1、建筑装饰工程施工合同示范文本页脚内容6Contract for Decoration ProjectParty A (full name):Party B (full name):This Contract is concluded on the basis of the project details by and between the foresaid Party A and Party B in accordance with Contract Law of People s Republic of China and Construction Engineering Contract
2、 Regulations1. Overview1.1 Project name:1.2 Project site:1.3 Project content:1.4 Means of contract:1.5 Construction Period is from date of commence of , to completion date of1.6 Quality standard:1.7 Contract price:2. Party A s Responsibilities2.1 Party A shall providecopy of confirmed construction d
3、rawings or instructions toParty BDays prior to the date of commence, clear up all or parts of the buildings, andremove barriers. Party A will take protective measures for the remaining furniture and furnishings. Party A also needs to provide water, electricity, gas and telecommunications, and indica
4、te matters needing attention to Party B. Party A will be responsible for going through all the applications and approval procedures related to the project.2.2 Party A assigns to be the representative. He will be responsible for the supervision and control over the project, and handle the acceptance,
5、 alteration, registration formalities.2.3 Party A entrustswith the construction supervision of this project. Thesupervision company appoints to be the general supervision engineer, clarifiesParty B.his responsibilities in the supervision contract, and submitscopy of the contract to2.4 Party A shall
6、be responsible for protecting the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged, and bear corresponding costs.2.5 If it is really necessary to change the original building structure or pipelines, Party A shall be responsible for going through the correspondin
7、g approval procedures.2.6 Party A will coordinate with relevant departments to do on-site security, fire protection, waste disposal, etc., and bear the corresponding costs.3. Party B s Responsibilities3.1 Party B must be available to attend meetings organized by Party A and prepare construction plan
8、 and schedule.3.2 Party B assigns as the site resident representative. He will be responsible for construction organization and completion of the project with good quality.3.3 Party B shall strictly implement the construction specifications, safety operation procedures, fire safety regulations, and
9、environmental protection regulations. It must strictly execute construction abiding by construction drawings or practice instructions, and complete the quality inspection record. Party B must participate in the final completion acceptance, and prepare the project settlement.3.4 Party B must abide by
10、 the provisions on the management of the construction sites by the national or local government and related departments, protect the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged. Party B also need to do a good job in such things as the construction site secu
11、rity and garbage disposal, and deal well with the issue of disturbing residents brought about by construction.3.5 Without Party As consent or approval of relevant departments, Party B shall not make any unauthorized changes to original building structure or pipelines.3.6 Party B shall be responsible
12、 for protecting all the facilities and finished projects before the project is handed over to Party A.4. Construction Period4.1 When Party A needs to complete the project ahead of the time limit, it should obtain Party Bs agreement and pay the cost for the measures that Party B takes to crash the sc
13、hedule.4.2 If the project progress is influenced by the delay of Party As delivery date, the practically impacted cycle extends accordingly.4.3 If the project can not be started on time or shutdown halfway for no reason because of Party Bs responsibility, the practically impacted cycle can not exten
14、d accordingly.4.4 The project duration shall be prolonged when the downtime is over eight hours (accumulated in one week) caused by the power failure, water failure,qas stop and force majeure factors because of design changes or reasons not related to Party B.5. Quality Standard and Acceptance Inspe
15、ction5.1 This project takes construction drawings, instructions, design changes and national construction and acceptance specifications such as Construction and Acceptance Standards of Decoration Engineering (JGJ73-91 )Unified Quality Inspection and Assessment of Architectural Installation Work (GBJ
16、300-88) as quality assessment and acceptance standards.5.2 Quality of the project should meet the acceptance criterion of national quality assessment. If all or parts of the project reach to the excellent standard, Party A will pay to Party B increased costs.5.3 Party A and Party B shall promptly ha
17、ndle the concealed work inspection procedures of pre-acceptance in the middle of the project. If Party A do not organize covert acceptance in time, Party B can make self-inspection and Party A shall admit the result. If Party A requires the re-inspection, Party B shall be in accordance with the requ
18、irements lor the re-inspection. If the re-inspection result is acceptable, Party A shall bear the re-inspection fee and the project duration can be extended accordingly; if re-inspection result is not acceptable, the re-inspection and reworking costs shall be borne by Party B, and the project durati
19、on shall also be extended accordingly.5.4 If materials provided by Party A for the construction do not meet the necessary requirements, Party A shall bear responsibility for any resulting delays in the completion of the project.5.6 When the Project is ready for final acceptance, Party B shall submit
20、 to Party A thefull as-built documentations and completion acceptance report. Party A shall organizethe acceptance within 5 day after receiving all the documents. When Party A can not5.5 If the quality of Party Bs work results in any accidents, liability for such accidents shall be borne by Party B.
21、conduct the acceptance within the time specified in the Contract, Party A shall inform Party B without delay and determine another date for the acceptance. Party A, however, shall admit the completion date of the Decoration Project and be liable for the expenses for taking care of the construction b
22、y Party B and other relevant expenses.6. Contract Prices & Settlement6.1 The Parties agree to determine the contract price pursuant to mode below:(1) Fixed price(2) Fixed price, combined with _/% risk rate (including/)(3) Adjustable price: make adjustments and settlement according to relevant state
23、regulations6.2 Party A shall makepayments after the Contract comes into effect. Finalpayment will be made after completion of the project.Timing of PaymentsPayment ProportionAmount6.3 After final acceptance of construction, Party B will make the engineering settlement and transfer the relevant docum
24、ents to Party A. Party A shall complete reviewing of the documents within / days. Where Party A fails to raise an objection, its consent shall be deemed to have been given. The final payment shall be made within / _ days.7. Material supplies7.1 Party A is in charge of purchasing the supplied materia
25、ls and equipments (refer to Annex). The materials shall be qualified and meet the design requirements, and be delivered to the scene in time. If Party B is responsible for picking up the materials, Party A shall hand over delivery documents to Party B and let Party B bear the transportation expense.
26、 Party A shall be responsible for the damages to the project caused by quality problems or specification differences of the materials and equipment supplied by Party A. Party B is responsible for storage of materials provided by Party A, and Party A shall pay / % of the material value as the storage
27、 fee. Party B shall be responsible for the compensation associated with the loss caused by improper storage of Party B.7.2 Materials provided by Party B: Any materials or equipment supplied by Party B whic h do not meet the design and construction requirements are prohibited. If the materials have b
28、een used, the loss caused shall be assumed by Party B.8. Safe Production and Fire Regulations8.1 Construction drawings provided by Party A or practice that should comply with the fire regulations of the Peoples Republic of China and the relevant fire safety rules.8.2 Party B should strictly abide by
29、 Engineering Safety Technical Regulations for Construction and Installation, Safety Operation Proceduresi Fire Control Regulation and other relevant laws and regulations.8.3 Party A shall bear all the resulting economic losses if the drawings or instructions violate the safety operating rules, fire
30、control and fire prevention design specifications.8.4 Party B shall bear all the resulting economic losses if its construction process violates the safety operating rules, fire control and fire prevention design specifications.9. Rewards and Liabilities for Breach of the Contract9.1 If Party A cause
31、s any delays to the completion of this project, then Party A must pay to Party B for each day beyond the scheduled completion date. A fine ofwill be imposed in respect of each day that the payment is overdue.9.2 If Party B causes any delays to the completion of this project, then Party B must pay to
32、 Party A for each day beyond the scheduled completion date. If theproject needs to be completed ahead of the time limit, a reward of will beprovided by Party A in respect of each day before the scheduled completion date.9.3 If all or parts of the project reach to the excellent standard, Party A will
33、 pay to Party B as a reward.9.4 Party B shall protect the equipments provided by Party A, furniture, furnishings and finished products placed on site. If losses are caused, Party B shall bear the compensation responsibility.9.5 If Party A instructs Party B to make any alterations to a load bearing w
34、all and Party A has not sought and received permission from the building property management, Party A shall be responsible for any resulting costs and shall indemnify Party B for any additional expenses incurred.9.6 If Party B makes any unauthorized changes to load bearing walls or building pipeline
35、s and such changes result in damages or loss, it shall be the responsibility of Party B to pay for such loss.9.7 Party A shall be responsible for any extra costs incurred due to his use of the property before the final completion meeting and signing of the “ EngineeringQuality Acceptance ” document.9.8 If a party suspends its performance, it shall timely notify the other party and be liable for all losses thus incurred to the other party.10. Deputes10.1 If there is any dispute between the two parties, the parties should solve through negotiation o
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 管理心理学与组织效率的联系试题及答案
- 行政管理中的技术与人文结合探索及试题及答案
- 公共关系与舆情监测技术试题及答案
- 创新型农林经管人才培养的实践经验
- 2025年自动驾驶卡车在危化品运输中的安全性能评估报告
- 工程经济技术创新试题及答案
- 安徽xx新能源储能项目实施方案
- 水利水电工程从业人员职业道德与试题及答案
- 2025年制造业数据治理策略下的数据治理团队建设与人才培养报告
- 2025年土壤污染修复技术在土壤污染修复行业发展趋势中的应用效果报告
- 门市房转租合同
- 《工艺标准培训》课件
- 2024年度高速公路监控系统维护承包合同
- 2021年修订版《中华人民共和国安全生产法》考试题库
- 《广播电视与通信》课件
- 新能源汽车运用与维修专业人才培养方案
- 2024北京初三(上)期末语文汇编:议论文阅读
- 英语俚语课件教学课件
- 悬崖村课件教学课件
- 船舶结构节点图
- 小学数学《分数除法》50道计算题包含答案
评论
0/150
提交评论