1、The Main Contentscost engineering is defined as that area of engineering practice where engineering judgment and experience are utilized in the application of scientific principles and techniques to the problem of cost estimation, cost control and profitability. the following are basic approaches of

2、 cost estimation第1页,共22页。Production functionFor a specified level of output, we may attempt to find a set of values for the input factors so as to minimize the production cost.Empirical cost inferenceEmpirical estimation of cost functions requires statistical techniques which relate the cost of cons

3、tructing or operating a facility to a few important characteristics or attributes of the system.第2页,共22页。Unit costs for bill of quantitiesThe total cost is the summation of the products of the quantities multiplied by the corresponding unit costs.Allocation of joint costs The basic idea in this meth

4、od is that each expenditure item can be assigned to particular characteristics of the operation.第3页,共22页。cost estimation 成本估算cost engineering 工程估价profitability n 赢利production function 生产函数statistical inference 统计推断construction equipment 施工机具general office overhead 总部管理费Words and Expressions第4页,共22页。

5、the cost engineer or estimator 估算师cost control 成本控制empirical cost inference 经验成本推论法allocation of joint costs 综合成本的分摊bill of quantities 工程量清单construction supervision 施工监督第5页,共22页。English-Chinese translation1. regression analysis2. joint cost3. competitive bidding4. construction equipment5. constructi

6、on supervision6. at the beginning stage of a project life cycle7. reliable figures第6页,共22页。8. under the control of the construction project manager9. substantial fraction10. the base line11. the American Association of Cost Engineers12. a factor of production13. labor hours per square foot14. at a g

7、iven stage 第7页,共22页。Key StructuresA cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。第8页,共22页。According to the American Association of Cost Engineers, co

8、st engineering is defined as that area of engineering practice where engineering judgment and experience are utilized in the application of scientific principles and techniques to the problem of cost estimation, cost control and profitability.根据美国估算师协会的定义,工程成本是运用理性判断和经验,运用科学原理和技术,解决成本估算、成本控制和盈利能力等问题

9、的实用技术领域。Association of Cost Engineers:美国估算师协会第9页,共22页。For example, the amount of output Q may be derived as a function of various input factors x1, x2, ,xn by means of mathematical and /or statistical methods.例如,代表产出的Q可以用由代表各种投入的不同参数x1, x2, ,xn等通过数学和/或统计方法表达。be derived as:表示成Mathematical and/or stat

10、istical methods:数学和/或统计方法第10页,共22页。Empirical estimation of cost functions requires statistical techniques which relate the cost of constructing or operating a facility to a few important characteristics or attributes of the system.成本函数的经验估算需要统计方法,将建造成本或开动设备的成本与系统的某些重要特征或属性联系起来。本句主语为Empirical estimat

11、ion of cost functions,谓语为requires,宾语为statistical techniques,which relate. to a few important characteristics or attributes of the system为定语从句。第11页,共22页。Once these tasks are defined and quantities representing these tasks are assessed,a unit cost is assigned to each and then the total cost is determi

12、ned by summing the costs incurred in each task.一旦这些作业及其工程量确定下来,每个作业的单价便确定下来,然后将每个作业发生的费用加起来,就可确定总费用。本句中Once these tasks are defined and quantities representing these tasks are assessed为时间状语从句。第12页,共22页。The required levels of accuracy of construction cost estimates vary at different stages of project

13、 development,ranging from ball park figures in the early stage to fairly reliable figures for budget control prior to construction.在项目发展的不同阶段,建筑成本估算的精确程度各不相同,早期数字较近似,而施工前预算控制时数字已相当准确。本句主语为The required levels of accuracy of construction cost estimates,谓语为vary,at different stages of project developmen

14、t为时间状语,现在分词ranging的主语与句子的主语一致。第13页,共22页。Comprehension Exercises1. What is a cost estimate at a given stage of project?A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.第14页,共22页。2. What is the cos

15、t engineering according to the American Association of Cost Engineers?Cost engineering is defined as that area of engineering practice where engineering judgment and experience are utilized in the application of scientific principles and techniques to the problem of cost estimation, cost control and

16、 profitability.第15页,共22页。3. What is the production function in construction?In construction, the production function may be expressed by the relationship between the volume of construction and a factor of production such as labor or capital. A production function relates the amount or volume of outp

17、ut to the various inputs of labor, material and equipment.第16页,共22页。4. What are Unit costs for bill of quantities?A unit cost is assigned to each of the facility components or tasks as represented by the bill of quantities.第17页,共22页。5. How many items do the basic costs include? Can they exist a caus

18、al relationship?In construction projects, the accounts for basic costs may be classified according to (1) labor; (2) material; (3) construction equipment; (4) construction supervision; and (5) general office overhead.Ideally, the allocation of joint costs should be causally related to the category o

19、f basic costs in an allocation process. In many instances a causal relationship between the allocation factor and the cost item cannot be identified or may not exist.第18页,共22页。Relating Cost and Schedule Information有关成本和进度信息a complex inter relationship复杂的相互关系Trade-offs 交换;协定;交易;平衡 ,权衡取舍 Unanticipated

20、 events 无法预料的事件excavation problems 挖掘问题activities requiring digging 需开挖的活动the inter-play 相互作用Reading Material第19页,共22页。cement workers 水泥工人concrete forms 具体形式standard piping 标准管道a Cost Account and Project Activity Matrix一个成本帐户和项目活动矩阵第20页,共22页。2. A straightforward means of relating time and cost information is to define ind

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论