1、Aktogay Copper ProjectConstruction Healthy and Safety PlanENVIRONMENTAL MANAGEMENT PLAN11373-DB-NFC-0000-PLN-OOO-N-0002121/10/2014IFR Chen JianXu XuYang Guojun012/10/2014IFR Chen JianXu XuYang GuojunREV #DATEREASONORIGINATOR CHECKEDAPPROVED修正变更通知表RevisionLocation of changesDescription of changeChang

2、ed by (Name)版次变更位置变更说明变更人(姓名)TABLE OF CONTENTS目录1.INTRODUCTION1211.1PURPOSE1211.2SCOPE1211.3DISTRIBUTION AND INTENTED AUDIENCE1221.4DEFINITIONS, ACRONYMS AND ABBREVIATIONS1221.4.1GENERAL DEFINITIONS1221.5REFERENCE DOCUMENTS AND LINKS1222.ROLES AND RESPONSIBILITIES1233.GENERAL REQUIREMENTS1243.1Envir

3、onmental Management1243.1.1Environmental Policy1243.2Environmental Objectives for the Construction Phase1253.3Environmental Management System (EMP)1253.2Environmental Management1263.2.1Identification of Legal and Other Requirements1273.2.2Identification of Environmental Aspects1273.2.3Establishment

4、of Environmental Plans and Procedures1273.2.4Environmental Permits1273.3General Environmental Requirements and Procedures1283.3.1Waste Management1283.3.2Dust Control1293.3.3Handling of Fuels, Lube Oils and Chemicals1293.3.4Sewage and Wastewater1303.3.5Vegetation and Topsoil1303.3.6Groundwater1303.3.

5、7Noise Control1313.3.8Housekeeping and Tidiness1313.3.9Traffic Planning and Control1313.3.10Archaeological Artifacts1323.3.11Emergency Preparedness1323.3.12Control and Monitoring1323.3.13Information, Training1333.3.14Reporting1333.3.15Communication with the Community and Other Stakeholders1331.引言121

6、1.1目的1211.2范围1211.3发行及目标对象1221.4定义、首字母缩略词及缩略语1221.4.1一般定义1221.5参考文件与链接1222.职务与职责1233.一般要求1243.1环境管理1243.1.1环境方针1243.2建设阶段的环境目标1253.3环境管理体系(EMS)1253.2环境管理1263.2.1确认法律及其他要求1273.2.2确定环境因素1273.2.3建立环境计划及程序1273.2.4环境许可1273.3一般环境要求及程序1283.3.1废物管理1283.3.2防尘1293.3.3燃料、润滑油及化学品的处理1293.3.4污水及废水1303.3.5植被及表层土13

7、03.3.6地下水1303.3.7噪声控制1313.3.8文明施工1313.3.9交通规划及控制1313.3.10考古文物1323.3.11应急准备1323.3.12控制及监控1323.3.13信息及训练1333.3.14报告1333.3.15与社区及其他利益相关者进行沟通1331.INTRODUCTION1.引言1.1PURPOSE1.1目的The purpose of this Environmental Management Plan (EMP) is to:本环境管理计划(EMP)旨在:define the main legal basis for the NFC Copper Pro

8、ject related to environmental matters during construction;明确建设期间NFC铜矿项目环境问题相关的主要法律依据;define NFCs main environmental objectives related to the construction phase;明确NFC建设阶段相关的主要环境目标;describe the NFC Copper Project management system with respect to environmental matters including lines of responsibilit

9、y and lines of communication;说明NFC铜矿项目与环境问题相关的管理体系,包括责任与通信结构线路;define NFC requirements to contractors environmental management systems, planning and implementation;明确NFC对于承包商环境管理体系、规划以及实施的要求;define NFC requirements to emergency response procedures related to spills and other environmental accidents;

10、明确NFC对泄漏事故及其他环境事故相关之应急响应程序的要求;define NFC requirements to environmental reporting and handling of the reports;明确NFC对于环境报告及报告处理的要求;define requirements to employee environmental induction and training;明确对于员工环境入职教育及培训的要求;give an overview of expected environmental impacts related to the construction phas

11、e and commitments with respect to control, mitigation and monitoring.概述建设阶段的预期环境影响以及在控制、缓和及监控方面的承诺1.2SCOPE1.2范围The EMP for the construction phase is a subordinate document to the document HSE Requirements in Construction.建设阶段的环境管理计划(EMP)作为施工中的健康安全与环境(HSE)要求的附属文件。1.3DISTRIBUTION AND INTENTED AUDIENCE

12、1.3发行及目标对象The implementation and ongoing maintenance of this Environmental Management Plan is the responsibility of the Project Safety Manager.项目安全经理负责本环境管理计划的实施及持续维护。Revisions to the Health and Safety Plan shall be made as required to reflect the current status of the Works and a record of each rev

13、ision detailing the nature and scope of the change maintained.应按照规定修订健康与安全计划,以便反映出工程的当前状态以及每次修订的记录(详细说明记录的变更性质及范围)。1.4DEFINITIONS, ACRONYMS AND ABBREVIATIONS 1.4定义、首字母缩略词及缩略语1.4.1GENERAL DEFINITIONS1.4.1一般定义EIAEnvironmental Impact AssessmentEMPEnvironmental Management PlanEMSEnvironmental Management

14、 SystemHSEHealth, Safety and EnvironmentRoKRepublic of KazakhstanEIA环境影响评价EMP环境管理计划EMS环境管理体系HSE健康安全与环境RoK哈萨克斯坦共和国1.5REFERENCE DOCUMENTS AND LINKS1.5参考文件与链接The main legal basis for the NFC Copper Project is:NFC铜矿项目主要法律依据为:Environmental Protection Code 212 (2007)(2007年)第212号环境保护法Spill Prevention Contr

15、ol泄漏防控法In addition to the above, Kazakhstan is signatory to a number of international conventions, which have to be respected. An overview is given in the EIA.除以上法规外,哈萨克斯坦签署了若干需遵守的国际公约。在环境影响报告中做了概述。2.ROLES AND RESPONSIBILITIES2.职务与职责NFC Copper Project Management Team has identified the responsibilit

16、ies and regulatory requirements and assigned authority to key personnel within the organisation to ensure the obligations and responsibilities are met. NFC铜矿项目管理团队已认定了职责与监管要求,并将权力授予组织内部主要工作人员,以保证义务与职责得以满足。All roles listed below will have detailed position descriptions.以下所有职务的详细职位说明。Senior Site Repre

17、sentative: Responsibility for the implementation, continuation, integration into construction and pre-commissioning activities, and continuous improvement of the EMP rests with the Senior Site Representative. The main duties are:1) To organize and establish the project management system.2) To organi

18、ze and formulate the environmental management plan.3) To establish and adjust the organization framework of project environmental management system, to formulate the duty and authority.4) To organize inter audit of project environmental management system, and to assist branch firm organize the manag

19、ement reviews. 5) To provide the resource in order to keeps the environmental management system operating effectively. 高级现场代表:高级现场代表负责环境管理计划的实施、持续、建设整合、预调试活动以及持续改进。具体职责为:1)组织构架项目环境管理体系;2)组织制订环境管理计划;3)建立和调整项目环境管理体系的组织机构,规定岗位职责和权限;4)组织项目环境管理体系内部审核,并协助分公司组织管理评审;5)确保为环境管理体系持续有效运行所需的资源。Site HSE Manager:

20、Responsibility for the management of the overall HSE function on the PROJECT rests with the Site HSE Manager. The Site HSE Manager shall also be responsible to insure the conduct of weekly meetings. The main duties are:1) To assist project manager managing the environmental management system.2) To p

21、articipate the formulation and operation of environmental guideline, environmental objectives and indexes.3) To responsible for organize the project management staff to learn the laws and regulations relate to environment.4) To responsible for the training and implementation of environmental managem

22、ent system and document.5) To responsible for the communication works of environmental information.6) To responsible for providing the environmental guideline and other relating documents.7) To responsible for the organization work of external audit.8) To responsible for publicity of environmental g

23、uideline and objectives.现场健康安全与环境(HSE)经理:现场HSE经理负责项目健康安全与环境(HSE)的整体功能管理。现场健康安全与环境(HSE)经理还负责保证周会的进行。具体职责为:1).协助项目经理管理环境管理体系;2.). 参与制订并贯彻执行环境方针、环境目标和指标;3). 负责组织项目管理人员学习与环境相关的法律、法规;4). 负责环境管理体系标准、环境管理体系文件的培训和指导实施;5). 负责环境信息的沟通工作;6). 负责向相关方提供环境方针及相关文件;7). 负责接待外部审核的组织工作;8). 负责环境方针、目标的对外宣传。Site Environmen

24、tal Engineer: Shall be responsible for the establishment, implementation, and maintenance of the EMP. Regardless of any other duties, he shall be responsible for reporting to management on the performance of the EMP, review, and recommendations for improvement. The main duties are :1. To participate

25、 in establishment of project environmental management plan.2. To assist site manager training the management staff about environmental management system standard and other documents relating to it.3. To responsible for assigning the environmental objectives and indexes to each staff, and ensure the

26、implement of specific management measure.4. To responsible for monitoring the work of each responsible staffs implementation of environmental management plan. If any work is unqualified, proposing reform and ensure to complete it.5. To responsible for the training of potential accident or emergency

27、situation, and emergency measure. 6. To establish an environment account, inspect the implementation of budget. And keep the expense record relating to the environmental cost.7. To responsible for organize the investigation, analysis, solution and report of environmental accident.8. To responsible f

28、or the internal audit of project environmental management system.现场环境工程师:应负责建立、实施及维护环境管理计划。除其他任何职责外,现场环境工程师应负责向环境管理计划实施的管理人员报告,审核、并提出改进建议。具体职责:1. 参与编制项目环境管理计划;2. 协助现场经理对管理人员进行环境管理体系标准、环境管理体系文件的培训;3. 负责分解各项环境目标和指标至相关责任人,并落实具体管理措施;4. 负责监督各相关责任人执行环境管理计划的情况,对出现的不合格项及时提出整改,并督促落实到位;5. 负责对全体人员进行潜在事故、紧急情况及应

29、急措施的培训;6. 建立环保台帐,检查预算的落实情况,保存有关环保费用的支出记录;7. 负责组织环境事故的调查、分析、处理和报告。8. 负责项目环境管理体系的内部审核。Project Engineering: Shall be responsible to ensure that all engineering and procurement is conducted in support of the EMP.项目工程:应负责确保所有工程及采购活动的实施以环境管理计划的配套为基础。Materials Managers: Shall be responsible for ensuring th

30、at all chemical products procured for and/or received on site are accompanied by a Material Safety Data Sheet.物料经理:应负责确保为现场采购和/或收到的所有化学品都附有物料安全数据表。Document Control: Shall be responsible for the formal notification and distribution of documents supporting the EMP.文件管控:应负责支持环境管理计划的文件的正式通知及分发。NFC-HSE S

31、taff: Shall be responsible for the timely reporting of conditions which may impact the performance of the EMP, result in an incident, or provide opportunity for improvement.NFC健康安全与环境(HSE)人员: 应负责及时报告可能影响环境管理计划实施、导致事故发生或可能提供改进机会的情况。3.GENERAL REQUIREMENTS3.一般要求3.1Environmental Management3.1环境管理3.1.1En

32、vironmental Policy3.1.1环境方针NFC Copper Project will demonstrate a strong sense of responsibility and openness on Environment, Health and Safety for our employees, customers and community where we operate.NFC铜矿项目将证明,我们对于员工、客户及运营所在地区的环境、健康与安全具有高度的责任心和开放度。Construction of the project will therefore be de

33、signed with an inherent environmental, working environment and safety standard. Our objective is to be in the forefront within the industry while at the same time promoting the operating goals set for the plant.因此,我们将秉承固有的环境、工作环境及安全标准来工程项目建设。我们的目标是在提升工厂经营目标的同时走在行业的前沿。To minimize environmental impact

34、s concerning our activities, products and services, we shall:为了将我们的活动、产品及服务的相关环境影响降至最低,我们应:Identify, control and monitor our products and operation processes in an environmentally responsible manner.以对环境负责的态度对我们的产品以及操作流程进行确定、控制及监控。Comply with applicable legal requirements and other requirements to w

35、hich the Company subscribes which relate to its environmental aspects.遵守适用法律规定及公司签署的其他与环境相关的要求。Establish, review and continually improve our quality and environmental management objectives and performance.建立、审核并不断改进我们的质量与环境管理目标及对此的履行。To establish targets and objectives for short-term and long-term i

36、mprovement.为短期及长期的改进建立目标与指标。Educate, train and motivate employees to carry out tasks in environmentally responsible manner.对雇员进行教育、训练和激励,使他们以对环境负责的态度开展工作。Encourage environmental protection among suppliers and subcontractors.鼓励供应商与分包商进行环境保护。Environmental Policy will be communicated to all staff, cont

37、ractors and suppliers.将与所有员工、承包商及供应商就环境方针作出沟通交流。3.2NFC-Environmental Objectives 3.2NFC环境目标NFC has as objectives the work shall be performed in a timely manner with minimum impacts to the environment and within the local statutory framework. Environmental considerations shall be part of all work plan

38、ning, and impacts shall be controlled to a necessary minimum. Whenever environmental impacts are unavoidable, it shall be ensured that the necessary permits are obtained, and that appropriate mitigation plans are established and implemented.NFC环境目标是:应将对环境的影响降至最小,在当地法律框架内及时进行工作。环境考虑应作为所有工作计划的一部分,应将环境

39、影响控制在必要最低值。当产生不可避免的环境影响时,应确定获得了必要的许可,并建立及实施了适当的缓解计划。3.3Environmental Management System (EMP)3.3环境管理体系(EMS)NFC-The EMP is an integrated part of the overall project execution management system. The management system comprises the following elements:NFC的环境管理体系(EMS)是项目整体执行管理体系中不可分割的一部分。管理体系由以下要素组成:Estab

40、lishing policies and objectives建立政策与目标Planning and analyses规划及分析Implementation实施Monitoring, evaluation and reporting监控、评估及报告Corrective action as necessary纠正措施(若必要)Management review of the EMPEMP管理审查The Project Management shall establish and communicate the policies and objectives, and shall initiate

41、 planning and analyses at the Project general level.项目管理应建立并沟通政策与目标,并在项目一般水平上进行计划及分析。Implementation of the requirements will generally be Contractors responsibility. Contractors shall initiate environmental planning and analyses within their area of responsibility. When appropriate, one contractor m

42、ay be nominated to coordinate environmental management plans between contractors.要求的实施一般作为承包商的责任。承包商应在其职责范围内开展环境规划及分析。适当时,可任命一位承包商协调各承包商之间的环境管理计划。Contractors shall perform monitoring and self-checking to ensure that the control measures are effective in achieving the desired results.承包商应进行监控及自检,以确定控

43、制措施能有效达到预期效果。NFC will audit contractors and perform verification activities with respect to adherence to the statutory and contractual requirements.NFC将对承包商进行审核,就承包商对于法律及合同要求的遵守情况进行检查。Contractors shall implement corrective actions whenever necessary in order to correct nonconformances.承包商应在必要时进行纠正措施

44、以便对不符合项进行改正。NFC Project Management will review the overall system through audits and examinations, and will implement system improvements as necessary.NFC项目管理将通过审计及检验来审核整体体系,并在必要时对体系进行改进。3.2Environmental Management3.2环境管理3.2.1Identification of Environmental Aspects3.2.1确定环境因素The company formulate an

45、d implementenvironmental aspects identification and evaluation process. To make a stipulation identify and evaluate the environmental aspects which are able to be controlled or be influenced during construction, in order to make sure environmental aspects could be controlled. Environmental aspects s

46、hould be identified during working, designing, purchasing, construction or service after construction. During environmental aspect identification process, the department should consider the way and scope of management, control, solution and the influence that can be exerted (such as to supplier, tra

47、nsporter or subcontractor.). Environmental aspect identification should consider normal, abnormal and emergency these three situations. In addition, it also should consider past, nowadays and future these three tenses. And following six aspects: the pollutions which are discharged into atmosphere; t

48、he pollutions which are discharged into water; the pollutions which are discharged into soil; the using, consumption and waste of materials and natural resources; local other environmental problems and community problems (such as noise, light pollution, virescence and others).The environmental aspec

49、ts of the construction plans will have to be assessed and detailed by the contractors in their specific environmental management plans. 公司制定并实施环境因素识别与评价程序,对在施工生产和服务中能够控制或可能施加影响的环境因素如何进行识别和评价做出规定,以确保重要环境因素能够得到控制。应从公司的办公、设计、采购、施工和竣工后服务等活动中识别环境因素。识别环境因素时应考虑本单位在过程活动中,自身可以管理、控制、处理以及可施加影响(如对供应商、运输商、分包商)的方

50、面和范围。识别环境因素应考虑正常、异常、紧急三种状态,过去、现在、将来三种时态和下列六个方面:向大气排放的污染物;向水体排放的污染物;固体废弃物污染;向土壤排放的污染物;原材料与自然资源的使用、消耗和浪费;当地其它环境问题和社区问题(如噪声、光污染、绿化等)。承包商应在其具体的环境管理计划中就建设规划的环境因素进行评估及详细说明。3.2.2Establishment of Environmental Plans and Procedures3.2.2建立环境计划及程序Contractors shall observe these requirements and commitments in

51、their work planning and execution, and shall consider the proposals given with respect to control measures and mitigation. 承包商在规划及执行工作时应遵守这些要求及承诺,并就给予的控制措施及缓和措施相关建议进行考虑。NFC shall ensure that their sub-contractors follow prevailing procedures and as necessary develop supplementary procedures for thei

52、r own work.NFC应确定其分包商遵守了普通程序并在必要时为自身工作制定补充程序。3.2.4Environmental Permits3.2.4环境许可In addition to the Approval of the EIA, specific permits will have to be obtained for parts of the construction work, if this has not been covered in the Approval of the EIA. This applies specifically to the following ta

53、sks:建设的部分工作除得到环境影响评估的批准外还需获得特定许可(若并未包含在环境影响评估的批准范围内)。特定许可专门适用于以下工作:Construction of the temporary constriction facilities - accommodation camps, access roads, infrastructure临时压缩设备的建设-营地住宿、通道、基础设施。3.2.5 Environmental index and objectives.3.2.5 环境指标和目标1) To organize the regular training for all project

54、 construction staffs, in order to make all staffs realize the own environmental responsibility. Every staff should observe and be aware of the relevant environmental laws and regulations.2) Focusing on environmental improvement and pollution prevention of construction site and perimeter zone (cleane

55、r production). Ensure the satisfaction of proprietor and surrounding public and employees.3) Focusing on decreasing resource consumption and waste reduction, achieve low consumption production. Control the construction waste efficiently. In conclusion, during this construction, the objectives and main indexes of environmental management are:1. Never hinder public safety, never impact construction, never has environmental governance problem that may endanger society.2. Avoid the complaint of water pollution.3. The management of toxic substances must in strict accordance with the rele

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论