ICSMetrorail’s initiative to move people smartl……_第1页
ICSMetrorail’s initiative to move people smartl……_第2页
ICSMetrorail’s initiative to move people smartl……_第3页
ICSMetrorail’s initiative to move people smartl……_第4页
ICSMetrorail’s initiative to move people smartl……_第5页
已阅读5页,还剩4页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、05 April 20111. New Rolling Stock Investment Outlook 2. Key Strategic Issues 3. Why focus on Market Engagement Process4. Project Progress to date4. Overall Rolling Stock Programme in the months ahead5. ClosureOverviewNew Rolling Stock Investment OutlookEmbarking on an 18 year programme, with procure

2、ment anticipated to commence in 2012 2030;Totals approximately 8 600 coaches for Metro rail operations (equal 718 new train sets) over the period ahead;Investment of approximately R86 billion over an 18 year period reflecting the capital portion;Some 2 000 new long-distance locomotives/coaches phase

3、d over the same period estimated cost of R11 billion; andPreliminary funding requirement (metro service & long-distance rail service)Estimated = R97 billionWhat are the strategic issues considered in relation to this investment outlookKey consideration Local content target 65%; Technology compat

4、ible to local requirements; Skills (engineers & other related fields) upskilling of the railway engineers; Re-establish the local manufacturing of new train sets stimulate the rail industry; Creation of sustainable job opportunities through this programme both direct and indirect jobs; Long-term

5、 certainty to the industry and financiersWhy focus on Market Engagement Process Alignment with current South African industrial policy requirements; Projects appeal to the market both from manufacturing and financing viewpoint; Minimum demand requirements for the required investment in a rolling sto

6、ck industry; The manufactures ability to supply the quantities of rolling stock required to specifications that suit local requirements; and The financiers ability to provide long-term finance to the rolling stock fleet renewal programmeProgress to date The rolling stock renewal programme already en

7、dorsed by the Minister of Transport; Inter-ministerial team which include the National Department of Transport, National Treasury, Department of Trade and Industry and Department of Public Enterprise was established to oversee the delivery of the programme; Funding for the study has already been fun

8、ded by the National Treasury; A transaction advisor for the project has been appointed; The development of a detailed study for the procurement of new rolling stock has commenced; and Minister of Finance confirmed the new rolling stock investment during the February 2011 budget speechNew Rolling Sto

9、ck Programme in the months aheadNumberDeliverableDue Date1.Development of a detailed study for the procurement of new rolling stock for metro and long-distance rail services15 June 20112.Conduct a market engagement5th 7th April 20113.Conclude the feasibility study2 June 20114.Submission of the study

10、 results to the Shareholder national Department of Transport20 June 20115.Submission of the study results to the National Treasury for budget consideration30 June 20116.Submission of the Cabmemo for considerationJuly 2011New Rolling Stock Programme in the months ahead (cont)7. Finalise the funding arrangements for the programmeMid-February 20118.Issue a Request for Proposals suppliers of the technologyMid-March 20129.Bid evaluation and selection of the preferred bidderEnd-August 201210.Approval of the preferred bidderEnd-September

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论