1、拉索幕墙施工质量控制要点securely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipm
2、ent; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall
3、 participate in the work; Side facing the House working at height, 1.2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams 。 Eight, provided by
4、 the General machinery and equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures f
5、or acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use. Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures,
6、 develop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records. Ten, the sub-contractor for scaffolding, construction site facilities, equipment
7、 safety protection facilities, safety signs and warning signs may be supplemented, removed, changed. If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed. Plenary and small mechanical o
8、perations, special operations and personnel, required training, after passing the examination by the relevant departments, with valid ID posts。 Hoisting personnel must abide by ”hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is
9、strictly prohibited and unauthorized operations use electric appliances, machinery and equipment. 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places non-smoking and the use of open flames, firefighting equipment are no
10、t allowed to divert it. Welding and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ”ten does not burn” provisions, prohibited the use of furnaces. Construction such as open flame heating measures must be used, you should obtain the consent o
11、f General fire拉索幕墙施工质量控制要点 南京第一建设事务所有限责任公司 ? 葛群星 摘要 本文结合拉索幕墙的施工过程,对钢结构框架与拉索幕墙之间连接及玻璃安装施工质量控制要点简要论述与分析。 关键词 钢结构 拉索幕墙 玻璃安装 施工质量 控制要点 南京青奥体育公园项目市级体育中心拉索幕墙工程1。23万平方米,地下1层,地上6层,砼框架+钢结构,总高度为42米,幕墙高度为30。45米,幕墙设计使用年限不少于25年,抗震设防7度,防火设计建筑分类一级,幕墙防雷设计等级二类,幕墙结构安全等级二级,本次监理的范围包括体育馆立面的拉索玻璃幕墙. 该工程体育馆外周48根柱为直径78。5CM钢
12、管柱外包钢筋混凝土结构,钢管柱芯注入C40混凝土至10。15米标高,有6跨从一层+0.00起钢管柱外斜至6层34.00米标高,其余42跨从二层5.400米标高起向上至6层34.00标高倾斜,倾斜夹角角度为75度,整个体育馆外形呈底口小上口大口杯型状,并且上口标高高度不等,本工程拉索玻璃幕墙,玻璃板块分格为矩形,为了增加工程的美观性,同时也为了玻璃更好的受力,驳接件选用球铰夹具,使玻璃和夹具形状更为统一,在风荷载作用时球铰结构的中心基本处于玻璃中心,使玻璃在挠度限值内产生自由变形,使玻璃应力大大降低,下面结合本工程拉索幕墙的施工过程,对该拉索结构的关键节点进行简述: securely, no t
13、hrowing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting mat
14、erial, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry firefighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall participate in the work; S
15、ide facing the House working at height, 1。2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams 。. Eight, provided by the General machinery and
16、 equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery
17、, is strictly prohibited in the case of unqualified acceptance or acceptance into use。 Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and mana
18、gement systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records。 Ten, the sub-contractor for scaffolding, construction site facilities, equipment safety protection facilit
19、ies, safety signs and warning signs may be supplemented, removed, changed。 If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed。 Plenary and small mechanical operations, special operati
20、ons and personnel, required training, after passing the examination by the relevant departments, with valid ID posts。 Hoisting personnel must abide by hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is strictly prohibited and una
21、uthorized operations use electric appliances, machinery and equipment。 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places nonsmoking and the use of open flames, firefighting equipment are not allowed to divert it。 Weld
22、ing and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ten does not burn provisions, prohibited the use of furnaces。 Construction such as open flame heating measures must be used, you should obtain the consent of General firesecurely, no thr
23、owing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting mater
24、ial, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry firefighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall participate in the work; Sid
25、e facing the House working at height, 1。2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams 。 Eight, provided by the General machinery and eq
26、uipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery, i
27、s strictly prohibited in the case of unqualified acceptance or acceptance into use. Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and managem
28、ent systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records. Ten, the subcontractor for scaffolding, construction site facilities, equipment safety protection facilities,
29、 safety signs and warning signs may be supplemented, removed, changed. If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed. Plenary and small mechanical operations, special operations
30、and personnel, required training, after passing the examination by the relevant departments, with valid ID posts. Hoisting personnel must abide by ”hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is strictly prohibited and unauth
31、orized operations use electric appliances, machinery and equipment. 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places nonsmoking and the use of open flames, fire-fighting equipment are not allowed to divert it。 Weldin
32、g and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ten does not burn” provisions, prohibited the use of furnaces。 Construction such as open flame heating measures must be used, you should obtain the consent of General fire1 拉索耳板定位焊接 应控制预埋件
33、、后植埋件材质质量,通过测量放线对竖、横向拉索耳板定位,对焊接质量、标高、角度位置进行验收,由于劲钢柱母材材质是Q345B,设计要求拉索耳板材质必须与母材相匹配,焊缝等级为一级,要求施工单位进行超声波探伤自检检测,监理人员进行旁站,发现问题后进行整改,然后进行复查,监理经过施工方自检检测记录,上报给业主,由业主安排有资质的第三方检测单位再进行按设计规范要求进行抽检,抽检全数合格后,经监理部隐蔽验收后,方可进行防腐工序处理。 2 竖、横拉索的布设 form (3), and accident hidden processing standard (4), and site security lo
34、g 3, and security supplies acceptance records (business license, and production license, and factory certificate, and products detection report or its He proved material attached Hou) 4, and construction site temporary electricity archives (1), and site temporary electricity electrical operation sec
35、urity technology lowdown (2), and construction site temporary electricity acceptance table (3), and grounding resistance test records (4), and mobile and the handheld mobile tool regularly insulation resistance test records (5), and electrical daily visits maintenance records (6), and construction s
36、ite electrical equipment check records table (7), and distribution box each ten special check records table 5, and pit support nursing acceptance table (1), and pit adjacent buildings settlement observation records table (1 ), Deformation monitoring of Foundation pit support records in table 6, form
37、work supporting system acceptance table 7, template removal request form 8, a special type of scaffold (pick, try hung, attached lifting scaffolding) tables 9, scaffold erection acceptance acceptance form (General, high-rise scaffolding) 10, scaffolding removed (including the main component) applica
38、tion form 11, Derrick and crane installation acceptance form 。. Site temporary power electrician safety technology gives the low-down (reference tables) construction construction construction organization name project name 5-41 content security technology to give the low-down the content must be app
39、roved by the technical training hold special operations after passing the examination certificate; The ease with which engaged in electrical work must meet the electrician required。 On the more difficult and more complex electrical engineering shall not be completed by the lower-level electrician; E
40、lectricians must be familiar with the technical specifications of the temporary electricity in construction site safety; All insulation, testing tools, and should be properly kept, it is strictly prohibited to use, and should be inspected regularly, check; Line no load on or off, and prohibit the ch
41、arged operation; Dangerous job, someone must monitor at the safe distance; When debugging and maintenance of electric power transmission, in addition to reliable power measures, should be hung at the switch box ”action to suppress the closing sign, and with special care; Targeted security gives the
42、low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan three copies of the form, team and keep a, filed a report, the security sector。 Temporary electricity in construction site acceptance form project name supply planning capacity (KW) rated cu
43、rrent a wire cross section ? plant protection system serial number check acceptance requirements results 1-construction organization design of temporary power supply onsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to th
44、e area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to c
45、arry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall participate in the work; Side facing the House working at height, 1。2m and high fences, and hang buckles seat belt; Targeted security gives the
46、 low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams .。 Eight, provided by the General machinery and equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package
47、in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use。 Nine, all subcontractors and G
48、eneral units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with th
49、e requirements, borrowing unit must be checked and written handover records。 Ten, the sub-contractor for scaffolding, construction site facilities, equipment safety protection facilities, safety signs and warning signs may be supplemented, removed, changed。 If needed change, must be approved by the
50、head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed。 Plenary and small mechanical operations, special operations and personnel, required training, after passing the examination by the relevant departments, with valid ID posts。
51、 Hoisting personnel must abide by ”hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is strictly prohibited and unauthorized operations use electric appliances, machinery and equipment。 12, the subcontractor must strictly implement
52、 the system of fire prevention and explosion protection, flammable and explosive places non-smoking and the use of open flames, fire-fighting equipment are not allowed to divert it。 Welding and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the
53、”ten does not burn provisions, prohibited the use of furnaces。 Construction such as open flame heating measures must be used, you should obtain the consent of General fire由于体育馆每跨跨矩及高度均不等,要求施工单位进行现场细致的统计、测算,按编号顺序下定单,该工程所有的拉索为不锈钢“坚朗品牌,竖索直径为18MM,横索直径为20,,和18MM两种规格,体育馆主体部分采用拉索点式玻璃幕墙系统,拉索幕墙的荷载组合:自重,风荷载,地
54、震荷载,温度荷载,系统采用水平鱼腹形双层索,竖向承重索,稳定索结构,水平索主要承受水平,竖向承重索主要承受点式幕墙自重,竖向后部稳定索主要起稳定结构工作,拉索进场后,监理人员开箱检查产品合格证、产品说明书、出厂检测报告,同时要求随机抽取进行见证取样,由业主委托的资质检测单位进行复检,合格报告出具后,准许施工单位按照编号顺序安装调试,监理部组织人员进行验收。 ,拉索撑杆及球形铰不锈钢夹具安装 securely, no throwing tools and waste; The deployment of material should be tuned on the ground after t
55、he first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to F
56、ireworks, meanwhile, had to carry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations。 With materials stimulate the allergic persons, shall participate in the work; Side facing the House working at height, 1.2m and high fences, and hang buckles seat belt
57、; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams .。 Eight, provided by the General machinery and equipment, scaffolding and other facilities, erection, installation is completed before
58、 delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use. N
59、ine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condit
60、ion and in accordance with the requirements, borrowing unit must be checked and written handover records。 Ten, the subcontractor for scaffolding, construction site facilities, equipment safety protection facilities, safety signs and warning signs may be supplemented, removed, changed。 If needed chan
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 航天科技五院513所2027届秋季校园招聘笔试备考试题及答案解析
- 2026-黑龙江中学教师预算核算招聘考试参考题库-含答案
- 2026四川大学视觉神经生物学及转化医学研究所专职博士后招聘3-4人考试参考题库及答案解析
- 2026-江西工商联安全管理专员招聘考试参考题库-含答案
- 2026-北京工商联档案管理员招聘考试参考题库-含答案
- 2026彭阳县住房和城乡建设局招聘城市管理协管人员3人考试模拟试题及答案解析
- 2026年其他皮革制品制造行业市场调研报告及未来五至十年投资机会分析
- 2026年苍南县教师招聘考试备考试题及答案解析
- 2026年渔业行业投资策略研究报告及未来五至十年蓝海开拓与红海突围
- 2026年合成橡胶制造行业趋势研究报告及未来五至十年渠道变革与价值重塑
- 城市餐厨垃圾处理设施施工方案及技术措施
- 管道沟槽开挖工程监理实施细则
- 电力工程建设与管理指南(标准版)
- BG4型正压氧气呼吸器课件
- 2026中级消防监控证考试题目及答案
- 进户门安装合同协议书
- 7.1.1 传染病及其预防 教学设计-人教版生物八年级下册
- 食管异物穿孔护理查房
- 村卫生室标准化建设课件
- 《自动控制原理》实验教案
- TD/T 1023-2010市(地)级土地利用总体规划编制规程
评论
0/150
提交评论