recent paper presented at Nottingham University*. This technique seemed so admirable in revealing the manner of deformation under load and, in consequence, the most promising means of reinforcing the structure, that an attempt has been made to apply the technique to bogie frame design. Unfortunately, it is found that, for a structure of this type, a material which is sufficiently flexible to deform to an obvious extent under additional lateral loading, sags under normal gravity loading to an excessive degree.An alternative method of applying the same technique is being tried out by making the structure out of thin spring steel, strong enough to withstand vertical loading without deformation but readily deflected in a horizontal plane.Experiments with models made in this way have not yet been progressed to any real conclusion, but Fig. 10 shows a model of this type entering a curve. The points of flexure in the frame are remarkably coincident with the areas in which bogie frame fractures are commonly known to develop. The severity of loading produced by running into curves is of particular importance in the case of the London Transport system, where the original system, constructed for the most part during the first decade of the century, may quite aptly be described as a few short lengths of straight track joined together by a number of curves.Furthermore, it should be noted that these old tunnels were driven without transitions between straight and curved portions, so that not only is the lateral acceleration suddenly applied but the civil engineer has no opportunity to apply the correct cant at the beginning of the curve by reason of the limited rate at which the cant may be applied. The system may, therefore, be regarded as an endurance test track for bogies and it is not greatly surprising that, in endeavouring to lighten construction, much trouble has been encountered in the past.Some confidence can, however, now be felt that, with these modern aids to design, progress to lighter construction can be made with material used to good effect where it is required, in the knowledge that it is being sensibly loaded but not overloaded.现代辅助设备在转向架设计方面的应用MODERN AIDS IN THE DESIGN OF RAILWAY BOGIES现代辅助设备在转向架设计方面的应用By A. W. Manser, B.Sc. (Eng.) (Member)本文对地铁动车和拖车转向架进行了说明并使用轻合金转向架和车辆进行了实验。引言虽然伦敦地铁系统与主线铁路相比可能规模比较小,但是许多机车车辆零部件的强度和系统的物理特性都有极高的要求。特别是对转向架而言,其中,高速运行时的加速和制动,频繁的停车,曲线的数量和弯曲程度,与不寻常的高负载/皮重比一起,结合而产生了一个在世界铁路范围内同样存在的问题,在隧道直径只有约12英尺的临界空间限制的情况下,限界过小几乎是唯一的缺点。这两种动车和拖车转向架,迄今为止前者在设计上明显是更有挑战性的问题,并呈现出以较高比率持续发展的趋势,动车转向架已经成为研究的焦点。因此,虽然这篇论文许多结论也适用于拖车转向架,但主要涉及的还是动车转向架。转向架的历史伦敦交通运输系统转向架的历史经验可以总结为:直到近期,只有那些结构稳定 (重型)的转向架在就结构缺陷情况下有适当摆脱困境的记录,即便是在重量的设计上,结构问题自由度的获取也是经过大量的修正才开始主要线路设计的基本可靠性验证。在一个系统中,由于站间距的原因,去除信号检查,要求平均每英里的三分之二是停止,更多的浪费是要推动周围不必要的质量。很明显,随着目前能源和原材料成本的提高,如轮胎和制动块,价钱和折旧率,车辆重量的资本化价值城市运行中并不会考虑。考虑到这一点,轻量化一直是设计者多年的目,并且出于这样的考虑所生产的轻合金车辆已经是伦敦运输服务的主力军。许多早期的尝试轻量化的转向架不能被视为绝对的成功,因为结构裂缝发生在许多位置。1930年和1939年之间的焊接技术的发展,采用全焊接设计管材动车转向架结合径向横距的实践被视为是实现轻量化的重要一步。但是这种设计经验是不幸的,因为相对服务几年后框架裂缝出现在多个位置。图2显示了裂纹的位置,随着时间的推移,慢慢的被发现。从作为事后自作聪明
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025中农科(山东)玫瑰生物科技有限责任公司招聘11人笔试参考题库附带答案详解
- 绵阳职业技术学院《计算机组成原理与系统结构(实验)》2023-2024学年第二学期期末试卷
- 首都师范大学科德学院《中国造园美学与实践》2023-2024学年第二学期期末试卷
- 湖州学院《财务管理》2023-2024学年第二学期期末试卷
- 内蒙古经贸外语职业学院《金融建模与量化分析》2023-2024学年第二学期期末试卷
- 广西水利电力职业技术学院《科学实验教学设计及创意科学教具》2023-2024学年第二学期期末试卷
- 贵州民用航空职业学院《高层建筑施工》2023-2024学年第二学期期末试卷
- 南京工业职业技术大学《教育教学知识》2023-2024学年第二学期期末试卷
- 黔南民族职业技术学院《人机交互设计》2023-2024学年第二学期期末试卷
- 云南经济管理学院《人工智能与商业创新》2023-2024学年第二学期期末试卷
- 中华人民共和国保守国家秘密法实施条例
- 众安在线财产保险股份有限公司个人孕产医疗保险(互联网2023版A款)费率表
- 燃气公司绩效考核管理制度
- 锂电池起火冒烟爆炸培训
- 预防性侵害安全教育
- 第八届全国医药行业特有职业技能竞赛(中药调剂员)考试题库(含答案)
- 人工血管动静脉内瘘术后护理
- 《夺取抗日战争和人民解放战争的胜利》第2课时课件
- 因赌博纠纷协议书范本范文
- 【关于xx家具公司营销策略的调查报告(定量论文)5800字】
- 02S515排水检查井图集
评论
0/150
提交评论