版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、ENROUTEEnroute ProceduresEnroute Activities Staying in communication with ATC Making necessary reports Responding to clearances Monitoring your position Keeping up with any changes to the airplanes equipment status or weather.Enroute Radar Procedures When PIC / IFR / controlled airspace:required to
2、continuously monitor an appropriate center or control frequency Transitioning to Enroute phaseHandoff from departure to centerIf TEC, handoff from departure to approachCommunication When told to switch frequencies, acknowledge by repeating Initial Callupfacility identificationaircraft identification
3、altitudeassigned altitudeCommunication Flow After your callupATC verifies with Mode CController acknowledges and states “Radar Contact” If silence, return to previous frequencyAIM recommends waiting for a minute If continued silence, try other ARTCC frequencies, then FSS, other aircraft.REQUIRED REP
4、ORTS14CFR 91.183 & 91.187 UNFORECAST WEATHER SAFETY OF FLIGHT ALTITUDE & TIME OVER REQUESTED REPORTING POINTS FAILURE OF NAVIGATION, APPROACH, OR COMMUNICATION EQUIPMENT IN CONTROLLED AIRSPACE14CFR 91.187 MALFUNCTION REPORT WHO YOU ARE WHAT BROKE HOW IT IS AFFECTING YOUR IFR CAPABILITY WHAT
5、HELP DO YOU NEED FROM ATC?SHOULD ALWAYS REPORT WITHOUT REQUEST (AIM 5-3-3) VACATING ASSIGNED ALTITUDE ALTITUDE CHANGES WHEN VFR-ON-TOP CHANGE IN TAS 5% OR 10 KTS (WHICHEVER IS GREATER) UNABLE TO CLIMB/DESCEND AT LEAST 500 FPM UPON REACHING/LEAVING HOLDING FIX OR CLEARANCE LIMIT MISSED APPROACHNON-RA
6、DAR REPORTSPOSITION REPORTS (91.183a)INBOUND AT FAF OR OMETA ERROR GREATER THAN 3 MINExamples of IFR ReportsGiving a Position Report“IPATTENS”POSITION REPORT AIM 5-3-2 d IDENTIFICATION POSITION ALTITUDE TIME TYPE OF FLIGHT PLAN (FOR FSS) ETA & NAME OF NEXT FIX NAME ONLY OF FOLLOWING FIX SUPPLEME
7、NTARY INFO (REMARKS)Enroute Nav Using GPS Only panel mounted GPS are approved for IFR enroute flight.Primary means of point to pointStill need alternate means of navigation If RAIM is available, active monitoring of the alternate nav isnt necessary. Always back up with an airway route.GPS Requiremen
8、tsSpecial Use Airspace If you file through an active restricted airspace, chances are youll be re-routed. Inactive areas are generally no problem. CALL AHEAD! If your IFR clearance routes you through a restricted area you have permission to be there. ATC (the controlling agency) has checked with the
9、 military or government. (the using agency) IFR Cruising Altitudes 14 CFR Part 91.179 When IFR in controlled airspace, as assignedwhen uncontrolled, magnetic course based Altimeter setting: station within 100nm Above 18,000MSL: conflicts with traffic below could arise when settings are lower than 29.92 however Lowest usable flight levels listed in part 91.121Descending From the Enroute Segment Descent Clearance“Descend to and maintain ”Respond NOW!Optimum descent until within 1000 ft of assigned altitude then 500
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年科技制造业ESG领先企业实践路径:连续四年MSCI AAA评级解析
- 投资性房地产的转换和处置处理
- 水痘症状观察与记录
- 2026年水库游泳安全须知
- 2026年实验室安全知识竞赛
- 2026年山野安全培训
- 2026护理论文撰写写作思路(含2026宫腔镜护理措施)
- DB37-T 4510-2022 矿井供电系统电能质量检测技术规范
- 新型环保智能化处置产业-固体废物利用项目可行性研究报告模板-备案拿地
- 新生儿常见病预防与处理
- 【MOOC】管理会计工具与应用-江苏理工学院 中国大学慕课MOOC答案
- 《信息技术(基础模块)麒麟操作系统+WPSOffice(微课版)》全套教学课件
- 马尾神经综合征个案护理
- 2023年北京大学留学生入学考试英语试卷
- 人音版小学六年级下册音乐全册教案(教学设计)
- 中型水库除险加固工程蓄水安全鉴定自检报告
- 电路分析基础第2版卢飒课后参考答案
- 孙权劝学省公共课一等奖全国赛课获奖课件
- JCT 906-2023 混凝土地面用水泥基耐磨材料 (正式版)
- 2023工业园区分布式光伏发电项目可研报告
- 大单元下的教学评一体化
评论
0/150
提交评论