OverallProjectSummaryKeytyBasisProjectsummary(directandindirectcosts)Directcostspresentedwithkeytiesatasub-accountlevel.Indirectcostspresentedatasummarylevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectTitle: Prepared -ProjectLocation:North Currency:DOLLARSEstimateDate:13JUL16Project第1页,共 ReportPrinted6:45pmProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSOverallProjectSummary-KeyQtyKey(4)19(4)0.1(6)(7)UG460(7)AG7,470DirectConstEquip&ConstMgt,Staff,TaxesandOtherProjectIndirectProject第3页,共3 ReportPrinted
6:45
OverallProjectSummaryAccountBasisProjectsummary(directandindirectcosts)Directcostspresentedatanaccountlevel.IndirectcostspresentedatasummarylevelProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectTitle: Prepared -ProjectLocation:North Currency:DOLLARSEstimateDate:13JUL16Project第1页,共 ReportPrinted6:45pmProjectTitle:ProjectLocation:NorthJobNo:-EstimateDate:13JUL16PreparedBy:Est.Class:OverallProjectSummary-Account Labor Matl Total(4)(6)(7)DirectConstEquip&ConstMgt,Staff,TaxesandOtherProjectIndirectProject第3页,共3 ReportPrinted
6:45
OverallProjectSummaryContractorSummaryProjectsummary(directandindirectcosts)bycontractor.Directcostspresentedassinglelinevalues.Indirectcostspresentedasasinglelinevalues.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSOverallProjectSummary-Contractor Summary Labor Matl TotalPRIMEIndirectAccount DirectAccount Projectsers\
OverallProjectSummaryContractorTotals-KeytyBasisProjectsummary(directandindirectcosts)bycontractor.Directcostspresentedwithkeytiesatasub-accountlevel.IndirectcostspresentedatasummaryProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSOverallProjectSummary-Contractor Unit Key Cost PRIME(4)19(4)0.1(6)(7)UG460(7)AG7,470DirectConstEquip&ConstMgt,Staff,TaxesandOtherProjectIndirectContractor第2页,共3 ReportPrinted
6:45
ProjectProjectJobNo:EstimateNorth PreparedBy:-- Est.13JUL16 Currency:DOLLARSOverallProjectSummary-Contractor Key Project sers\
OverallProjectSummaryContractorTotals-AccountBasisProjectsummary(directandindirectcosts)bycontractor.Directcostspresentedatanaccountlevel.Indirectcostspresentedatasummarylevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectTitle:ProjectLocation:NorthJobNo:-EstimateDate:13JUL16PreparedBy:Est.Class: OverallProjectSummary-Contractor Labor Matl TotalPRIME(4)(6)(7)DirectConstEquip&ConstMgt,Staff,TaxesandOtherProjectIndirectContract第2页,共3 ReportPrinted
6:45
ProjectProjectJobNo:EstimateNorth-13JUL16PreparedBy:Est.Class: OverallProjectSummary-Contractor Labor Matl TotalProjectsers\
ProjectDirectTotalsKeytyBasisTotaldirectcost(TDC)summary.Directcostspresentedwithkeytiesatasub-accountlevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectProjectJobNo:Estimate
North-13JUL16
PreparedBy:Est.Class:
-DOLLARSProjectDirectTotals- ty Key
(4)19(4)0.1(6)(7)AG7,470(7)UG460ProjectDirect
ProjectDirectTotalsCodeofAccountGroupBasisTotaldirectcost(TDC)summarybyCodeofAccountgroup.Directcostspresentedwithkeytiesatasub-accountlevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSProjectDirectTotals-COAGroup Key Labor Matl Total(4)(440)(440)19(450)Rebar,Formwork,(4)(440)0.1(6)(640)Instr.Support&(660)Computer(7)AG(710)Wire,Cable,(710)Wire,Cable,7,080(720)Conduit,Trays,(730)OtherElec.(740)MajorElec.(750)Bldg/Area(750)Bldg/Area390(790)Other(7)UG(760)Buried(770)Grounding,Cath.(770)Grounding,Cath.460第2页,共3 ReportPrinted
6:45
ProjectProjectJobNo:EstimateNorth PreparedBy:-- Est.13JUL16 Currency:DOLLARSProjectDirectTotals-COAGroup Key LaborMatlTotalProjectDirect sers\
ProjectDirectTotalsContractorTotals-KeytyBasisTotaldirectcost(TDC)summarybycontractor.Directcostspresentedwithkeytiesatasub-accountProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectProjectJobNo:EstimateNorth-13JUL16PreparedBy:-Est.Currency:DOLLARSProjectDirectTotals-Contractor Key PRIME(4)19(4)0.1(6)(7)AG7,470(7)UG460Contractor第2页,共3 ReportPrinted
6:45
ProjectNorth Prepared- Est.13JUL16 Project-JobEstimateDOLLARSProjectDirectTotals-Contractor Key ProjectDirect sers\
ProjectDirectAreaTotals- tyTotaldirectcost(TDC)summarybyarea.Directcostspresentedwithkey atasub-accountlevel.ProjectProject1ScenarioProject1NorthJobEstimate13JUL16Prep.ProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSProjectDirectTotals-AreaKey Unit Key Cost MainArea:MainArea(4)19(4)0.1(6)(7)AG7,470(7)UG460AreaDirect第2页,共3 ReportPrinted
6:45
ProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSProjectDirectTotals-Area Key ProjectDirectsers\
ProjectDirectTotals-MaxiblockComponent/SourceKeytiesTotaldirectcost(TDC)summarybycomponent/sourcesortedbyDescription.Directcostspresentedwithkeytiesatasub-accountlevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSMaxiblock-Component/SourceKeyComponent/Source/Tag DirectInstalledMHand Key Labor Matl TotalProject/Area- AG Component/Source Project/Area-CTL AG 330 Component/Source Project/Area- UG 400 AG 750 Component/Source Project/Area-MSS 13.3 0.1 UG 30.0 AG Component/Source Project/Area-OPC AG 330 Component/Source Project/Area- AG Component/Source Project/Area-USS 5.5 UG 30.0 AG 6,060 Component/Source ProjectDirect sers\
DirectAccountsCodeofAccountTotaldirectcost(TDC)summarybyCodeofAccount.Directcostspresentedwithkeytiesatasub-accountlevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ReportReportPrintedAt6:45pmPAGE34ProjectTitle:ProjectLocation:NorthJobNo:-EstimateDate:13JUL16PreparedBy:Est.Class:DirectAccounts-CodeofAccountTotals CodeofAccount LaborCost MatlCost TotalCost (4)444-446-ConcretePourAnd447-6451-452-Foundation454-Formwork456-Install457-Strip&Clean458-1Account(4)445-Account(6)642-Conduit&664-Operator665-Cable/DataAccount(7)AG711-Wire/Cable-712-Wire/Cable-715-721-722-Conduit733-MotorControlCenter-737-Switchgear-738-BusDuct-739-Disconnect741-Transformers-742-Switchgear-745-BusDuct-747-Substation752-Lighting753-755-Misc.Small756-7757-Wire/Cable-4791-ElectricalCircuitAccount(7)UGProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARSDirectAccounts-CodeofAccountTotals CodeofAccount LaborCost MatlCost TotalCost 761-Electrical 771-Grounding Account ReportReportPrintedAt6:45pmPAGE44ProjectProjectJobNo:EstimateNorth-13JUL16PreparedBy:-Est.Currency:DirectAccounts-CodeofAccountCodeof Labor MatlTotalProjectDirectDirectCodeofAccountTotals-Totaldirectcost(TDC)summarybyCodeofAccountbycontractor.Directcostspresentedwithkeytiesatasub-accountlevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. PAGE3PAGE34ReportPrinted6:45ProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARS DirectAccounts-CodeofAccountTotals- Codeof Labor Matl Total PRIME(4)444-446-ConcretePourAnd447-6451-452-Foundation454-Formwork456-Install457-Strip&Clean458-Account(4)445-Account(6)642-Conduit&664-Operator665-Cable/DataAccount(7)AG711-Wire/Cable-712-Wire/Cable-715-721-722-Conduit733-MotorControlCenter-737-Switchgear-738-BusDuct-739-Disconnect741-Transformers-742-Switchgear-745-BusDuct-747-Substation752-Lighting753-755-Misc.Small756-7757-Wire/Cable-4791-ElectricalCircuitAccount(7)UG761-Electrical771-GroundingProjectTitle:ProjectLocation:North PreparedBy:-JobNo:- Est.EstimateDate:13JUL16 Currency:DOLLARS DirectAccounts-CodeofAccountTotals- Codeof Labor Matl Total PRIMEAccount PRIMECONTRACTOR PAGE4PAGE44ReportPrinted6:45ProjectProjectJobNo:EstimateNorth-13JUL16PreparedBy:-Est.Currency: DirectAccounts-CodeofAccountTotals- Codeof Labor Matl Total ProjectDirectDirectCodeofAccountTotals-Totaldirectcost(TDC)summarybyCodeofAccountbyarea.Directcostspresentedwithkeytiesatasub-accountProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ReportReportPrintedAt6:45pmPAGE34ProjectTitle:ProjectLocation:North PreparedBy:-Job - Est.EstimateDate:13JUL16 Currency: DirectAccounts-CodeofAccountTotals-Codeof Labor MatlTotalMainArea:MainArea(4)444- 446-ConcretePourAnd 447- 451- 452-Foundation454-Formwork 456-Install 457-Strip&Clean 458- Account (4)445-Account(6)642-Conduit& 664-Operator 665-Cable/Data Account (7)AG711-Wire/Cable- 712-Wire/Cable- 715- 721- 722-Conduit 733-MotorControlCenter- 737-Switchgear- 738-BusDuct- 739-Disconnect 741-Transformers- 742-Switchgear- 745-BusDuct- 747-Substation 752-Lighting 753- 755-Misc.Small 756- 757-Wire/Cable- 791-ElectricalCircuit ProjectTitle:ProjectLocation:North PreparedBy:-Job - Est.EstimateDate:13JUL16 Currency:DOLLARS DirectAccounts-CodeofAccountTotals- Codeof Labor Matl Total MainArea:MainAreaAccount(7)UG761-ElectricalTrenching771-GroundingAccountAreaReportReportPrintedAt6:45pmPAGE44ProjectProjectJobNo:EstimateNorth PreparedBy:-- Est.13JUL16 Currency:CodeofDirectAccounts-CodeofAccountTotals- Labor MatlTotalProjectDirectTotalTotaldirectcost(TDC)summary.DirectcostspresentedwithkeytiesatmodityProjectDirectTotalsProjectDirectTotalsOverallItemProjectProjectTitle:ProjectName:ScenarioName:ProjectLocation:NorthEstimateDate:13JUL16Job Prep. PAGE9PAGE910ReportPrintedAt6:45pmProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost (4)444-READY-MIXCONC.-TYPE18.8CodeofAccount446-ConcretePourAndPOURANDFINISH18.80SEALSLAB-TYPEA0.6CodeofAccount447-HAND0.6MACHINE30.6CodeofAccount6451-REBARINSTALL.-TYPE1.1CodeofAccount452-FoundationANCHORSAND318.9CodeofAccount454-FormworkBRACING537.1BD107CONTACTSURFACE286.5158CodeofAccount456-InstallProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost (4)456-InstallFORMWORK286.5CodeofAccount457-Strip&CleanSTRIPANDCLEAN286.5CodeofAccount458-EXCAVATED13.3CodeofAccount1AccountTotal-(4)(4)445-CodeofAccountAccountTotal-(4)0.11(6)642-Conduit&1.0081021.002001,2801.006381.0029191.00278ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost (6)642-Conduit&1.004CodeofAccount664-OperatorDUALCARTRIDGE1ENGINEERS13GATEWAY/HISTORY1HIWAY11UNIVOPERATOR2CodeofAccount665-Cable/Data75OHMCOAX220COAXCABLE2LCNCOAXCABLE1CodeofAccountAccountTotal-(6)(7)AG711-Wire/Cable-10 6006602 600360PULLWIREIN1,020CodeofAccountProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost (7)AG712-Wire/Cable-2 150006,060PULLWIREINCodeofAccount715-10 12 42 62 CodeofAccount721-0.751.252.50INSTALLCodeofAccount722-Conduit0.750.750.7530.7530.7530.7561.2581.25491.252 2ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost (7)AG722-Conduit1.2521.2542.5082.502.502.502.502.50CodeofAccount733-MotorControlCenter-4803480 32CodeofAccount737-Switchgear-480VFEEDERBREAKER-1480VMAINBREAKER-2480V2480VTIEBREAKER-1INSTALL480V1CodeofAccount738-BusDuct-480VBUSCodeofAccount739-DisconnectProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost (7)AG739-DisconnectCTLCENTERDISC.1OPSCENTERDISC.1PANELDISCONNECT1SUBSTATION4CodeofAccount741-Transformers-45 13800V245 34500V2CodeofAccount742-Switchgear-13.8KVFEEDERBRKR-213.8KVMAINBREAKER-213.8KVTIEBREAKER-1INSTALL13.8KV3CodeofAccount745-BusDuct-13800VBUS50CodeofAccount747-SubstationSUBSTATION12CodeofAccount752-LightingProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost (7)AG752-Lighting30.00FTLGWD2400 M.V.3CodeofAccount753-3WELD.3CodeofAccount755-Misc.Small15 480V230 480V1CodeofAccount756-100 81CodeofAccount7757-Wire/Cable-12 600390PULLWIREIN390CodeofAccount4791-ElectricalCircuitELECTRICAL2CodeofAccountProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS ProjectDirectTotals-OverallItemCodeof Key Other Unit Labor Matl TotalCost AccountTotal-(7)AG(7)UG761-ElectricalBACKFILL&7EXCAVATE7FILLHOLE-0FILLTRENCH-0CodeofAccount771-Grounding2/0400CADWELDGRNDCOND6GROUND2GROUND6GROUND60THERMOWELD,MOLD6CodeofAccountAccountTotal-(7)UG101010ReportPrintedAt6:45pmProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSCodeofAccountKeyProjectDirectTotals-OverallItemOther Unit Labor MatlTotalProjectDirect ProjectDirectCodeofAccount/ItemSummary-Totaldirectcost(TDC)summarybycontractor.Directcostspresentedwithkeytiesat modityProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. PAGE8PAGE89ReportPrintedAt6:45pmProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Matl TotalCost PRIME(4)444-READY-MIXCONC.-TYPE 19 COA 446-ConcretePourAndPOURANDFINISH 19 SEALSLAB-TYPEA 1 COA 447-HAND 1 MACHINE 31 COA 451-REBARINSTALL.-TYPE 1 COA 452-FoundationANCHORSAND 319 COA 454-FormworkBRACING 537BD 107CONTACTSURFACE 286 158COA 456-InstallFORMWORK 286 COA 457-Strip&CleanProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Matl TotalCost PRIME457-Strip&CleanSTRIPANDCLEAN 286 COA 458- 13 COA Account (4)445- 0.11 COATotalsAccountTotals(6)642-Conduit& 8 102 200 6 38 2 19 2 78 4 77 COA 664-OperatorDUALCARTRIDGE 1 1 3 GATEWAY/HISTORY 1 HIWAY 1 ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Matl TotalCost PRIME664-Operator 1 UNIVOPERATOR 2 COA 665-Cable/Data75OHMCOAX 220 COAXCABLE 2 LCNCOAXCABLE 1 COA Account (7)UG761-ElectricalBACKFILL& 7 EXCAVATE 7 FILLHOLE- 0 FILLTRENCH- 0 COA 771-Grounding2/0 400 CADWELDGRNDCOND 6 2 6 60 THERMOWELD,MOLD 6 COA Account (7)AGProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Matl TotalCost PRIME711-Wire/Cable-10 600 660 2 600 360 PULLWIREIN 1,020 COA 712-Wire/Cable-2AWG15000 6,060 PULLWIREIN 6,060 COA 715-10 LV- 12 12 LV- 4 2 HV- 6 2 LV- 12 COA 721- 325 518 100 277 2,000 INSTALL 2,425 COA 722-Conduit 12 126 10 50 3 21 3 94 3 96 6 92 ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Matl TotalCost PRIME722-Conduit 8 121 4 51 2 34 2 111 2 105 4 100 8 227 66 20 949 20 20 40 COA 733-MotorControlCenter-480 3 480 3 2 COA 737-Switchgear-480VFEEDERBREAKER- 1 480VMAINBREAKER- 2 480V 2 480VTIEBREAKER- 1 INSTALL480V 1 COA 738-BusDuct-480VBUS 50 COA ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Matl TotalCost PRIME739-DisconnectCTLCENTERDISC. 1 OPSCENTERDISC. 1 PANELDISCONNECT 1 SUBSTATION 4 COA 741-Transformers-45KVA13800V 2 45KVA34500V 2 COA 742-Switchgear-13.8KVFEEDERBRKR- 2 13.8KVMAINBREAKER- 2 13.8KVTIEBREAKER- 1 INSTALL13.8KV 3 COA 745-BusDuct-13800VBUS 50 COA 747-SubstationSUBSTATION 12 COA 752-Lighting30.00FTLGWD 2 400 M.V. 3 COA 753-ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Matl TotalCost PRIME753- 3 WELD. 3 COA 755-Misc.Small15 480V 2 30 480V 1 COA 756-100 8 1 COA 757-Wire/Cable-12 600 390 PULLWIREIN 390 COA 791-ElectricalCircuitELECTRICAL 2 COA Account Contractor PAGE9PAGE99ReportPrintedAt6:45pmProjectTitle:ProjectJobNo:EstimateNorth13JUL16PreparedBy:Est.Class:DOLLARSCodeofKeyCOA/ItemSummary-Other Unit MatlTotalProjectDirect ProjectDirectCodeofAccount/ItemSummary-Totaldirectcost(TDC)summarybyarea.Directcostspresentedwithkeytiesatan moditylevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. ReportPrintedReportPrintedAt6:45pmPAGE89ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Labor Unit Matl TotalCost MainArea:MainArea(4)444-READY-MIXCONC.-TYPE 19 COA 446-ConcretePourAndPOURANDFINISH 19 SEALSLAB-TYPEA COA 447-HAND MACHINE 31 COA 451-REBARINSTALL.-TYPE 1 COA 452-FoundationANCHORSAND 319 COA 454-FormworkBRACING 537BD 107CONTACTSURFACE 286 158COA 456-InstallFORMWORK 286 COA 457-Strip&CleanSTRIPANDCLEAN 286 COA 458- 13 ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Labor Unit Matl TotalCost MainArea:MainAreaCOA Account (4)445- COATotalsAccountTotals(6)642-Conduit& 8 102 200 6 38 2 19 2 78 4 77 COA 664-OperatorDUALCARTRIDGE 1 1 3 GATEWAY/HISTORY 1 HIWAY 1 1 UNIVOPERATOR 2 COA 665-Cable/Data75OHMCOAX 220 COAXCABLE 2 LCNCOAXCABLE 1 ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Labor Unit Matl TotalCost MainArea:MainAreaCOA Account (7)UG761-ElectricalBACKFILL& 7 EXCAVATE 7 FILLHOLE- FILLTRENCH- COA 771-Grounding2/0 400 CADWELDGRNDCOND 6 2 6 60 THERMOWELD,MOLD 6 COA Account (7)AG711-Wire/Cable-10 600 660 2 600 360 PULLWIREIN COA 712-Wire/Cable-2AWG15000 PULLWIREIN COA 715-ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Labor Unit Matl TotalCost MainArea:MainAreaArea715-10 LV- 12 12 LV- 4 2 HV- 6 2 LV- 12 COA 721- 325 518 100 277 INSTALL COA 722-Conduit 12 126 10 50 3 21 3 94 3 96 6 92 8 121 4 51 2 34 2 111 2 105 4 100 8 227 66 20 949 20 20 40 ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Labor Unit Matl TotalCost MainArea:MainAreaCOA 733-MotorControlCenter-480 3 480 3 2 COA 737-Switchgear-480VFEEDERBREAKER- 1 480VMAINBREAKER- 2 480V 2 480VTIEBREAKER- 1 INSTALL480V 1 COA 738-BusDuct-480VBUS 50 COA 739-DisconnectCTLCENTERDISC. 1 OPSCENTERDISC. 1 PANELDISCONNECT 1 SUBSTATION 4 COA 741-Transformers-45KVA13800V 2 45KVA34500V 2 COA 742-Switchgear-13.8KVFEEDERBRKR- 2 13.8KVMAINBREAKER- 2 13.8KVTIEBREAKER- 1 INSTALL13.8KV 3 ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Labor Unit Matl TotalCost MainArea:MainAreaCOA 745-BusDuct-13800VBUS 50 COA 747-SubstationSUBSTATION 12 COA 752-Lighting30.00FTLGWD 2 400 M.V. 3 COA 753- 3 WELD. 3 COA 755-Misc.Small15 480V 2 30 480V 1 COA 756-100 8 1 COA 757-Wire/Cable-12 600 390 PULLWIREIN 390 COA 791-ElectricalCircuitELECTRICAL 2 COA ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARS COA/ItemSummary-Codeof Key Other Unit Labor Unit Matl TotalCost MainArea:MainAreaAccount Area ReportPrintedReportPrintedAt6:45pmPAGE99ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSCodeofAccountKeyCOA/ItemSummary-Other Unit LaborUnitMatlTotalProjectDirect ProjectDirectCodeofAccount/ItemSummary-Totaldirectcost(TDC)summarybycomponent.Directcostspresentedwithkeytiesatan moditylevel.ProjectTitle:ProjectName:ScenarioName:ProjectLocation:North Job EstimateDate:13JUL16 Prep. PAGE9PAGE913ReportPrintedAt6:45pmProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSComponent/ COA/ItemSummary-Codeof Key Other Unit Labor Matl Total Project/Area-(7)AG791-ElectricalCircuitELECTRICALCOAAccount1ID:Component/Source0Project/Area-CTLID:(6)642-Conduit& 831021 200 61382 209194 22782 42772COA665-Cable/Data75OHMCOAX2209COAXCABLE221COAAccount(7)AG711-Wire/Cable-10 600PULLWIREIN3303303COA715-10 LV-COA644ProjectTitle:ProjectJobNo:EstimateComponent/SourceCodeof
North13JUL16
PreparedBy:Est.Class:COA/ItemSummary-
DOLLARS
Project/Area-CTL1721-
Key
Other
Unit
ID:
Labor
Matl
Total
100 159INSTALL 100 COA722-Conduit 4 42 3 15 1 7 1 31 1 32 2 COA733-MotorControlCenter-480 3 1
1111COA739-Disconnect
CTLCENTERDISC. 1 COA755-Misc.Small
15 480V 1
COAAccountComponent/SourceProject/Area-ID:(7)UG761-ElectricalBACKFILL&7EXCAVATE73FILLHOLE-7FILLTRENCH-5ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSComponent/ COA/ItemSummary-Codeof Key Other Unit Labor Matl Total Project/Area-ID:COA771-Grounding2/0400CADWELDGRNDCOND666THERMOWELD,MOLD6COAAccount(7)AG711-Wire/Cable-2 600360PULLWIREIN3608COA8715-12 LV-442 LV-12COA721- 125199 100277INSTALL225COA722-Conduit 41642 405201 104371 11311 11321 215311 831212ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSComponent/SourceCodeofAccountKeyCOA/ItemSummary-Other Unit Labor MatlTotal Project/Area-ID:722-Conduit1.254 95111.252 3461.252 11141.252 10541.254 1004COA739-DisconnectPANELDISCONNECT1 COA 752-Lighting30.00FTLGWD2 400 M.V.3 COA 753-3 WELD.3 COA 755-Misc.Small30 480V1 COA 756-100 81 COA 757-Wire/Cable-12 600390PULLWIREIN390 COA Account ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSComponent/ COA/ItemSummary-Codeof Key Other Unit Labor Matl Total Component/SourceProject/Area-MSSID:(4)444-READY-MIXCONC.-TYPE13COA446-ConcretePourAndPOURANDFINISH13SEALSLAB-TYPEA4COA447-HAND2MACHINE202COA4451-REBARINSTALL.-TYPECOA452-FoundationANCHORSAND226COA454-FormworkBRACING381BD76CONTACTSURFACE203112COA456-InstallFORMWORK203COA457-Strip&CleanSTRIPANDCLEAN2038COA8ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSComponent/ COA/ItemSummary-Codeof Key Other Unit Labor Matl Total Project/Area-MSSID:458-8077COA077Account(4)445-COAAccount0.11(7)UG771-Grounding130COAAccount(7)AG739-DisconnectSUBSTATION2COA741-Transformers-45KVA34500V2COA742-Switchgear-13.8KVFEEDERBRKR-213.8KVMAINBREAKER-213.8KVTIEBREAKER-1INSTALL13.8KV3COA745-BusDuct-ProjectTitle:ProjectLocation:North Prepared Job Est.EstimateDate:13JUL16 Currency:DOLLARSComponent/ COA/ItemSummary-Codeof Key Other Unit Labor Matl Total Project/Area-MSSID:745-BusDuct-13800VBUS50COA747-SubstationSUBSTATION12COAAccountComponent/SourceProject/Area-OPCID:(6)664-OperatorDUALCARTRIDGE1813GATEWAY/HISTORY1HIWAY1814UNIVOPERATOR2COA665-Cable/DataLCNCOAXCABLE1COAAccount(7)AG711-Wire/Cable-10 600PULLWIREIN3303303COA715-ProjectTitle:ProjectJobNo:EstimateComponent/SourceCodeof
North13JUL16
PreparedBy:Est.Class:COA/ItemSummary-
DOLLARS
Project/Area-OPC1715-
Key
Other
Unit
ID:
Labor
Matl
Total
10 LV- 6 COA - 100 159INSTALL 100 COA722-Co
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年MCN机构合作协议
- 少儿编程逻辑思维训练合同
- PDCA提升预诊分诊率
- 2025年陕西省特岗教师真题
- 2025年渭南市大荔善达精神专科医院招聘考试真题
- 2025年荆州市松滋市定向招聘大学生村级后备干部考试真题
- 《社区服务与文化建设》课件-社区的结构和功能
- 2026云南红河州检验检测院招募就业见习人员17人笔试参考题库及答案解析
- 2026新疆阿勒泰布尔津县社会补充招聘编制外医疗卫生工作人员1人考试备考题库及答案解析
- 2026年昌黎县中医院医护人员招聘笔试模拟试题及答案解析
- 2025年河北省中考化学试卷真题(含答案解析)
- 军事伪装道路施工技术专题
- 良肢位摆放叙试题及答案
- 2025年高考数学全国一卷试题真题及答案详解(精校打印)
- T/CCMA 0168-2023土方机械电控手柄技术要求及试验方法
- 成人癌性疼痛护理团体标准
- 2025年统计学期末考试题库:时间序列分析核心考点解析
- 实验室生物安全应急预案
- DG-TJ08-2177-2023建筑工程消防施工质量验收标准
- 《低聚糖功能性质》课件
- 华南理工大学《工程热力学》2023-2024学年第一学期期末试卷
评论
0/150
提交评论