




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、in fact, everyone knows what they want, but not everyone has the courage to express it.简单易用轻享办公(word文档/a4打印/可编辑/页眉可删)purchase contract(采购合同范本英文版) (contract no.): _(date) :_(signed at) :_the buyer:_address: _(tel):_(fa_):_(e-mail):_the seller:_address: _(tel):_(fa_):_(e-mail):_the seller and the buye
2、r agree to conclude this contract subject to the terms and conditions stated below: 1.(name, specifications and quality of commodity): 2.(quantity): (_% more or less allowed) 3.(unit price):_4.(total amount):_5. (terms of delivery) fob/cfr/cif_6. (country of origin and manufacturers):_7.(packing):_
3、the packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. the seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. the measurement,
4、 gross weight, net weight and the cautions such as do not stack up side down, keep away from moisture, handle with care shall be stenciled on the surface of each package with fadeless pigment. 8.(shipping marks):_ 9.(time of shipment):_ 10.(port of loading):_ 11.(port of destination):_12.(insurance)
5、:_insurance shall be covered by the _ for 110% of the invoice value against _ risks and _ additional risks.13.(terms of payment): (1)letter of credit: the buyer shall, _ days prior to the time of shipment /after this contract comes into effect, open an irrevocable letter of credit in favor of the se
6、ller. the letter of credit shall e_pire _ days after the completion of loading of the shipment as stipulated. (2)documents against payment: after shipment, the seller shall draw asight bill of e_change on the buyer and deliver the documents throughsellers bank and _ bank to the buyer against payment
7、, i.e d/p.the buyer shall effect the payment immediately upon the first presentation of the bill(s) of e_change. (3)documents against acceptance: after shipment, the seller shall draw a sight bill of e_change, payable_ days after the buyers delivers the document through sellers bank and _bank to the
8、 buyer against acceptance (d/a _ days). the buyer shall make the paymentondate of the bill of e_change. (4)cash on delivery (cod): the buyer shall pay to the seller total amount within _ days after the receipt of the goods (this clauseis not applied to the terms of fob, cfr, cif). 14.(documents requ
9、ired): the seller shall present the following documents required to the bankfor negotiation/collection: (1)full set of clean on board ocean/combined transportation/land bills of lading and blank endorsed marked freight prepaid/ to collect; (2)signed commercial invoice in _copies indicating contract
10、no., l/c no. (terms of l/c) and shipping marks; (3)packing list/weight memo in _ copies issued by_;(4)certificate of quality in _ copies issued by_; (5)certificate of quantity in _ copies issued by_; (6)insurance policy/certificate in _ copies (terms of cif); (7)certificate of origin in _ copies iss
11、ued by_; (8)(shipping advice): the seller shall, within _ hours after shipment effected, send by courier each copy of the above-mentioned documents no. _. 15.(terms of shipment): (1)the seller shall, 30 days before the shipment date specified in the contract, advise the buyer by _ of the contract no
12、., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the buyer can charter a vessel/book shipping space. in the event of the sellers failure to effect loading when the vessel arrives duly at the loading port, all e_penses includingdead freight a
13、nd/or demurrage charges thus incurred shall be for the sellers account. (2)the seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. under cfr terms,the seller shall advise the buyer by _ of the contract no., commodity, invoice value and t
14、he date of dispatch two days before the shipment for the buyer to arrange insurance in time. 16.(shipping advice): the seller shall, immediately upon the completion of the loading of the goods, advise the buyer of the contract no., names of commodity, loading quantity, invoice values, gross weight,
15、name of vessel and shipment date by _ within _hours. 17.(quality guarantee): the seller shall guarantee that the commodity must be in conformity with the quatity, specifications and quantity specified in this contract and letter of quality guarantee. the guarantee period shall be _ months after the
16、arrival of the goods at the port of destination,and during the period the seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer. 18.(inspection): (1)the seller shall have the goods inspected by _ days before the shipment and have the inspect
17、ion certificate issued by_. the buyer may have the goods reinspected by _ after the goods?rrival at the destination. (2)the manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and
18、issue inspection certificates certifying the technical data and conclusion of the inspection.after arrival of the goods at the port of destination, the buyer shall apply to china commodity inspection bureau (hereinafter referred toas ccib) for a further inspection as to the specifications and quanti
19、ty/weight of the goods. if damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this contract, e_cept when the responsibilities lies with insurance company or shipping company, the buyer shall, within _ days after arrival of the goods a
20、t the port of destination, claim against the seller, or reject the goods according to the inspection certificate issued by ccib. in case of damage of the goods incurred due to thedesign or manufacture defects and/or in case the quality and performance are not in conformity with the contract, the buy
21、er shall, duringthe guarantee period, request ccib to make a survey. 19.(claim): the buyer shall make a claim against the seller (including replacement of the goods) by the further inspection certificate and all the e_penses incurred therefrom shall be borne by the seller. the claims mentioned above
22、 shall be regarded as being accepted if the seller fail to reply within _days after the seller received the buyers claim.20.(late delivery and penalty): should the seller fail to make delivery on time as stipulated in the contract, with the e_ception of force majeure causes specified in clause 21 of
23、 this contract, the buyer shall agree to postpone the delivery on the condition that the seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. the rate of penalty is charged at_% for every _ days, odd days less than _days should be counted as _
24、days. but the penalty, however, shall not e_ceed_% of the total value of the goods involved in the delayed delivery. in case the seller fail to make delivery _ days later than the time of shipment stipulated in the contract, the buyer shall have the right to cancel the contract andthe seller, in spi
25、te of the cancellation, shall nevertheless pay the aforesaid penalty to the buyer without delay. the buyer shall have the right to lodge a claim against the seller for the losses sustained if any. 21.(force majeure): the seller shall not be responsible for the delay of shipment or non-delivery of th
26、e goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. the seller shall advise the buyer immediately of the occurrence mentioned above and within_ days thereafter the seller shall send a notice by courier to the buyer for their acc
27、eptance of a certificate ofthe accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. under such circumstances the seller, however, are still under the obligation to take allnecessary measures to hasten the delivery of the goods. in case th
28、e accident lasts for more than _ days the buyer shall have the rightto cancel the contract. 22. (arbitration): any dispute arising from or in connection with the contract shall be settled through friendly negotiation. in case no settlement is reached,the dispute shall be submitted to china international economic and trade arbitration commission (cietac),shenzhen commission for arbitration in accordance with it
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年工业互联网平台数据加密算法效能评估与政策法规影响报告
- 2025年民办教育机构合规运营与品牌建设实践案例研究报告
- 2025年海洋生态修复技术与海洋环境保护政策创新研究报告
- 2025年房地产企业多元化布局下的产业链协同效应深度分析报告
- 现代煤化工培训课件
- 2025年营养师资格证考试冲刺试卷:深度解析基础理论与实操技巧
- 2025年Python边缘计算架构考试专项训练试卷 知识点精讲版
- 2025年注册会计师(CPA)考试 会计科目冲刺复习必做模拟试卷
- 2025年公务员考试申论热点问题押题试卷 时政素材专项训练
- 2025年高考数学三角函数专项训练冲刺押题试卷
- 保险学PPT完整全套教学课件
- 2023-2024学年湖北省武汉市小学语文二年级期末自测试题附参考答案和详细解析
- 【个人简历】景观设计师求职个人简历模板
- 汽车服务工程(第2版)-鲁植雄课件第二章 汽车营销服务
- 中华人民共和国史马工程课件02第二章
- 《股骨颈骨折》课件
- YS/T 231-2007钨精矿
- GB/T 9113-2010整体钢制管法兰
- GB/T 18983-2017淬火-回火弹簧钢丝
- GB/T 15972.1-1998光纤总规范第1部分:总则
- 《夯实法治基石》设计 省赛一等奖
评论
0/150
提交评论