




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、TruckTire Building Machine SAV Carcass building 1. Manually hanging the bead core into the carcass transfer system.2. Semiautomatic application of the inner liner sidewall assembly (precutto length on the carcass drum.3. Semiautomatic application of one or two bead reinforcement pairs.4. Semiautomat
2、ic application of the steel cord ply (pre-cutto length.5. Splicing the steel cord ply with the motor splicer (zipper.6. Automatic application of the shoulder cushion (pre-cutto length with manual splice adjustment. 7. Automatic carcass stitching.Belt building8. Manually loading the tread servicer.9.
3、 Automatic application of four different beltplies (pre-cutto length with splice adjustment. 10. Semiautomatic application of belt edge filler strips. (optional11. Automatic application of tread with spliceadjustment. Shaping12. Automatic transfer of carcass to shaping drum. 13. Automatic transfer o
4、f belt tread assembly toshaping head.14. Automatic shaping of carcass.15. Automatic stitching of tread-belt assembly. 16. Automatic turning up of sidewall.17. Automatic stitching of complete green tire. 18. Automatic removal of finished green tires fromthe shaping head.Carcass machine Carcass servic
5、er Belt/shapingmachine Belt ply servicerBelt edge filler strip servicer Tread servicer Transfer system Stitching systems ControlsTechnical Data Tire bead diameter 19.5 - 24.5 Inner liner sidewall width 520 - 1450 mm Bead reinforcement width 25 - 200 mm Steel cord ply width 500 - 950 mm Shoulder cush
6、ion strip width 30 - 155 mm Shoulder cushion plate width 200 - 390 mm Bead core spacing min./max. 420 - 850 mm Belt width 90 - 320 mm Belt edge filler width 30 - 60 mm Belt drum diameter 720 - 1100 mm Max. tread width 375 mm Max. tire diameter 1130 mm Cycle time per tire 140 - 170 s * Technical fail
7、ure rate 2.5% (in accordance with VDI 3423 guidelines Conversion time for size approx. 15 - 45 min. * changes Manpower requirements 2 machine operators Space required 13000 x 16800 x 3700 mm (L x D x H (excl. switch cabinets Power Data Electrical Data Line voltage/frequency: Fuse protection: Connect
8、ing power: Pneumatical Data System pressure (dried air: 0.8 MPa (8 bar Vacuum: 0.4 bar (60% Consumption per tire: approx. 0.01 m3 (norm 3 x 400 V / 50 Hz 3 x 160 A 55 kVA Depends on the tire design and, if using the basic machine, on perfect materials as well as operators trained according to Contin
9、ental standards. * Within a one inch range, with prepared replacement tools and trained operating staff, and depending on the number of tire components concerned. * Continental AG CM Conti Machinery Hannover - Germany Jdekamp 30 D - 30419 Hannover - Germany Phone: +49 511 976-6780 Fax: +49 511 976-6086 CM Conti Machinery Pchov - Slovak R
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年地热能源供暖设备研发与创新趋势研究报告
- 农村电商服务站农村电商市场潜力与政策环境分析研究报告
- 医疗健康领域中员工压力管理技巧
- 强化网络安全保障数字化工作场所的隐私权
- 从办公室到云端办公室企业如何进行数字化转型
- 企业创新力提升的知识管理策略优化探讨
- 医疗信息系统的安全性与资源优化策略
- 老旧小区改造项目建设周期与关键节点安排
- 农村电商服务站数字化转型:2025年运营模式创新研究
- 2025年家庭教育指导服务市场细分领域需求与增长潜力研究报告
- 2025年中国光纤市场现状分析及前景预测报告
- 2025年邮轮旅游市场深度分析报告:产业现状与未来趋势预测
- 2025届四川省成都市高三毕业班第三次诊断性考试英语试卷读后续写-笛子失而复得的故事+讲义
- 2025年四川省成都市锦江区中考二诊物理试题(含答案)
- 储能产业研究白皮书2025摘要版
- 曲靖市社区工作者招聘真题2024
- 2024年新疆阿合奇县事业单位公开招聘村务工作者笔试题带答案
- 2025年浙江省杭州市西湖区中考数学一模试卷
- 2025年中国ARM云手机行业市场运行格局及投资前景预测分析报告
- 基层应急管理能力提升与建设
- 小学生脱口秀课件
评论
0/150
提交评论