绩效管理的好工具(英文 40页)(1)ppt课件_第1页
绩效管理的好工具(英文 40页)(1)ppt课件_第2页
绩效管理的好工具(英文 40页)(1)ppt课件_第3页
绩效管理的好工具(英文 40页)(1)ppt课件_第4页
绩效管理的好工具(英文 40页)(1)ppt课件_第5页
已阅读5页,还剩35页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Environmental Management System ImplementationThe Draft Navy EMS Implementation Guide25 July 2002 Workshop.Practices, Aspects, Impacts-ConceptsMissionResourceImpactResourceResourceImpactImpactActivities/ OperationsPracticesAspectAspectAspect.Installations have an EQA inventory in place:PracticesPrac

2、tice Owners and LocationsCompliance Inspection and OversightEvaluation Frequencies and ResponsibilitiesNeed to make comprehensive and add:AspectsImpactsPractices, Aspects, Impacts-Inventory.Practices, Aspects, Impacts-RelationshipsInventoryRisk-Based PrioritiesObjectives and TargetsMonitoring and Me

3、asurement Actions, ProjectsPlanCheckInventory is basis for risk evaluation and objectives and targetsInventory is basis for EQA Internal Assessment.Practices, Aspects, Impacts-First StepsUpdate existing EQA inventory with aspects and impacts informationInitially may not be comprehensiveGoal to get E

4、MS implementation underwayFollow implementation strategy established in Pre-Planning phase.Risk to MissionMissionResourceImpactResourceResourceImpactImpactActivities/ OperationsPracticesAspectAspectAspect.Impacts and Risk.Practices, Aspects, Impacts - Risk RankingEvaluate relative risk to mission to

5、 prioritize practices/aspectsProcess should be: repeatable, documented, defensible, and periodicMay apply qualitative approachinitially and apply quantitative method later.Pollution Prevention OpportunitiesNavy installations have mature P2 Programs in placeThe practice inventory may suggest P2 oppor

6、tunities not considered within the traditional HW/industrial process focus of P2 .Pollution Prevention Opportunities- First StepsReview practice inventory for P2 opportunitiesApply P2 approach to identify and develop solutions for:Industrial practices not previously identifiedNon-industrial practice

7、sEnvironmental aspects.Objectives and TargetsObjectives define an end-state supportive of the installations environmental policy goalsTargets are detailed performance standards that quantify each objectiveShould be achievable and measurablePeriodically review and revise.Objectives and Targets-Types.

8、Objectives and Targets-RelationshipsObjectives and TargetsRequirementsRisk-Based PrioritiesEnvironmental Policy GoalsMission, Local ConditionsMedia ProgramsPlanDoActions, Projects.Actions and ProjectsActions - behavioral/administrative initiatives or outside support within the COs meansRealign exist

9、ing R/RDevelop and provide training or proceduresSecure NAVFAC supportProjects - initiatives requiring external funding, requested and justified through PPBSP2 investmentsStudiesPlan development.Actions and Projects-RelationshipsRisk-Based PrioritiesObjectives and TargetsMonitoring and Measurement A

10、ctionsPlanDoCheckPOMProjectsPrograms.PolicyPlanningImplementationChecking/Corrective ActionManagement Review.Structure: The EMS TeamDesignated by Installation/Regional CommanderIncludes Senior Management (EQB)CO/XOs of installation and tenantsDepartment/Division managersEnvironmental office managerI

11、ncludes Technical Support and EMS ImplementationMedia managers and other environmental office staffEnvironmental POCs.EMS Team may include personnel fromTenantsProductionMaintenanceROICCSupplyQualityHuman ResourcesEnvironmentalSafety and HealthPublic AffairsComptrollerBOS Contractors.Structure: Envi

12、ronmental OfficeMedia programsMatureAlready in placeEMS elements in placeP2Legal requirementsEmergency responsePPBSTrainingAirAsbestosRadonPesticidesCultural ResourcesNatural ResourcesHM/HWIPRNEPANoiseP2Solid WasteDrinking WaterInfectious WastesUST.Structure: Practice Owners“Command, unit, or office

13、 that uses a practice to accomplish its missionAuthority to accomplish their mission using a practice responsibility to control its aspectsAccountability = Responsibilities +Authority4.Accountability = Responsibilities +AuthorityEMSElementsMediaProgramsPracticesEMSTeamEnvironmentalOfficePracticeOwne

14、rs44.Training -CurrentRequired by RegulationMedia related: HW worker, WWTP operation, asbestos worker, emergency responseJob RelatedGenerally for environmental staff: NEPA, ERMS, computer skills.Training for EMS ImplementationInitial EMS Team TrainingSenior ManagementEnvironmental Support StaffPract

15、ice Owners TrainingEnvironmental SOPsVideoInteractiveWeb.EMS Description DocumentInclude installation EMS Policy Demonstrates & communicates implementationObjectives and targetsOrganizational structure and key responsibilitiesEMS elements Incorporate or provide a roadmap to information supporting ea

16、ch EMS element.CommunicationInternalSenior managements roleEnvironmental staff translate requirements into procedures and distribute to practice ownersMechanism for practice owners to communicate with Environmental OfficeExternalPublic Affairs Office.Environmental SOPsDocument for each practiceLocat

17、ion, owner, POCAspects and potential impacts.Environmental SOPsDocument for each practiceLocation, owner, POCAspects and potential impactsRequirements, Procedures, Responsibilities forOperational controlCommunicationsEmergency preparedness and responseInspectionTraining.Environmental SOPsDocument fo

18、r each practiceLocation, owner, POCAspects and potential impactsRequirements, Procedures, Responsibilities forOperational controlCommunicationsEmergency preparedness and responseInspectionTrainingDesign, capacity, inputsPhysical controls, P2 options, and BMPs in place.Tailored Environmental SOPsPrac

19、tice owners need to know or provideLocation, owner, POC Procedures, Responsibilities forOperational controlCommunicationsEmergency preparedness and responseInspectionTraining.Emergency Preparedness & ResponsePlans prepared, not distributedTraining up to date ?Distribute procedures in Environmental S

20、OPs.PolicyPlanningImplementationChecking/Corrective ActionManagement Review.Monitoring and MeasurementSampling and analysisInternal assessment effortsTracking progress in meeting objectives and targets.Problem/Cause Identification Corrective/Preventive ActionReview results of internal assessment eff

21、ortsConduct “problem solving.Problem/Cause Identification Corrective/Preventive ActionSuggested “problem solving approachDefine problemAnalyze root causesDevelop alternativesSelect corrective actionDevelop corrective actionImplement corrective actionFollow-up.EMS ReviewAnswer two questionsDoes the EMS, as described in the EMS Description Document, meet current Navy criteria?Does the EMS, as implemented, effectively do what the EMS Description Document says it will do?.PolicyPlanningImplementati

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论