版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、International competition consultation proclaim for the regional development strategy program of east contiguity to the sea in LianyungangLianyungang Program BureauCatalog General situation of the project -2 Time requirement-4 The mode of signing up and qualification requirement-4 Reward mode-5 Prop
2、rietor, organizer and appraisal committee-5 Achivement requirements-6 Contact mode-7 Annex-8Lianyungang locates to the shore of Yellow Sea, which is the orient bridgehead of the new Asia and Europe continent bridge and one of the first class of cities which are open to the outside world. Up to now,
3、Jiangsu province has put forward the strategy of reviving Su Bei (the north part of Jiangsu), which brings up a higher requirement for the future development of Lianyungang City. The area of the east contiguity to the sea is the high light of the recent development in Lianyungang, and the east zone
4、should have high-grade city image, including the platform of port development and industry developmental, top grade seashore tourism, high grade culture and art and high quality ecological environment. Hence, this city needs to create an integration zone involving port development, industry developm
5、ent, tourism, commerce complement, inhabitation and other functions under the guideline of the program. In order to collect more creative program plans and/or development conceptions, under the commission of Lianyungang municipal people's government, Lianyungang Program Bureau has decided to car
6、ry out international competition about the east zone development strategy program, and invite the related program offices (or design units) with program and/or development experience, or building offices (or design units) in earnest to join the competition. Now, the related matters about the interna
7、tional competition are proclaimed as follows: General situation of the project 1 Microscopy background Lianyungang is an important port city in the northern part of Jiangsu province, which is endowed with abundant resources of Mountain and sea. Its Mountains, sea, islands, harbors and towns bring ou
8、t the best with each other, especially its beautiful water and Mountains are just like one integrated mass; Lianyungang has the advantage of good regional trafficking where locates the orient start point of new Asia and Europe bridge, and it is the only seaport in Jiangs. With carrying out the two g
9、rand strategies of the development of east Longhai industry strap and alongshore economy strap in Jiangsu province, Lianyungang will be confronted with new opportunities and challenges in future development. In recent two months, the principal leaders of Provincial Party Committee and provincial gov
10、ernment have visited Lianyungang personally for many times and made some important indications. Hence, how to make full use of the advantage resources of Lianyungang's contiguity to the sea, how to create new logos and new notions, and how to confirm the development strategy of the east contigui
11、ty to the sea in Lianyungang will be the core problems which the program needs to solve. So, it is in urgent need to carry out the study of the development notions, development models, function orientation and entirety space image for the east zone. 2The background introduction of the program area T
12、he east contiguity to the sea area locates the east of Lianyungang City, whose east faces Yellow Sea, west goes as far as front Yuntai Mountain, north links the estuary of the Xiuzhen River, and south reaches the estuary Of Guan river, including Lianyungang city, Ganyu county seat and the major part
13、 of the development zone, whose general programming area is about 1000 square kilometers, including more than 160 kilometers bundline and/or offing sea area. The advantages of zone bit and/or integration trafficking is apparent. The main artery of Longhailan new railway contacts the east and west, a
14、nd it owns the unique alongshore harbor resource in Jiangsu province. In this region, the freeways crisscross, and basically, it has formed an integration trafficking system including railway, aviation, sea transportation and highway. It also has the good condition of industries being based on the h
15、arbor and goods flow industries. The region has a apparent advantage of Mountain and sea, and owns the first-class seashore resources in Jiangsu province, in which there are back Yuntai Mountain, middle Yuntai Mountain, front Yuntai Mountain, Beigu Mountain and some other mountains, whose soil is ab
16、undant, and natural landscape is superior. This region has already possessed the good condition of developing seashore city and seashore tourism. As the most valuable region, the east contiguity to the sea area has the chance of creating a platform for the city development. 3Program objective The pr
17、ogram of this international competition has three objectives: To figure out the orientation and objective of the east zone: it should rethink the development orientation of Lianyungang from the regional strategy, study the opportunities and challenges which the city faces, carry out deep analyses ab
18、out the development conditions, bring up the core development objective for Lianyungang. On the basis of the entirety development objective, it should figure out the function orientation of the east contiguity to the sea area, bring up rational development policy, and make the city activate the deve
19、lopment of the whole area economic to make it become an attractive and competitive seashore area. To bring up entirety spatial arrangement and functional plan: in terms of the urban development objective, firstly, it should bring up City entirety space structure and City integration trafficking syst
20、em program. Secondly, on the basis of the entirety structure, it should bring up the spatial arrangement of east contiguity to the sea area, land use planning, road traffic and/or landscape program, and confirm proper urban construction development scale and development chronology. Thirdly, as for t
21、he key problems affecting the urban development, it should carry out special item argumentation and preliminary scheme, including the bundline appraisal and utilization, harbor layout, industry layout, tourism growth and other programs. To create seashore city image by using the important places: it
22、 should stand out the characteristics of city's Mountain and sea and profound culture details, take the advantage of the development and construction experience home and abroad, carry out deep design for the shape of the important places in the city, and create a city image being rich in attract
23、ion. The important places include: the new town of contiguity to the sea and estuary district of the Guan River, among which the new town includes standard port zone, Lianyungang urban area and the major area of the development region, whose area is about 147 square kilometers. The new town of conti
24、guity to the sea is the core area of the future city. It should carry out important study for its characteristics and spatial configuration, and stand out seashore city's fascination; the estuary district of Guan river is the new harbor location and industry zone, and it will take the responsibi
25、lity for the ideal of urban economy span development, hence, on the basis of the entirety layout, it should deepen and refine the plan, and stand out the city's image with modern harbor, industry zone and goods flow zone. 4The other situations The related detailed information and related program
26、 (see annex one and four) Time requirements Time for signing up: July 28th, 2005- August 7th, 2005. The concrete consultation matters concerned can be seen at the web of Lianyungang program bureau. http:/ The time for project design of the participants is prearranged initially from the middle ten da
27、ys of August to the first ten days of October, which lasts seven weeks. The detailed schedule will be issued to the formal participant offices (or design units) in the competition issue meeting held on the middle ten days of August. The mode and qualification requirement for signing up 1The mode for
28、 signing up If any offices (or design units) would like to accept the invitation, they should revert this consultation letter through courier, fax or E-mail, before August 7th, 2005, and the reverting time should be referred to in terms of the time of the courier's indicia or fax and E-Mail'
29、s received time ( Peking time). Your reverting letter has to include the following items: (1) The confirmation letter of accepting invitation (Chinese version) (2) To fill in the prequalification application form (Chinese version)(3) The related writing collection and/or corporation introduction(4)
30、The related information introduction of the doyen designer After the deadline of signing up, our bureau will organize special qualification evaluation committee to precheck the design units, pick out six units to attend the design competition formally, and send our invitation cards to them. The unit
31、s which fail to be picked out will not be notified. As for the confirmation letter and prequalification application form, you can see annex two and three. Notices: If your party wants to collaborate with other corporations, the collaborating corporations have to submit the related data what the item
32、 two and three state, and write down the main design party in the confirmation letter. In order to facilitate consolidation arrangement, we will just contact the main design party about the related affairs during the competition. If you want to know the related contents of the competition activity f
33、urther to confirm whether you want to sign up or not, please contact us in time. That any cooperation (unit) sends out confirmation letter will mean that you would like to join the consultation activity, and then your party will be absorbed into the design guild credit evaluation system in Lianyunga
34、ng City. Once we confirm the participant units, while because of some reasons, your party can not join the competition, please inform us within three days after receiving the formal invitation card. If your party does not inform us in the designated time, or quits during the competition without any
35、reason, in result, it will be likely to cause bad influence on the credit evaluation of your party. 2The requirements for the competition units qualification (1) The participant units must have definite international reputation. (2) If the inland project organization is asked to collaborate, it must
36、 have the planning and design grade A aptitude. (3) The main participant units are required to have sufficient experiences as followings: S.E. Asia area urban planning design The seashore urban area program and/or urban design The seashore area tourism planning and development research Harbor, goods
37、 flow, transportation planning design Reward mode Every design unit being invited formally to join the international competition will be given eighty thousand dollars as arrangement fee. In addition, the competition will choose out one first prize plan with bonus of eighty thousand dollars more thro
38、ugh public appraisal, and choose out one second class prize plan with bonus of forty thousand dollars. The above rewards all include toll. Proprietor, organizer and appraisal committee 1Proprietor and organizer Proprietor: Lianyungang municipal people's government Lianyungang Program Bureau 2The
39、 members of appraisal committee The commentators who participate in evaluating the formal competition plans will be made up of the senior experts with international specialty background in every field of the program. In order to guarantee equity, the proprietor and/or organizer will not impose any i
40、nfluence on the body of experts during the evaluation period. The expert list will not be given out before the accomplishment of the competition. The members of the body of experts (Total 11)Urban planning and urban design 6Industry economy 1Tourism planning and landscape design 2The trafficking exp
41、ert of harbor goods flow 2 Achivement requirements: The enlisted plans' documents of this international competition should include the following three parts: 1Program study specification; The survey of base values and the analytical study of current situations The study of entirety development s
42、trategy and development chronology The statement of the entirety logos and principal program thoughts The subsystem special item study The integration statement of the important area's conceptual design The related advice of carrying out the policy and procedure, and the corresponding technical economic index 2program drawing paper; The space structure drawing of the city and town The integration traffick
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年重点新材料首批次应用综合保险投保操作手册
- 2026年保持高压态势不断提高反腐败穿透力实施路径
- 京津冀首届航空职业技能大赛报名表(学生组)
- 2026年多元主体协作共治模式管理者教师学生共同参与决策
- 2026年蚂蚁阿福等AI医疗模型C端商业化空间与运营模式
- 2026年老年人能力评估确定居家适老化改造需求操作流程
- 2025年临床执业医师《妇产科学》考核卷
- 红色正月十五闹元宵节日活动策划
- 京东物流运营年度总结报告
- 建筑企业工程部专员的工作计划
- 湖南信息学院《数据结构与算法Ⅱ》2024-2025学年第一学期期末试卷
- 牛场消毒技术应用
- 学校中考备考汇报
- 医院精麻药品规范化管理培训
- 2025年安徽省公务员考试(军事知识)经典试题及答案
- 医保内控管理办法
- 2026年中考语文一轮专题复习:复习背诵手册
- (高清版)DBJ∕T 13-318-2025 《建筑施工盘扣式钢管脚手架安全技术标准》
- 《焦作市第十二届技能大赛-9.2无人机装调检修工赛项技术文件》
- 围手术期应激性高血糖护理
- 太阳能光伏板回收利用项目(年拆解光伏组件50000吨)环评报告表
评论
0/150
提交评论