版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、McGraw-Hill/IrwinCopyright 2005 by The McGraw-Hill Companies, Inc. All rights reserved.ENTERPRISE INFORMATION SYSTEMSA PATTERN BASED APPROACH生產循環生產循環REA概念資料模式概念資料模式The Conversion Business Process2Conversion Cycle Core REA Pattern3Conversion Cycle Extended Business Process Level Pattern4Cookie Baking
2、 Conversion Business Process Level ModelConversion Cycle Events Economic Increment Event Production Run; the event that produces a finished product resource Represents a batch or job in a job-order-costing environment (and may be labeled as such) Represents a machine run in a process-costing environ
3、ment, or some equivalent time period such as a growing season Data typically captured include an assigned identifier, starting date/time and ending date/time of the event, and data as to the resources and agents involved in the production run56Relational Tables Encompassing Production Run Event7Conv
4、ersion Cycle Events Economic Decrement Event Materials Issuance Represents the using up of raw materials in the production process. Those raw materials are usually transformed into finished goods and lose their own identity and nature in the process. Is usually symbolized by a move ticket or similar
5、 document Data typically captured include date/time of issuance; origin and destination of the issuance, the underlying production order, and the agents involved in authorizing it (supervisor) and executing it (inventory clerk)8Move Ticket for Material Issuance9Relational Tables Encompassing Materia
6、l Issuance Event10Conversion Cycle Events Economic Decrement Event Labor Operation Represents the performance of a particular activity in the conversion process by a production employee, thereby using up that persons labor Is usually symbolized by a job time ticket or time track form Data typically
7、captured include the starting and stopping times for the labor operations and descriptions of the labor operations on a specific date by a specific employee 11Job Time Ticket for Labor Operation12Relational Tables Encompassing Labor Operation Event13Conversion Cycle Events Economic Decrement Event M
8、achine Operation Represents the performance of a particular activity in the conversion process by a machine, thereby consuming part of the machines useful life Is usually symbolized by an entry on the WIP job ticket Data typically captured includes the starting and stopping dates and times for the m
9、achine operations, what machines were involved, who authorized them (supervisor) and who executed them (production employee)14Relational Tables Encompassing Machine Operation Event15Conversion Cycle Events Increment Commitment Event Production (Job) Order A commitment event that schedules a work-in-
10、process job, committing to a future increase in finished products Is usually symbolized by a Production Order number and data such as what finished good is being produced, what quantity is being produced, who approved it, the order date and requested completion date. The production order document ma
11、y also summarize data such as what specific labor operations and materials are needed 16Production Order17Relational Tables Encompassing Production Order Event18Conversion Cycle Events Decrement Commitment Event Raw Materials (or Labor or Machine) Requisition Is a Commitment event whereby the produc
12、tion commits to transfer materials from the materials warehouse to the production floor, thus it commits to a future decrease in materials (or labor or machinery). If insufficient materials are on-hand in the warehouse or if insufficient labor is available, this may trigger activities in the purchas
13、ing or payroll departments; however, those activities are part of the acquisition/payment and payroll processes, not the conversion process Is usually symbolized by a materials requisition document Data captured typically include the date/time of requisition and information about the resources and a
14、gents involved in the event19Materials Requisition20Relational Tables Encompassing Materials Requisition Event21Conversion Cycle Relationships Duality Transformations are more complex than transfers found in other processes Involve materials use, labor use, and equipment consumption Often compromise
15、d such that only materials use is tracked directly, with labor and equipment consumption costs assigned via some allocation scheme Often labor operations and machine operations are not maintained separately from work-in-process job because they are subsumed into the job; relationships of the product
16、ion run to the labor type and machine resources are often maintained22Conversion Cycle Relationships Stock-flow Materials and labor are typically used up completely in the material issuances and labor operations; such stock flows are called Use Machines are typically only partially used up in machin
17、e operations, such a stock flow is called Consume Finished goods are produced by the production run (similar to inventory being purchased in acquisition cycle) Fulfillment Material issuances fulfill raw material requisitions Production runs fulfill production orders23Conversion Cycle Relationships R
18、eservations Raw materials are reserved for use via the requisition event Finished Goods are reserved for availability via the production order Participation relationships Typically all agents in the conversion cycle are internal agents Usually includes a direct association relationship (responsibili
19、ty) between production supervisors and employees24Conversion Cycle Relationships Linkages Between Materials and Finished Goods Contains information needed for Bill of Materials, I.e., a finished good is composed of what raw material items (in what quantities) Between Labor (type) and Finished Goods Contains information needed for Operations List, I.e., a what labor operations are needed to produce a finished good25Bill of MaterialsCaptures Linkage (Raw Materials-Finished Goods) inf
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 护理人文关怀的护理挑战
- 普外科常见手术护理配合
- 水痘患者康复指导材料分享
- 2026年重庆两江新区指标到校考试物理试卷试题(含答案)
- 游戏网红达人合作协议
- 卫生系统招考试题及答案
- 2026年肠粘连松解后康复诊疗试题及答案(消化内科版)
- Q-GDW 13195.3-2018 智能变电站220kV~750kV母线保护采购标准 第3部分:智能变电站220kV~750kV 3/2断路器接线的母线保护专用技术规范
- 2026年小程序开发技术服务协议
- 广东省佛山市实验学校2024-2025学年八年级下学期期中考道德与法治试题(含答案)
- 即兴表演神经机制-洞察及研究
- 处方审核培训课件
- -视觉质量评价
- 绿化部门油品管理制度
- 京东商品流程管理制度
- 2025年江苏省常州市中考二模英语试题
- 部队文职协议班合同
- 客运驾驶员安全培训课件
- 人工智能技术在职业技能提升中的心得体会
- 地理八年级下册《台湾省的地理环境与经济发展》课件
- GB/T 44755-2024低压高强紫外线灯
评论
0/150
提交评论