visteon公司顾客特殊要求手册(E)_第1页
visteon公司顾客特殊要求手册(E)_第2页
visteon公司顾客特殊要求手册(E)_第3页
visteon公司顾客特殊要求手册(E)_第4页
visteon公司顾客特殊要求手册(E)_第5页
已阅读5页,还剩15页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、.Visteon CorporationCustomer Specific RequirementsFor Use With ISO/TS 16949: 2002Visteon Corporation Customer Specific Requirements toISO/TS 16949:20021. IntroductionQuality professionals from Visteon collaboratively developed this document. The content of the document was developed using the Custom

2、er Specific Documents of several automotive OEMs and with the consultation of the Joint Task Force for Supplier Quality, Automotive Industry Action Group (AIAG).Key contact for interpretation of this requirements document is:Visteon Corporation:Supplier Development / Performance ManagerVisteon Techn

3、ical Center16630 Southfield RoadAllen Park, MI 48101Fax: 313-755-9644Email: supplierperformance2. Customer Requirements Document StructureThis document is structured as a companion document to ISO/TS 16949:2002. The paragraphs to this document mirror the paragraphs to ISO/TS 16949:2002. Where guidan

4、ce by the customer is referenced, a requirement will be stated to clarify Visteon interpretation. For suppliers of semiconductor components, the Customer Specific Requirements (ISO/TS 16949:2002) Semiconductor Commodity uses this same structure and should be used as a companion requirements document

5、 to this document and ISO/TS 16949:2002. The requirements of all three documents must be met where applicable.Some additional requirements are contained in the Annex B, which is not auditable by registrars. The contents of this entire document are considered requirements for doing business with Vist

6、eon and should be implemented even if the organization is not registered to ISO/TS 16949:2002. In second party audits, the expectation of Visteon is that all these requirements (where applicable) are implemented.3. Reference DocumentsThe following reference documents are available through AIAG (248-

7、358-3003) or Carwin Continuous (UK) in Europe (44-1-708-861333) and shall be used to develop the quality system. The AIAG reference manuals to the latest edition shall also be used. Production Part Approval Process, PPAPStatistical Process Control, SPCPotential Failure Mode and Effects Analysis, FME

8、AAdvanced Product Quality Planning and Control Plan, APQPMeasurement Systems Analysis, MSAMaterials Management Operations Guideline, MMOGThe Customer Specific Requirements (ISO/TS 16949:2002) Semiconductor Commodity is available from the Automotive Electronics Council website . Semiconductor Assembl

9、y Council (SAC) documents are available through .1. ScopeISO/TS 16949:2002 and this document define the fundamental quality system requirements for the Visteon Corporation supply chain. This document contains the company specific requirements supplemental to Technical Specification,

10、 ISO/TS 16949:2002. These supplemental requirements may also apply to QS-9000, ISO9001: 2000 and other similar registrations as applicable and developed within this document. These supplemental requirements shall be in the scope of the registration/certification audit in order to be recognized as sa

11、tisfying the Visteon supplier criteria for third-party certification by an IATF recognized and contracted certification body.All ISO/TS 16949:2002 requirements and the requirements of this document shall be documented in the organization's quality system. See for further clarification of

12、 other applicable standards and the requirements.The English language version of this document shall be the official version for purposes of third party registration. Any translations of this document shall be for reference only.Copies of this document are available at:Visteon Corporation: 2. Normat

13、ive referencesSee 3 above for a listing of references.3. Terms and DefinitionsASDE (Supplier Performance Engineer, SPE, in Europe)Advance Supplier Development Engineering is the group of engineers within Visteon that are responsible for assisting suppliers on a new program to launch products.Capacit

14、y verification A verification methodology to demonstrate that an organization can meet the capacity planning volume requirements as defined in the purchasing Request For Quote (RFQ).CustomerReferences within this document to “customer” shall be interpreted as Visteon. This pertains to the corporatio

15、n receiving and purchasing product from the organization.DVPRThis is the Design Validation Plan and Report. It contains the validation plan and subsequent report of the results.Family PartsThese are groups of parts processed on the same production line, using the same control plan, PFMEA and process

16、 equipment. The parts differ only in end item value. PPAP for the “family” is approved for using the extreme values to the “family” specification to bound the “family”. MMOG The Materials Management Operations Guidelines (MMOG) is a document jointly created by the Automotive Industry Action Group (A

17、IAG), OEM representatives, and automotive suppliers.MTBFMean Time Between Failure is a metric to measure the reliability of equipment.OEEOverall Equipment Effectiveness is a metric to determine the utilization of equipment in a manufacturing process.OEMOriginal Equipment Manufacturer (OEM) is intend

18、ed to be the end item producer of the vehicle.OrganizationProviders of production or service parts, or heat treating or other finishing services directly Visteon. Within Visteon, the organization is commonly referred to as the “supplier”.Paynter ChartA Paynter Chart tracks specific defects or issues

19、 over time to verify effectiveness of containments and corrective actions.Quality RoadmapA quality roadmap is a communication tool to provide the customer a plan to reduce quality defects. This tool includes the use of trend lines, performance goals, Pareto charts, Paynter charts and 8Ds.Report Card

20、An on-line information system that provides Quality and Delivery rating information to organizations that supply Visteon. The external website to access is Report Card (http:/www.visteon-RMAA returned material authorization is a tracking number supplied from an organization authorizing the return of

21、 material.SDESupplier Development Engineering (SDE) is the group of engineers within Visteon responsible for assisting suppliers with current model quality issues. Supplier, or organization, manufacturing sites are assigned to specific SDEs.SPESupplier Performance Engineering is the group responsibl

22、e for APQP in Europe. They are equivalent to the ASDE group.ShallA mandatory requirement.ShouldIndicates a mandatory requirement with some flexibility allowed in compliance methodology.SubcontractorProvider of production or service materials or services directly to the organization.VPDSThis is the V

23、isteon Product Development System. It includes a series of performance gates to validate readiness to move to the next gate in the product development process. These gates include evaluation of supply chain readiness.4. Quality Management System4.1 General requirements 4.1S All ISO/TS 16949:2002 req

24、uirements and the requirements of this document shall be documented in the organization's quality system. See for further clarification of other applicable standards and the requirements.The entire facility (producing automotive products for Visteon) must be registered to the applicable

25、standard. Where the entire facility does not produce automotive products, a clear definition of what product lines are registered shall be included in the registration scope.4.2 Documentation requirements4.2.2S Quality manualAll ISO/TS 16949:2002 requirements and the requirements of this document wi

26、ll be included in the organization's quality system.4.2.4.S Control of RecordsProduction part approvals, tooling records, purchase orders and amendments shall be maintained for the length of time that the part (or family of parts) is active for production and service requirements plus ten calend

27、ar years unless otherwise specified by Visteon for their respective products. This includes any customer owned tooling. Production inspection and test records (e.g., control charts, inspection and test results) shall be retained for one calendar year after the year in which they were created. Record

28、s of inspection shall be maintained for each inspection or test performed. Where practical, the actual test result (variables or attributes) should be recorded.Simple pass/fail records of inspection are not acceptable for variables measurements.Records for internal quality audits and management revi

29、ew shall be retained for three years.Some programs may require longer retention periods than specified above. An organization may specify the retention period in its procedures or specifications.The above does not supersede any regulatory requirements.5. Management Responsibility5.2S Customer focusT

30、he organization shall demonstrate customer satisfaction through meeting continuous improvement objectives consistent with a well-developed QOS/BOS. See 5.6 for additional information on content and frequency. A self- assessment of QOS/BOS effectiveness shall be done yearly. Annex A contains a sugges

31、ted outline of BOS/QOS metrics.5.5 Responsibility, authority and communicationS Customer representativeThe organization customer representative is the primary interface to the customer. When the customer representative changes, the organization shall notify Visteon Supplier Performance, Commo

32、dity Purchasing and shall update the Report Card contacts as appropriate. If the organization changes senior management responsible for quality or company ownership, Visteon Commodity Purchasing shall be notified within 10 business days. This notification may be completed through an email and copied

33、 to the SDE of record on Report Card.5.6 Management review5.6S The organization management shall hold monthly QOS/BOS performance meetings. These meetings shall review all facets of the business including design, manufacturing, logistics, customer satisfaction, subcontractor performance and new busi

34、ness development. The meetings need not be held as one meeting, but may be a series of meetings covering each of the metrics each month. The QOS/BOS process shall be documented as part of the organization documentation.6.2 Human ResourcesS TrainingThe organization shall ensure that only train

35、ed and qualified personnel are involved in all aspects of the design and manufacture Visteon products. This training will include the appropriate Visteon systems.Records of training will be traceable to the revision of the source training material (e.g., policy, procedure, work instruction). These r

36、ecords are to be maintained for 3 years from the date of the training.6.3 Infrastructure6.3.1S Plant, Facility and Equipment Planning The organization shall have lean manufacturing implementation plans.6.3.2S Contingency PlansThe organization shall prepare a contingency plan following guidelines ava

37、ilable at . Upon request, the organization shall provide a copy of their contingency plans to Visteon.The organization shall notify Visteon receiving plants, the buyer and the SDE of record on Report Card within 24 hours of organization production interruption. The nature of the interruption shall b

38、e communicated with the immediate actions taken to assure supply of product. Production interruptions may include (but are not limited to) natural disasters, political unrest, war, capacity issues, quality issues, labor strikes or other events that prevent the organization from meeting the specified

39、 capacity volumes6.4 Work Environment6.4.2S Cleanliness of PremisesThis requirement includes the dunnage used to transport the product including returnable dunnage.7. Product Realization7.1S Planning of Product RealizationThe AIAG Advanced Product Quality Planning and Control Plan reference manual s

40、hall be used as a guide to develop and report progress on new programs. Reporting of APQP status shall utilize the forms and process flows provided by the responsible ASDE (SPE in Europe) and available at .7.2 Customer-related ProcessesRegistration to ISO 14001 is required by December 31, 2004.End o

41、f life vehicle (ELV) reporting requirements are required as follows: Report prior to PPAP of the product and confirm completion for PPAP. Please contact the World Wide Visteon IMDS Manager (313-755-7384) for specific reporting requirements and see . S Customer-designated Special Characteristi

42、csOEMs develop symbols for the definition of critical characteristics (safety sensitive) and significant characteristics (performance sensitive). Visteon has defined specific symbols for use on control plans, drawings or FMEAs and are documented in the Visteon Special Characteristics Identification

43、Process at . Some OEM programs may dictate the use of the OEM symbols. If so, the ASDE/SPE will notify the supplier of those requirements.S Review of Requirements Related to Product- SupplementalWaiving of the requirement to review product requirements shall be obtained from the Commodity Buy

44、er.S Organization Manufacturing FeasibilityManufacturing feasibility reviews (AIAG, Advanced Product Quality Planning and Control Plan, Appendix E) shall include supplier and customer organizations as appropriate. Suppliers shall manage short-term product volume changes of less than 20%. The

45、organization shall notify Visteon for volume changes of a more permanent nature, identify any capacity constraints and provide an evaluation of any risks to the customer.S Customer Communication-SupplementalDuring the request for quote response, the organization shall verify the data exchange

46、 formats with Visteon. The Buyer will assist in the coordination of the definition of these requirements.7.3 Design and DevelopmentS Multidisciplinary ApproachNew Model Program RequirementsPersonnelThe organization shall ensure that new Visteon programs are properly managed and resourced with

47、in the organization. A supplier Program Manager shall be appointed for each Visteon Program and an Organization Chart of their support team provided.Advanced Product Quality Planning The supplier shall carry out APQP on all new Visteon components. The Program Manager or their designee will lead the

48、APQP Process for any new Visteon component and shall provide monthly updates of the APQP Status Report (and any supporting notes) to the Visteon Program Buyer. If a component has been designated as High Impact, the supplier shall also provide monthly updates to the Visteon Supplier Program Engineer

49、(in Europe), Advance Supplier Development Engineer (at all other Visteon locations) or other designated person. All members of the organizations support team shall be suitably trained in the particular APQP Process as defined by Visteon. An alternative quality planning process may be specified when

50、required by Visteon's Customer Input Requirements.Launch Readiness/Safe Launch Reviews The Program Manager or their designate shall ensure that the Visteon designated LRR/Safe Launch Process is carried out on any new Visteon component that has been identified as high impact. All data integral to

51、 this process such as Overall Equipment Effectiveness (OEE) and compliance to MMOG shall be made available to Visteon for confidential review. Visteon shall specify the type of Review Process to be followed and the reporting frequency.PSW Submission PSW submissions shall follow the AIAG PPAP manual,

52、 but the warrant shall be the Visteon form available at . The organizations PPAP Submission Level will be defined by Visteon in the APQP Process. This is normally set at the level identified in Report card, but may differ according to program or other requirements. An alternative approval process ma

53、y be specified when required by Visteon's Customer Input Requirements.Launch Support As agreed in the supplier's Safe Launch Plan, appropriate supplier personnel will either be on-site at Visteon or on 24 hr call to support a Visteon plant's needs during a Launch Phase. Visteon will defi

54、ne the duration of this Phase.Launch ConcernsThe Supplier shall respond to Launch concerns in accordance with the 'Visteon Safe and Flawless Launch Expectations' available at FMEA and Control Plan Approvals Design engineering and SDE/ASDE/SPE approval is required for FMEAs and control plans

55、for designated safety or regulatory items regardless of the site's PPAP level. Approval may take the form of PSW approval by SDE/ASDE/SPE and the responsible design engineer, but the preferred method is to sign the documents. Approval of changes to these documents after initial acceptance is als

56、o required.Visteon reserves the right to require approval of FMEA and/or control plans for any Visteon purchased part from any supplier organization.FMEAsThe organization shall prepare documented process FMEAs for all part numbers supplied to Visteon.Where the organization is responsible for design,

57、 the organization shall prepare a documented design FMEAs for all parts it designs for Visteon. A formally documented design FMEA may be waived by the SDE/ASDE/SPE manager for parts that are commercial off the shelf items or which use computer aided design checks to check design integrity (e.g., design rule and manufacturability checks).FMEAs may be written for families of parts where batch processes and common tool

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论