版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、June 7, 2021Reception of the CWC organization international verification work leading group member and contact methodLeadership groupGroup leader:Houhongwei The deputy leader of the group: BianWeiPing ZhangLinFeng DingKunTangTechnology GroupGroup leader:liGuoZhongThe deputy leader of the group: GuoG
2、enFa WangGongChangData groupGroup leader:WangJianJun The deputy leader of the group: HeSongLinLogistics support groupGroup leader:XuYanZhaoThe deputy leader of the group: LiuMaishengIntegrated teamGroup leader:DangHongXingThe deputy leader of the group:YanLIHongTranslation groupGroup leader:Faciliti
3、es on behalf of XueJianJun Leadership groupJob responsibilities:Group leader:The company responsible for the formulation of the reception OPCW verification scheme,responsible for the company to receive OPCW verification of leading work,The organization of the company various departments、Workshop in
4、strict accordance with the verification requirements, in the two days prior to the start of all the corresponding reception。The deputy leader of the group to assist the team leader is responsible for the safety, security, fire protection, environmental sanitation, logistics services and the surround
5、ing the company to coordinate the work 。Facilities on behalf of:Responsible for the verification of data preparation,speak before the inspection briefing ,to accompany the verification and talks,response verification group presented problems。Technology GroupJob responsibilitiesJob responsibilities:R
6、esponsible for checking, auditing“material balance calculation and Responsible for checking, auditing“material balance calculation and descriptiondescription、“productivity calculation method and note“productivity calculation method and noteand other and other informationinformation,ensure accurateen
7、sure accurate;Assist facilities on behalf of relevant technical information Assist facilities on behalf of relevant technical information ( including process flow, product quality standards, product ( including process flow, product quality standards, product inspection procedures, environmental pro
8、tection, waste treatment, inspection procedures, environmental protection, waste treatment, accident prevention, emergency treatment, safety rules );accident prevention, emergency treatment, safety rules );Guide post operator, the sampling member, analysts are always ready Guide post operator, the s
9、ampling member, analysts are always ready to answer questions and requests the inspectors work ( inspector to answer questions and requests the inspectors work ( inspector asked separately facilities facilities, have a representative asked separately facilities facilities, have a representative pres
10、ent )present );The group has used for sampling, analytical reagents, instruments, The group has used for sampling, analytical reagents, instruments, sampling, sampling packages, such as leaves, is responsible for the sampling, sampling packages, such as leaves, is responsible for the in situ double
11、seal; to take in the Chinese and foreign parties, is in situ double seal; to take in the Chinese and foreign parties, is responsible for the supervision, its cleanresponsible for the supervision, its clean。Data groupJob responsibilities:Responsible for sorting, summary, check all kinds of original r
12、ecords and monthly, annual account, and one by one number form the record, complete, accurate account;Responsible for providing and inspections of relevant data, information ( all ready to provide data, data prior to ID), issued to sign;Responsible for the relevant data, data interpretation;The end
13、of inspections, responsible for the data from the data, all recovered。 Integrated teamJob responsibilitiesJob responsibilities:Regularly check the equipment safety, find potential safety problems and timely rectification;Strengthening maintenance management, timely elimination of run, run, drip, lea
14、k;Responsible for production safety, fire management, to ensure that no danger of anything going wrong;Responsible for production and on site management;Office area, production area environment and check;Responsible for the factory workshop, equipment and pipeline maintenance;Responsible for solid w
15、aste were disposed of properly;Responsible for production equipment, pipeline identification。Logistics support groupJob responsibilitiesJob responsibilities:Responsible for conference room, studio, laboratory and other inspection work place Responsible for conference room, studio, laboratory and oth
16、er inspection work place preparation, health etc.preparation, health etc.;Responsible for copiers, fax machines, communications facilities, projector, analytical Responsible for copiers, fax machines, communications facilities, projector, analytical instruments and other equipment, equipment is alwa
17、ys in good conditioninstruments and other equipment, equipment is always in good condition;Responsible for the inspection of activity during the provision of drinking water ( bottled Responsible for the inspection of activity during the provision of drinking water ( bottled mineral watermineral wate
18、r;Responsible for providing access to inspect the facilities at the scene with the safety Responsible for providing access to inspect the facilities at the scene with the safety protective equipmentprotective equipment;Responsible for contact and cooperate with the hospital and ambulance crews in th
19、e event of Responsible for contact and cooperate with the hospital and ambulance crews in the event of accident emergency treatmentaccident emergency treatment;In the public security personnel cooperate to fall, is responsible for the facilities at the In the public security personnel cooperate to f
20、all, is responsible for the facilities at the scene, meeting rooms, studios, laboratories, storage rooms and other locations of the scene, meeting rooms, studios, laboratories, storage rooms and other locations of the inspection personnel inspection activities, goods securityinspection personnel ins
21、pection activities, goods security;The camera crew, is responsible for the reception and verification of the whole video, ready The camera crew, is responsible for the reception and verification of the whole video, ready to be the international inspection team personnel requirements, by the national
22、 delegates to be the international inspection team personnel requirements, by the national delegates agreed, the inspected facilitiesagreed, the inspected facilities;All the reception personnel in the verification team staff into the plant before the day all All the reception personnel in the verifi
23、cation team staff into the plant before the day all in place; the reception of preparatory work in the verification team staff into the plant in place; the reception of preparatory work in the verification team staff into the plant before two days all readybefore two days all ready;Draw company rece
24、ption verification of the alignment markDraw company reception verification of the alignment mark。1, 20000 tons / year methanol, methanol is widely used, is the basic organic chemical raw materials and fuel quality. Is one of the important raw materials of pesticide, medicine. Line of advanced techn
25、ology, device adopts Hunan Anchun company design of low pressure methanol, the implementation of automated control。公司接受核查工程公司接受核查工程 2、The building has 1500 cubic methanol storage tank, storage for methanol. Using live instruments and two meter centralized display control method, and adopts the chain
26、, emergency shut-off, alarm, video surveillance and monitoring facilities。 3、Build a foam fire Build a foam fire safety facilitiessafety facilities。In In strict accordance with the strict accordance with the fire control requirements fire control requirements of the building, a of the building, a co
27、mpany-wide staff company-wide staff assembly patrol system, assembly patrol system, regular inspection, plant regular inspection, plant boundary walls using video boundary walls using video monitoring facilities, set monitoring facilities, set up fire control room, up fire control room, through the
28、fire through the fire inspection and acceptanceinspection and acceptance。4、Build environmental protection infrastructure。In strict accordance with the Ministry of Environmental Protection approved by the environmental protection department of the spirit, the field detection and field inspection。Need
29、 to prepare the materials 1、Before the inspection briefingIn English,And production into PPT) 2、Material balance 3、Calibration of DOC products production capacity calculation 4、Production, consumption of raw materials daily report, monthly report, annual reportBefore the inspection briefing The first part Plant introduction 1、The geographical environment and traffic 2、Company profile 3、The main products and raw materials 4、The company has hazardous, toxic chemicals and its physicochemical properties 5、Development and quality controlBefore the inspection briefing The sec
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026中国智能旅游业市场深度调研及发展战略与投资前景预测研究报告
- 2026乳制品加工业市场环境供需持续性分析及投资收益必要性规划研究
- 2026农机行业风险投资发展方向及融资策略研究报告
- 2026区块链技术行业市场深度调研及投资前景与投资策略研究报告
- 2026媒体娱乐行业市场供需分析及投资风险评估规划设计报告
- 2026中国叶黄素酯行业信用体系建设与商业合作模式创新
- 2026农业科技行业市场深度研究及发展趋势与投资策略规划分析报告书
- 2026浙大历史面试题目及答案
- 2026专项工作面试题及答案
- 2026-2030全球与中国钢材加工配送行业发展现状及趋势预测分析研究报告
- 门诊护理礼仪规范与实务
- 大件运输方案范文运输方案路勘报告
- 普惠金融营销课件
- 人教版三年级上册《生命.生态.安全》全册教案(及计划)
- 历史文化名城保护与发展研究
- 宿管员安全知识培训
- 小区广告位招租模板(五篇)
- 老干部工作业务知识要点课件-湖南大学离退休处
- 职业健康与劳动保护知识培训
- 多层压合工艺技术
- 购买设备合同
评论
0/150
提交评论