版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、SCD- 2006HSE-P-SSP-001 Scaffolding Safety SCD- 2006HSE-P-SSP-00 SCD- 2006 HSE-P-SSP-00 (#) Objectives Upon completion of the course, the participants will be able to: Name the three types of scaffolds and describe their main characteristics List at least three of the four main hazards to which perso
2、ns working on scaffolds are exposed Identify the three essential elements of safe scaffold construction 1. Name the three types of hazards that are predominant when using stairs or ladders at a construction site. SCD- 2006 HSE-P-SSP-00 (#) What Is A Scaffold? An elevated, temporary work platform Thr
3、ee basic types: Supported scaffolds - platforms supported by rigid, load bearing members, such as poles, legs, frames, and it has not been inspected and is not approved for use. No personnel is allowed on a scaffold while this symbol is shown. . The scaffold must be checked by an Authorised/ Compete
4、nt Inspector to ensure it is safe and meets the requirements. Scafftag SCD- 2006 HSE-P-SSP-00 (#) SCAFFTAG SCAFFOLD Erection and Inspection Record LOCATION REF NO. DATE ERECTED REQUESTED BY BUILT BY NAME OF COMPETENT PERSON SIGNATURE SCAFFOLD TO BE USED FOR Light Duty 225 kg Medium Duty 450 kg Heavy
5、 Duty 675 kg If the scaffold is safe after inspection be the competent person/ Inspector, A GREEN Tag will be displayed. All details on the tag must be completed to make it valid . A duplicate “ Inspection”tag for each scaffold is kept in the AuthorizedInspectors office. Scafftag SCD- 2006 HSE-P-SSP
6、-00 (#) SCAFFTAG Erection and Inspection Record LOCATION Ref. No Date Erected Requested by Built by Name of competent person Signature Scaffold to be used for Light Duty Medium Duty Heavy Duty Never work unless you are authorised to do so. You must work under supervision. Always check the last inspe
7、ction date on the “Inspection” tag. Ensure that the Safe Working Load (SWL) of the scaffold is not exceeded. If you detect any faults with a scaffold, even if it has a valid Inspection Tag, report the problem to the Supervisor immediately. Scafftag SCD- 2006 HSE-P-SSP-00 (#) Summary Use appropriate scaffold construction methods Erect, move, or alter scaffold properly Protect from falling objects or tools Ensure stable access Use a competent person Train on scaffold construction and the hazards involved with scaffolds
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 二手烟暴露与儿童慢性下呼吸道疾病的早期识别
- 二噁英致皮肤病的临床特征与早期干预策略
- 味精充填封装工岗前技术实务考核试卷含答案
- 2025年陕西煤业化工集团有限责任公司助力汉阴“乡村振兴”稳岗就业专场招聘40人笔试参考题库附带答案详解(3卷)
- 2025年襄阳宜城市农业技术推广中心公开招聘工作人员4人笔试参考题库附带答案详解(3卷)
- 2025年广东省铁路建设投资集团有限公司校园招聘笔试参考题库附带答案详解(3卷)
- 2025年中国能建陕西院勘测工程公司招聘笔试参考题库附带答案详解(3卷)
- 国家事业单位招聘2023中国地方志工作办公室招聘3人笔试历年参考题库典型考点附带答案详解(3卷合一)
- 磁记录材料涂布工岗前班组协作考核试卷含答案
- 保健调理师岗前操作规范考核试卷含答案
- 《市场营销专业申报》课件
- 三年级数学上册 (提高版)第8章《分数的初步认识》单元培优拔高测评试题(教师版含解析)(人教版)
- 19计科机器学习学习通超星期末考试答案章节答案2024年
- 全国职业院校技能大赛赛项规程(高职)农产品质量安全检测
- DB51∕T 3179-2024 杵针技术操作规范
- 专利共同申请合同模板(2024版)
- 国开机考答案21-人文英语1(闭卷)
- AQ∕T 7009-2013 机械制造企业安全生产标准化规范
- MOOC 近代物理实验-西南大学 中国大学慕课答案
- 教科版三年级科学上册课件《运动和位置》
- 河北省部分地区2023-2024学年度高二上学期期末考试英语试题(解析版)
评论
0/150
提交评论