1、The Channel Tunnel History 1802 1875 1882 Albert Mathieu put forward a cross-Channel tunnel proposal The Channel Tunnel Company Ltd began preliminarypriliminri 初步的初步的 trials The Abbots Cliff heading had reached 897 yards (820 m) and that at Shakespeare Cliff was 2,040 yards (1,870 m) in length Janua
2、ry 1975 February 1986 June 1988 December 1988 A UKFrance government backed scheme that started in 1974 was cancelled The Treaty of Canterbury was signed allowing the project to proceed First tunnelling commenced in France UK TBM commenced operation December 1990 May 1994 June 1994 November 1996 The
3、service tunnel broke through under the Channel The tunnel was formally opened by HM The Queen and President Mitterrand Freightfreit 货运货运 and passenger trains commenced operation A fire in a lorry shuttle severely damaged the tunnel November 2007 September 2008 December 2009 High Speed 1, linking Lon
4、don to the tunnel, opened Another fire in a lorry shuttle severely damaged the tunnel Eurostar trains stranded in the tunnel due to melting snow affecting the trains electrical hardware There have been three fires in the Channel Tunnel that were significant enough to close the tunnelall on the heavy
5、 goods vehicle (HGV) shuttlesand other more minor incidents. During an “invitation only” testing phase阶段阶段 on 9 December 1994, a fire broke out in a Ford Escort car whilsthwailst 当当的时候的时候 its owner had been loading it on to the upper deck of a tourist shuttle. The fire started at approximately 10:00
6、 with the shuttle train stationary in the Folkestone terminal and was extinguishedikstiwi 熄灭熄灭 around 40 minutes later with no passenger injuries. On 18 November 1996, a fire broke out on a heavy goods vehicle shuttle wagon货车货车 in the tunnel but nobody was seriously hurt. The exact cause is unknown,
7、 although it was not a Eurotunnel equipment or rolling stock problem; it may have been due to arson:sn 纵火纵火of a heavy goods vehicle. It is estimated that the heart of the fire reached 1,000 C (1,800 F), with the tunnel severely damaged over 46 metres (151 ft), with some 500 metres (1,640 ft) affecte
8、d to some extent. Full operation recommenced six months after the fire. The tunnel was closed for several hours on 21 August 2006, when a truck on an HGV shuttle train caught fire.On 11 September 2008, a fire occurred in the Channel Tunnel at 13:57 GMT. The incident started on a freight-carrying veh
9、icle train travelling towards France. The event occurred 11 kilometres (6.8 mi) from the French entrance to the tunnel. No one was killed but several people were taken to hospitals suffering from smoke inhalation,inhlein吸入吸入, and minor cuts and bruisesbru:z擦伤;青肿擦伤;青肿.The tunnel was closed to all traffic, with the u
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 减粘裂化装置操作工岗中基础实操考核试卷含答案
- 重冶浸出工岗位学习考核试卷含答案
- 芳香烃衍生物生产工岗位理论综合技能考核试卷含答案
- 家畜饲养员管理综合模拟考核试卷含答案
- 2026年数字化流程高级优化师招聘笔试试卷 招录12人完整版
- 2026年技术转化数字化分析师招聘笔试试卷 招录12人王牌题库
- 2026年吉林省敦化市高三数学下册期末考试模拟卷附完整答案【有一套】
- 2026年云南省楚雄市高三数学下册期末考试模拟卷含答案(黄金题型)
- 2026年吉林省敦化市高三数学下册期末考试模拟试卷(真题汇编)附答案
- 2026年湖北省汉川市高三数学下册期末考试模拟考试卷及答案一套
- 胸痛的鉴别诊断与处理专家讲座
- 2026年国能源招聘笔试真题及答案
- GB/T 24134-2026橡胶和塑料软管静态条件下耐臭氧性能的评价
- 2026年市政水务管理的创新发展
- 深圳龙岗区建筑工务署笔试真题题库(含完整答案解析)
- 露天矿边坡管理培训课件
- 2026年井工煤矿地测防治水专业考试题库及答案
- 2026年交安C证考试模拟考试题库及答案
- 亲子互动短视频爆笑剧本合集
- AQ3026-2026《化工企业设备检修作业安全规范》解读
- 水利水电工程单元工程施工质量检验表与验收表(SLT631.5-2025)
评论
0/150
提交评论