版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、 AGREEMENTFOR XXXXXXXXXXXXXXXXXXX BETWEEN AND THIS AGREEMENT is made onXX/XX/2011,by and between . (hereinafter called “The employer”) and _ Company Ltd. (hereinafter called “The contractor”).WHEREAS:1. The employer is desirous of carrying out the (hereinafter referred to as “The Works”)2. The contr
2、actor has agreed to execute the said work in strict compliance with the terms of this Agreement.NOW IT IS HEREBY AGREED AS FOLLOWS:1. Commencement: This Agreement shall commence on the date first above written.2. Location of work: The employers worksite in .3. Scope of work:The contractor shall unde
3、rtake the .4. Period of completion:The work shall be completed within a period of days from the date first above written as commencement date in this agreement.5. Contract sum:The total value of the contract shall be the sum of N _Naira only.6. Mode of payment: First installment:The employer shall p
4、ay to the contractor ninety five percent of the total price, i.e. Naira only upon completion of the work.Second installment: The employer shall pay to the contractor five percent of the difference of the total price, i.e._ Naira. only,two weeks later, after the work received has been proved qualifie
5、d.7.Penalty for default:In the event the contractor shall fail to complete the work in time owing to reasons that the contractor shall be held liable, the contractor shall pay a penalty for such default based on one out of a thousand of the total price for installation work per day , i.e._Naira,only
6、 for each day of such default.8.Increase or decrease of work:In case the employer has to amend,increase or decrease the working schedule, the corresponding increase or decrease of total price shall be evaluated according to the terms and conditions between the two Parties, Should the work be increas
7、ed, the Parties shall enter into an agreement for the unit price of additional items. Should any part of the completed work of any part of the materials transported to the site have to be abandoned owing to amendment made by the employer, The employer shall, after having received the work, pay for e
8、ach completed work or materials abandoned as per the unit price specified to the contractor.9.Supervision for progress and quantity:The supervision personnel appointed by the employer and its representative shall have the authority to supervise the progress and quantity of the work and give instruct
9、ion. The contractor shall perform correctly in accordance with such instruction given by the employers personnel or representative. If the work can not achieve the quantity standard from the client, the contractor must redo it without any extra payment and the contractor have to finish the work with
10、in the period of the completion.10.Stopage work:Should the employer notify the contractor to stop the work for reasons beyond the responsibility of the contractor, the contractor can stop the work and claim from the employer the price of finished work, materials at site and other reasonable expenses
11、 to be added or deducted from the paid installments.11.Custody of work:The completed work and the materials, tools, and equipment at site shall be under the custody of the contractor after commencement and before completion and delivery of the work. Unless in the event of Force Majeure, the contract
12、or shall be fully responsible for any damage of the work under the custody of the contractor. In case of Force Majeure, the contractor shall give a list of damage according to the actual condition and suggest an expected price and date for recovery from such damage to the employer for checking and p
13、ayment. Should the employer decide not to continue with the work, this contract shall be terminated according to article 10 hereof.12. Warranty for work.The contractor shall warrant the promised condition of the work within _ year(s) after the date of receiving the work by the employer. However, the
14、 contractor shall not be liable to Acts of God or misuse of the work by the employer.13.Supplemental provisions:The contractor shall be held responsible if the contractors personnel or other people are injured due to the negligence of the contractor during the progress of construction. 14.Attachment
15、s :Attachments shall become an integral part of this Agreement and shall be as effective as any other provisions. Attachments include: (1)Quotation.(2)Drawing15.Format of this Agreement:The Agreement shall be in duplicate with two texts to be held separately by the Parties hereof. Each of the Partie
16、s shall also keep two copies of the contract for record.16.Additional Provision : This contract has been executed by the Parties as of the day and year first above written.The employer: CGC NIGERIA LIMITED The contractor:_by:_ by:_Date:_ Date:_中文翻译本合同于_年_月_日,_(简称甲方)与_(简称乙方)签订。1.甲方将XXXXX工程发包。2.乙方已同意进
17、行此分包工程并严格执行以下合同条款。以下为合同条款:1合同生效时间:_。(具体根据分包内容确定)2工程地点:甲方_。3工程范围:(具体根据分包内容确定)4完工期限: (具体根据分包内容确定)5安装工程总价格:_奈拉整。6安装工程付款进度:(具体根据分包内容确定)第一期:甲方在本合同开始实施时,付给乙方工程总价xx%,即_奈拉整。第二期:甲方在xxx时,付给乙方工程总价xx%,即_奈拉整;7违约罚款:(具体根据分包内容确定)因乙方原因未准时完工时,应由乙方负责,应付违约罚款,每天按总价的1%计算,即_奈拉整。8增加或减少工程:若甲方需修改、增加或减少其工程计划时,总价之增减,应按双方规定之订单计
18、算。若需新增加工程量,双方应另行协商该项新增加工程之单价。若甲方因修改原计划而将已完工部分工程或已运抵工地之材料弃置,甲方在验收后,应按双方规定的单价对乙方已完成的工程费用及材料费,予以支付。9监督进度与质量:甲方派去的监督人员或代表对工程进度和质量予以监督并有权予以监工、指导。乙方应按甲方人员或代表的指示正确施工,不得以任何借口置之不理。若因乙方施工质量不能达到甲方质量标准时,乙方须返工,由此而产生的额外费用将由乙方承担;同时乙方仍须在合同规定的时间内完成工程。10工程停工:若甲方通知乙方将工程停止,其原因又并非是乙方的责任,乙方可停止工程并要求甲方按照已完成工程的数量、运抵工地的材料及其他合理费用。在已交款中增付或扣除。11工程监护:在工程开始后,但在完工移交前,已完工的工程及留在工地的材料、工具、设备等,均由乙方保管。除人力不能抵抗的灾害外,乙方应对保管中的一切,负损害之全责。如遇不可抵抗的天灾人祸,乙方应详列损害实情,向甲方提出恢复原状的价格及日期。以供甲方核对付款之用。若甲方决定不再继续施工,按合同第10条规定结束。12工程保险:(具体根据分包内容确定)除天灾或因甲方使用不当的原因外,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年数据产品和服务创新形态:核验查询 分析报告 指数 可视化开发规范
- 河南省郑州八中学2026届初三5月大联考(三)化学试题试卷含解析
- 泰安市泰山区重点达标名校2026年初三3月月测生物试题试卷(人教版)含解析
- 2026年绿电制氢耦合生物质气化制绿色甲醇工艺
- 2026年公共数据分级定价机制与国有资产运营管理逻辑衔接
- 2026年虚拟电厂聚合储能资源需求响应收益模式
- 高性能计算技术专家的面试技巧解析
- 外包服务公司项目负责人服务外包策略规划及执行方案
- 2026年广告发布合同效果评估标准
- 汽车零部件销售经理面试全解析
- 小班数学认识数字1-5
- LY/T 1705-2007管氏肿腿蜂人工繁育及应用技术规程
- GB/T 5154-2022镁及镁合金板、带材
- 马工程《刑法学(下册)》教学课件 第17章 危害国家安全罪
- GB 30509-2014车辆及部件识别标记
- 09S304 卫生设备安装图集
- 医学导论-课件
- 细胞生物学CRISPR-CAS9-课件
- 建筑工程项目管理综合练习及答案
- 楼地面装饰工程计量与计价
- 学生预登信息采集表
评论
0/150
提交评论