1、 Lesson 1 Emerging Role of Management in Civil Engineering 1. Why are managerial skills highly demanded in civil engineering? Because civil engineering firms have grown substantially in staff size, disciplines, and geographic areas served, so these conditions have created a demand for civil engineer
2、s with special skills in project management. 2. What are the main subjects one should learn in order to get MPM (Masters in Project Management)? It includes subjects as: 1. Financial issues for engineers 2. Bargaining and negotiations 3. Human resources management 4. Project scheduling 5. Accounting
3、 issues for engineers 6. Engineering law 3. Why is it necessary to provide a local manager? What kind of qualities should he possess? When the projects are based in remote locations, particularly overseas, and when the client requires the design to be carried out locally, it becomes necessary to pro
4、vide a project manager possessing not only well-honed engineering skills and good judgment, but other skills in contract management, such as those needed to negotiate changes in project scope and duration .Lesson 2 The Construction IndustryWhat is construction? Why is the construction of projects so
5、 complicated?Construction is essentially a service industry, whose responsibility is to convert the plans and specifications prepared by an engineer or an architect into a finished project.The construction of projects involves thousands of details and complex interrelationships among owners, archite
6、cts, engineers, general contractors, speciality contractors, manufacturers, material dealers, equipment distributors, governmental bodies and agencies, labor, and others What should designers and constructors do in order to cooperate with each other harmoniously?The designer must be in close contact
7、 with everything that is done during the construction work so that any changes in the site conditions, materials and work being done can be evaluated and, if necessary, corrected or improved. The constructors should have the same knowledge of the working-plan as the designer. They must also know the
8、 details of the design and must understand any unusual aspect of the design. Both the designers and constructors must always work in harmony.Give a brief analysis of the five steps of construction.The first stage of evaluation consists of a careful study of demand of design and of the site itself. T
9、he second stage is most important if the job is to be done economically. The equipment, labor and materials for each stage in the construction must be provided at the correct time.The third includes constructing access roads, making the warehouse, concrete mixers, offices and housing for the workmen
10、 ready.The fourth is building the structure and the fifth is cleaning up.Unit 2 Building Types and MaterialsLesson 3 Building Types 1.What are industrial buildings and civil buildings? Industrial buildings are used by various factories or industrial production while civil buildings are those that ar
11、e used by people for dwelling, employment, education and other social activities. 2. What are peoples requirements today for housing besides shelters? Why? people today require much more than this of their housing. A family moving into a new neighborhood will want to know if the available housing me
12、ets its standards of safety, health, and comfort. A family will also ask how near the housing is to grain shops, food markets, schools, stores, the library, a movie theater, and the community center. 3. What is the modern trend of industrial buildings? The modern trend is towards light, airy factory
13、 buildings with the offices, reception rooms, telephone exchange, etc., house in one low building overlooking the access road, the workshop, also light and airy, being less accessible to public view .Lesson 4 Material Procurement and Delivery 1. According to the text, what is the broad classificatio
14、n of material for delivery? The materials for delivery to and from a construction site may be broadly classified as: (1) bulk materials, (2) standard off-the-shelf materials, and (3) fabricated members or units. 2. Describe in detail how to simplify field assembly. Fabricated members such as steel b
15、eams and columns for buildings are pre-processed in a shop to simplify the field erection procedures. Welded or bolted connections are attached partially to the members which are cut to precise dimensions for adequate fit. Similarly, steel tanks and pressure vessels are often partly or fully fabrica
16、ted before shipping to the field. 3. What should be taken into consideration when it comes to the time for equipment procurement? Requisition ready by designerOwner approvalInquiry issued to vendorsVendor quotations receivedComplete bid evaluation by designerOwner approvalPlace purchase orderReceive
17、 preliminary shop drawingsReceive final design drawingsFabrication and delivery Unit 3Construction TechnologyLesson 5 Surveying and Mapping1.How can you survey an area of land? An area of land without hill or many buildings can be accurately surveyed with nothing but a good steel tape, but this is h
18、ard work when the land has more sides than four, or when its sides are longer than 1,000 meters. A small area with many hindrances to the lines of sight across it can not be exactly surveyed with a tape, and an instrument that measures angles will then be needed. 2.In what way can you get the length
19、 of the unmeasured sides? With a theodolite, it is possible to get the lengths of the unmeasured sides from the known angles of the triangle and measured side. 3.How do you use a tachometer? The tacheometer is often used with the plane table. It is an ordinary theodolite with two horizontal hair lin
20、es in the telescope which are at such a distance apart that they subtend at a100 meters a length of 1 meter. Lesson 6 Earthwork1.What does earthmoving mean? How can the earthwork costs be reduced?Earthwork or earthmoving means cutting into ground where its surface is too high (cuts), and dumping the
21、 earth in other places where the surface is too low (fills). To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts and wherever possible the cuts should be placed near to fills of equal volume so as to reduce transport and double handling of the fill. 2.What ar
22、e the respective advantages and disadvantages of draglines, bulldozers and face shovels? Draglines, bulldozers and face shovels can do this. The largest radius is obtained with the draglines, and the largest tonnage of earth is moved by the bulldozer, though only over short distances. The disadvanta
23、ges of the dragline are that it must dig below itself, it cannot dig with force into compacted material, it cannot dig on steep slopes, and its dumping and digging are not accurate. 3.What is the distinction between dumpers and dump trucks? The distinction between dumpers and dump trucks must be rem
24、embered. Dumpers tip forwards and the driver sits behind the load. Dump trucks are heavy, strengthened tipping lorries, the driver travels in front of the load and the load is dumped behind him, so they are sometimes called rear-dump trucks.Unit 4Project Management1.What is project management and ho
25、w is it accomplished?Project management is the application of knowledge, skills, tools and techniques to project activities to meet project requirements. Project management is accomplished through the application and integration of the project management processes of initiating, planning, executing,
26、 monitoring and controlling, and closing. The project manager is the person responsible for accomplishing the project objectives. 2.What are the points included in managing a project? Managing a project includes: Identifying requirements Establishing clear and achievable objectives Balancing the com
27、peting demands for quality, scope, time and cost Adapting the specifications, plans, and approach to the different concerns and expectations of the various stakeholders. 3.How do you understand the first sentence of the last paragraph? The term “project management” is sometimes used to describe an o
28、rganizational or managerial approach to the management of projects and some ongoing operations, which can be redefined as projects, that is also referred to as “management by projects.” An organization that adopts this approach defines its activities as projects in a way that is consistent with the
29、definition of a project . Lesson 8 The Project Life Cycle1.What is a project life cycle and what is the function of its definition?Managers or the organization can divide projects into phases to provide better management control with appropriate links to the ongoing operations of the performing orga
30、nization. Collectively, these phases are known as the project life cycle. 2.When does fast tracking happen? It is not uncommon for a phase to begin prior to the approval of the previous phases deliverables, when the risks involved are deemed acceptable. This practice of overlapping phases, normally
31、done in sequence, is an example of the application of the schedule compression technique called fast tracking. 3.What kind of problems should a project life cycle generally define? What technical work to do in each phase (for example, in which phase should the architects work be performed?)?When the
32、 deliverables are to be generated in each phase and how each deliverable is reviewed, verified, and validated? Who is involved in each phase (for example, concurrent engineering requires that the implementers be involved with requirements and design)? How to control and approve each phase? 4.Are the
33、 life cycles of different projects identical? Why or why not?Although many project life cycles have similar phase names with similar deliverables, few life cycles are identical. Some can have four or five phases, but others may have nine or more. Unit 5Scheduling ProcedureLesson 9 Construction Proje
34、ct Planning1.Describe the functions and characteristics of bar chart. In addition to showing an estimated start and finish time for each activity, the bar chart provides for calculating the time at which various resources are needed for the project plan and provides the contractor with a means of re
35、cording the actual work progress of the project activities Its characters are visual effectiveness and simplicity . 2.Make a comparison between bar charts and network models. A network is a diagrammatic representation of the projects activities. Whereas the bar chart is restricted in its ability to
36、identify the complex interrelationships which exist between project activities and in its ability to indicate optimal activity timing, calculations may be made by means of the network which indicates optimal activity timing decisions. As a result, the network model has become a widely used project p
37、lanning tool. 3.Give a brief description of arrow notion and circle notation. An arrow-notation network is constructed by using arrows to represent activities. The relation, or logic, between activities is represented by connecting the arrows by means of circles (often referred to as network nodes).
38、 The nodes represent events which are points in time. A circle-notation network may also be constructed to represent the logic between a projects activities. In the circle notation network, an activity is represented by a circle. The logic between the activity circles is shown by connecting the circ
39、les with arrows. As in the arrow notation network, the actual length of the arrow is of no significance. 4. What are the respective advantages of arrow nation and circle notion? Arrow notation has the advantage of providing a better visual representation of the activity logic than the circle-notatio
40、n network. When activity logic becomes complex, it becomes difficult to visually follow in circle-notation network. Another advantage of the arrow-notation network is that it is relatively easy to transform the network into a tie scale. The circle-notation network has the advantage of being easier t
41、o construct than the arrow-notation network. There is no need for the use of the dummy activity. The circle-notation network is especially advantageous when changes in the activity logic must be made .Lesson10 Relevance of Construction Schedules 1. Why is project scheduling so important? Good schedu
42、ling can eliminate problems due to production bottlenecks, facilitate the timely procurement of necessary materials, and otherwise insure the completion of a project as soon as possible. In contrast, poor scheduling can result in considerable waste as laborers and equipment wait for the availability
43、 of needed resources or the completion of preceding tasks. Delays in the completion of an entire project due to poor scheduling can also create havoc for owners who are eager to start using the constructed facilities. 2. What are the different attitudes toward formal scheduling of a project? Attitud
44、es toward the formal scheduling of projects are often extreme. Many owners require detailed construction schedules to be submitted by contractors as a means of monitoring the work progress. In contrast to these instances of reliance upon formal schedules, many field supervisors disdain and dislike f
45、ormal scheduling procedures. In particular, the critical path method of scheduling is commonly required by owners and has been taught in universities for over two decades, but is often regarded in the field as irrelevant to actual operations and a time consuming distraction. 3. State the basic disti
46、nction that exists between resource oriented and time oriented scheduling techniques. A basic distinction exists between resource oriented and time oriented scheduling techniques. For resource oriented scheduling, the focus is on using and scheduling particular resources in an effective fashion .Uni
47、t 6Construction QualityLesson 11Quality Control and Quality Assurance1.How do you understand the term quality control? Give examples.Quality control assures the reliability of performance of the designed system in accordance with assumed and expected reserve strengths in the design. A quality assura
48、nce system needs to be provided based on the exercise of quality control at various phases and interacting parameters of a total system 2.What are the activities that may influence the final quality of a concrete structure? 1. Based on clearly defined fundamental requirements that satisfy the operat
49、ional, environmental, and boundary conditions set for the project at the outset. 2. Properly presented in accurate, well-dimensioned engineering working drawings based on optimal design procedures. 3. Correctly and effectively carried out by competent personnel in accordance with predetermined plans
50、 and working drawings well supervised during the design stage. 4. Systematically executed in accordance with detailed specifications that conform to the applicable code and local regulations. 3. What factors may affect the quality of the finished product? As previous sections of this book have discu
51、ssed, many other factors affect the quality of the finished product such as water/cement ratio, cement content, creep and shrinkage characteristics, freeze and thaw properties, and other durability aspects and conditions.Lesson 12 Construction Quality 1. What is construction quality? The constructio
52、n industry often defines quality as conformance to standards and specifications. A short-term goal for the contractor is to meet contract requirements. 2. Why is quality an important aspect of construction project? A contractors quality performance has long-term implications, with a contractors repu
53、tation being partly based on the quality of the firms previous projects. Productivity is also directly related to the quality of the contractors work. The quality of a completed project is often used to measure the quality of a contractor. 3. Can you summarize briefly how to implement a quality plan
54、? Using this as a starting point, specific areas of improvement or goals can be defined. A quality or continuous improvement committee should be formed to meet on a regular basis to brainstorm, discuss, make recommendation for, follow up on ideas implemented, and provide incentives for employees who
55、 make the suggestions Presentations must have clear definition of the area of improvement, the possible outcomes, cost of implantation, and a measurable cost savings or changes that will occur from the improvement. A documental record of the meeting should be kept. If implemented, the committee is r
56、esponsible for tracking and measuring the results. Results should be published, and individuals who originated the ideas should be rewarded.Unit 7 Cost Estimate and Cost Control Lesson 13 Cost Estimate What are the definition and purpose of cost estimation?To estimate is to produce a statement of th
57、e approximate quantity of material, time, or cost to perform construction. This statement of quantity is called an estimate. Its purpose is to provide information to construction decisions. How can we make an estimation of a detailed level?Estimating takes time, which is expensive, and one should sp
58、end it only on detail that is relevant to decisions. Relevancy is based on two criteria: (1) if a particular level of uncertainty is acceptable in making a decision, the level of detail that provides this level of uncertainty is acceptable; and (2) the effect of the level of detail on accuracy of th
59、e estimate should be reasonably uniform for all components of the estimate. What should be paid attention to in the preparation of a document of estimate?It must be in a form that can be understood, checked, verified, and corrected. This requires that the source of each number be readily apparent no
60、t only to the person who prepares to estimate but also to others who follow. Conditions that were assumed must be identified. Methods of construction, equipment spreads, and crew that were selected in the estimating process must be stated, if they are not obvious. The estimate should be organized to
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 信息技术支持下的教师专业发展研究立项报告样本
- 某航空制造厂质量检验办法
- 麻纺厂物料管理实施准则
- 2026年国家文物局公务员面试技巧与注意事项
- 2026年农作物秸秆综合利用知识竞赛
- 2026年备考中国烟草招聘笔试的五大误区与应对
- 2026年环保法规知识考核题库
- 体育产业2026年教练员招聘面试技巧与答案
- 2026年医药公司医学信息专员招聘笔试试题
- 2026年充电网络运营公司财务总监面试题及答案解析
- 网络维护外包合同
- 国投集团招聘试题
- 2023年北京重点校初二(下)期中数学试卷汇编:一次函数章节综合2
- 材料研究方法课件
- 直播间选品策略
- 《银行保险机构公司治理准则》解读
- 2023玻纤增强聚氨酯门窗工程技术规程
- 工业产品生产企业质量安全考试试题
- 胶粉聚苯颗粒外墙保温技术交底
- YS/T 429.2-2012铝幕墙板第2部分:有机聚合物喷涂铝单板
- JJF 1069-2012法定计量检定机构考核规范
评论
0/150
提交评论