已阅读5页,还剩92页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CONTENTS 1 GENERAL PROVISIONS.1 1.1 DEFINITIONS.1 1.2 INTERPRETATION.6 1.3 COMMUNICATIONS.6 1.4 LAW AND LANGUAGE.7 1.5 PRIORITY OF DOCUMENTS.7 1.6 CONTRACT AGREEMENT.8 1.7 ASSIGNMENT.8 1.8 CARE AND SUPPLY OF DOCUMENTS.8 1.9 CONFIDENTIALITY.8 1.10 EMPLOYERS USE OF CONTRACTORS DOCUMENTS.9 1.11 CONTRACTORS USE OF EMPLOYERS DOCUMENTS.9 1.12 CONFIDENTIAL DETAILS.10 1.13 COMPLIANCE WITH LAWS.10 1.14 JOINT AND SEVERAL LIABILITY.10 2 THE EMPLOYER .11 2.1 RIGHT OF ACCESS TO THE SITE.11 2.2 PERMITS, LICENCES OR APPROVES.11 2.3 EMPLOYERS PERSONNEL.12 2.4 EMPLOYERS FINANCIAL ARRANGEMENTS.12 2.5 EMPLOYERS CLAIMS.12 3 THE EMPLOYERS ADMINISTRATION.13 3.1 THE EMPLOYERS REPRESENTATIVE.13 3.2 THE EMPLOYERS PERSONNEL.14 3.3 DELEGATED PERSONS.14 3.4 INSTRUCTIONS.15 3.5 DETERMINATIONS.15 4 THE CONTRACTOR.15 4.1 THE CONTRACTORS GENERAL OBLIGATIONS.15 4.2 PERFORMANCE SECURITY.16 4.3 CONTRACTORS REPRESENTATIVE.17 4.4SUBCONTRACTORS.18 4.5 NOMINATED SUBCONTRACTORS.18 4.6 CO-OPERATION.19 4.7 SETTING OUT.19 4.8 SAFETY PROCEDURES.20 4.9 QUALITY ASSURANCE.20 4.10 SITE DATA.20 4.11 SUFFCIENCY OF THE CONTRACT PRICE.21 4.12 UNFORESEEABLE DIFFICULTIES.21 4.13 RIGHTS OF WAY AND FACILITIES.21 4.14 AVOIDANCE OF INTERFERENCE.21 4.15 ACCESS ROUTE.22 4.16 TRANSPORT OF GOODS.22 4.17 CONTRACTORS EQUIPMENT.23 4.18 PROTECTION OF THE ENVIRONMENT.23 4.19 ELECTRICITY, WATER AND GAS.23 4.20 EMPLOYERS EQUIPMENT AND FREE-ISSUE MATERIAL.24 4.21 PROGRESS REPORTS.24 4.22 SECURITY OF THE SITE.26 4.23 CONTRACTORS OPERATIONS ON SITE.26 4.24 FOSSILS.26 5 DESIGN.27 5.1 GENERAL DESIGN OBLIGATIONS.27 5.2 CONTRACTORS DOCUMENTS.28 5.3 CONTRACTORS UNDERTAKING.29 5.4 TECHNICAL STANDARDS AND REGULATIONS.29 5.5 TRAINING.30 5.6 AS-BUILT DOCUMENTS.30 5.7 OPERATION AND MAINTENANCE MANUALS.31 5.8 DESIGN ERROR.31 6 STAFF AND LABOUR.31 6.1 ENGAGEMENT OF STAFF AND LABOUR.31 6.2 RATES OF WAGES AND CONDITIONS OF LABOUR.31 6.3 PERSONS IN THE SERVICE OF EMPLOYER.32 6.4 LABOUR LAWS.32 6.5 WORKING HOURS.32 6.6 FACILITIES FOR STAFF AND LABOUR.32 6.7 HEALTH AND SAFETY.32 6.8CONTRACTORS SUPERINTENDENCE.33 6.9CONTRACTORS PERSONNEL.33 6.10 RECORDS OF CONTRACTORS PERSONNEL AND EQUIPMENT.34 6.11 DISORDERLY CONDUCT.34 7 PLANT, MATERIALS AND WORKMANSHIP.34 7.1 MANNER OF EXECUTION.34 7.2 SAMPLES.34 7.3 INSPECTION.35 7.4 TESTING.35 7.5 REJECTION.36 7.6 REMEDIAL WORK.37 7.7 OWNERSHIP OF PLANT AND MATERIALS.37 7.8 ROYALTIES.38 8 COMMENCEMENT, DELAYS AND SUSPENSION .38 8.1 COMMENCEMENT OF WORKS.38 8.2 TIME FOR COMPLETION.38 8.3 PROGRAMME.38 8.4 EXTENSION OF TIME FOR COMPLETION.39 8.5 DELAYS CAUSED BY AUTHORITIES.40 8.6 RATE OF PROGRESS.40 8.7 DELAY DAMAGES.41 8.8 SUSPENSION OF WORK.41 8.9 CONSEQUENCES OF SUSPENSION.42 8.10 PAYMENT FOR PLANT AND MATERIALS IN EVENT OF SUSPENSION.42 8.11 PROLONGED SUSPENSION.43 8.12 RESUMPTION OF WORK.43 9 TESTS ON COMPLETION.43 9.1 CONTRACTORS OBLIGATIONS.43 9.2 DELAYED TESTS.44 9.3 RETESTING.45 9.4 FAILURE TO PASS TESTS ON COMPLETION.45 10 EMPLOYERS TAKING OVER.45 10.1 TAKING OVER OF THE WORKS AND SECTIONS.45 10.2 TAKING OVER OF PARTS OF THE WORKS.46 10.3 INTERFERENCE WITH TESTS ON COMPLETION.46 11 DEFECTS LIABILITY.47 11.1 COMPLETION OF OUTSTANDING WORK AND REMEDYING DEFECTS.47 11.2 COST OF REMEDYING DEFECTS.48 11.3 EXTENSION OF DEFECTS NOTIFICATION PERIOD.48 11.4 FAILURE TO REMEDY DEFECTS.48 11.5 REMOVAL OF DEFECTIVE WORK.49 11.6 FURTHER TESTS.49 11.7 RIGHT OF ACCESS.50 11.8 CONTRACTOR TO SEARCH.50 11.9 PERFORMANCE CERTIFICATE.50 11.10 UNFULFILLED OBLIGATIONS.51 11.11 CLEARANCE OF SITE.51 12 TESTS AFTER COMPLETION.51 12.1 PROCEDURE FOR TESTS AFTER COMPLETION.51 12.2 DELAYED TESTS.52 12.3 RETESTING.52 12.4 FAILURE TO PASS TESTS AFTER COMPLETION.53 13 VARIATIONS AND ADJUSTMENTS.54 13.1 RIGHT TO VARY.54 13.2 VALUE ENGINEERING.54 13.3 VARIATION PROCEDURE.54 13.4 PAYMENT IN APPLICABLE CURRENCIES.55 13.5 PROVISIONAL SUMS.55 13.6 DAYWORK.56 13.7 ADJUSTMENTS FOR CHANGES IN LEGISLATION.56 13.8 ADJUSTMENTS FOR CHANGES IN COST.57 14 CONTRACT PRICE AND PAYMENT.57 14.1 THE CONTRACT PRICE.57 14.2 ADVANCE PAYMENT.58 14.3 APPLICATION FOR INTERIM PAYMENTS.59 14.4 SCHEDULE OF PAYMENTS.60 14.5 PLANT AND MATERIALS INTENDED FOR THE WORKS.60 14.6 INTERIM PAYMENTS.61 14.7 TIMING OF PAYMENTS.61 14.8 DELAYED PAYMENT.62 14.9 PAYMENT OF RETENTION MONEY.62 14.10 STATEMENT AT COMPLETION.63 14.11 APPLICATION FOR FINAL PAYMENT.63 14.12 DISCHARGE.64 14.13 FINAL PAYMENT.64 14.14 CESSATION OF EMPLOYERS LIABILITY.64 14.15 CURRENCIES OF PAYMENT.65 15 TERMINATION BY EMPLOYER .66 15.1 NOTICE TO CORRECT.66 15.2 TER
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 民用航空地面服务操作标准
- 智能制造设备实训报告模板
- 湘教版小学美术二年级上册形形色色的背景教学教案
- 细菌真菌自然生态课堂教学设计
- 2025年及未来5年中国集装箱吊具行业运行态势及未来发展趋势预测报告
- 高空作业安全检查填写表格样本
- 企业电子商务项目策划方案范本
- 未来五年不完整房屋企业制定与实施新质生产力战略分析研究报告
- 未来五年手推车市场需求变化趋势与商业创新机遇分析研究报告
- 未来五年锌铜合金市场需求变化趋势与商业创新机遇分析研究报告
- 轮椅运用和床椅转移课件
- 无期限的六合公式汇编
- 先张法预应力混凝土管桩基础技术规程
- 基层应急能力提升课件培训
- 全国优质课一等奖中职《就业与创业指导》课件
- SBAR交接班模式在临床运用
- 催化裂化-认识催化裂化(石油加工课件)
- 超级方便的钢琴键盘和弦对照表
- 气管切开换药的护理操作程序(图解)
- 医技诊疗类医疗服务项目和价格表
- 2023年新兴铸管股份有限公司招聘笔试题库及答案解析
评论
0/150
提交评论