




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Unit 4 ReadingThe first underground in the world2. What did Charles Holden do?He designed the most famous of the new stations constructed between 1918 and 1938. When was the first underground system opened?In 1863.3. Why was the Victoria Line important? It was important because it linked withother l
2、ines at almost every station, helping make the system more user-friendly.Read again and answer.1. Why was an underground system first developed in London? Most railway tracks did not go into the London city centre, so buses, trams, cabs and carriages were required. The number of vehicles on the road
3、 caused unbelievable traffic.2. What was the London Underground like in 1863? The tunnels were just beneath he surface of the ground. The carriages did not have windows and were pulled by steam engines through the narrow tunnels.3. What did Charles Yerkes do to improve the underground system? He obt
4、ained ownership of the many different lines and set up the Underground Electric Railways Company of London. 4. What unusual uses did the tube have during World War ? During World War , the tube was used as a bomb shelter, an airplane factory, a centre for directing the defence against air attacks an
5、d meeting rooms for the government administration.5. What happened to the London Underground after World War? After World War, the underground system was enlarged and more lines were added because more people travelled on the underground.6. What does it mean when the brochure says that the undergrou
6、nd system is user-friendly? It means it is very convenient for passengers to go to different places in the city from any station.The following years indicate the important stages in the development of the London Underground. Find the information to match the years.An underground railway was approved
7、 to be built.The first tunnels were opened.The next section of the underground system was opened.Two companies linked up to provide underground service in the middle of the city. The first railway tunnel under the River Thames was dug.The first electric underground railway was opened.The London Pass
8、enger Transport Board was created.More new stations were constructed.The Jubilee Line was opened.1Reasons2-4Developments5unusual uses6-7ExpansionpopularityHow many parts can the passage be divided into? What does each part focus on?Reading a tourist brochureWhat are the main features of a brochure?1
9、. Dates/years in chronological order 2. Sometimes persons who have made great contributions3. Some historical events that have influencesLanguage points1. have the distinction of 因因而优秀,卓越而优秀,卓越 L22. during the first half of the 19th century L3-43. traffic jam 交通阻塞交通阻塞 L84. lead to L95. give approval
10、 to 赞成,同意赞成,同意 L116. a large amount of money L157. pull through 渡过危机(难关),恢复健康渡过危机(难关),恢复健康 L188. link up 连接,联合连接,联合 L219. at regular intervals 每隔一段每隔一段 L2410. accelerate the pace of 加快步伐加快步伐 L2811. far from L3212. set up L3513. under the authority of 在在掌管下掌管下 L3914. function as 作为作为 L4415. be used a
11、s 用作用作 L4516. be linked with L5117. in honor of L5318. huge numbers of L5519. why not do sth L5920. permit sb. to do sth. L601. However, most trains to London only went to the outer city limits, because building railway tracks into the city would have caused damaged many old buildings. (P50 L4-6)难句解
12、析难句解析句子结构分析:句子结构分析:在这个复合句中,在这个复合句中,most trains to London only went to the outer city limits是主句;是主句;because building railway tracks into the city would have damaged many old buildings是原因状语是原因状语从句。从句。to London和和to the outer city都为都为介词短语作定语,分别修饰介词短语作定语,分别修饰trains和和railway tracks。2. Unfortunately, the n
13、umber of vehicles on the road caused unbelievable traffic jams, and the roads became so busy that no one could travel anywhere. (P50 L7-9)句子结构分析:句子结构分析:此句为此句为and连接起来连接起来的并列句。第一个分句为一个简单句;的并列句。第一个分句为一个简单句;第二个分句为结果状语主从复合句第二个分句为结果状语主从复合句, the roads became so busy 是主句是主句, that no one could travel anywher
14、e是结果状语从是结果状语从句。句。3. Travelling on these lines was not convenient, though, as each line was possessed by a different company, and many were very far from each other. (P50 L31-32)1) 句子结构分析:句子结构分析:Travelling on these lines was not convenient, though为主句,为主句,as each line was possessed by a different comp
15、any, and many were very far from each other为原因状语从句;状语从句又为原因状语从句;状语从句又为由为由and连接的两个并列句。连接的两个并列句。2) 语言知识分析:语言知识分析:Travelling on these lines was inconvenient, though意为意为“然而,搭乘这些线路很不方然而,搭乘这些线路很不方便便”,句子中的句子中的though为副词,意为为副词,意为“可可是,不过,然而是,不过,然而”,常被置于句中或句末。,常被置于句中或句末。4. Having seen the situation, a wealthy
16、American businessman, Charles Yerkes, undertook improving the system in 1902 by obtaining ownership of the many different lines and setting up the Underground Electric Railways Company of London. (P51 L33-36)1)句子结构分析:句子结构分析:此句虽然很长,但实此句虽然很长,但实际上是一个简单句。主干为际上是一个简单句。主干为a wealthy American businessman und
17、ertook improving the system。句首的。句首的Having seen the situation为为V-ing短语作状语;短语作状语;Charles Yerkes为为a wealthy American businessman的同位语;后面的的同位语;后面的by obtaining ownership .是方式状语。是方式状语。2) 语言知识分析:语言知识分析:Having seen the situation意为意为“看到这种看到这种情况情况”。一般说来,一般说来,V-ing形式作状语时,形式作状语时,逻辑主语为主句的主语,用完成式表示逻辑主语为主句的主语,用完成式表
18、示其动作发生在主句谓语动词的动作之前。其动作发生在主句谓语动词的动作之前。5. A new line was used as an underground airplane factory, an underground station was used as a centre for directing the defence against air attacks, and the station nearest the Prime Ministers house was used by the Prime Minister as meeting rooms for the administration of government. (P51 L45-48)句子结构分析:句子结构分析:此句为此句为and连接起来的三个并列句。第连接起来的三个并列句。第一个分句为一个分句为A new line w
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 眼镜儿童视力保护考核试卷
- 竞争力提升与造价咨询合同
- 第三方数据共享平台的安全认证与准入考核试卷
- 电话销售中的压力管理策略考核试卷
- 电子设备展会销售考核试卷
- 高级词汇作文课件
- 肉制品加工业的食品安全管理与控制技术研究考核试卷
- 游艺器材的防水防潮技术考核试卷
- 经纪人如何整合艺人宣传资源与推广渠道考核试卷
- 蒙台梭利教育学思想解析
- 电台项目可行性研究报告
- 2025年度事业单位招聘考试公共基础知识仿真模拟试卷及答案(共五套)
- 2025年广西壮族自治区南宁市中考一模生物试题(含答案)
- 长江流域大水面生态渔业的发展现状与发展潜力分析
- SQLSERVER如何配置内存提高性能配置方案
- 电视台影视拍摄合同协议
- 装配式建筑技术创新与可持续发展-全面剖析
- 装饰公司结算管理制度
- 实习生顶岗实习安全教育
- 网络灾难恢复计划试题及答案
- 物业五一节前安全教育
评论
0/150
提交评论