栋楼及GS地库冬季施工方案目录一、工程概况·····························································································1谢谢阅读1.1、工程概述······················································································1精品文档放心下载1.2、结构形式······················································································1谢谢阅读1.3、建筑规模······················································································1感谢阅读1.4、工程地质及水文地质情况·································································1感谢阅读二、编制依据·····························································································2精品文档放心下载三、施工安排·····························································································2谢谢阅读四、施工准备·····························································································3精品文档放心下载五、施工方法及技术措施··············································································4感谢阅读5.1、临水、临电工程·············································································4谢谢阅读5。2、钢筋施工····················································································4谢谢阅读5。3、模板施工····················································································5谢谢阅读5.4、混凝土施工···················································································5精品文档放心下载5。5、防水施工····················································································9感谢阅读5.6、回填土方······················································································9精品文档放心下载5.7、砌筑工程······················································································9感谢阅读5.8、室内抹灰冬季施工·········································································10感谢阅读5。9、室外抹灰(保温层)冬季施工··························································11谢谢阅读六、质量保证措施······················································································11谢谢阅读七、安全保证措施······················································································12谢谢阅读7。1、建立安全组织机构·······································································12精品文档放心下载7.2、建立安全、消防培训与教育制度·······················································12谢谢阅读7.3、冬季施工现场安全管理···································································12谢谢阅读八、环境保护····························································································13感谢阅读第1页GS地库冬季施工方案精品文档放心下载燕子矶新城保障性住房一期工程G01精品文档放心下载一、工程概况1.1、工程概述本工程位于燕尧路和迈化路交叉处,由120617精品文档放心下载㎡,总建筑面积:420253㎡.由6栋33层、5栋32层、1栋29层、2栋23层、1谢谢阅读栋22层、2栋21层、4栋2层商业、1栋2层幼儿园、6栋1层配电房及2座地感谢阅读下一层地库组成。该项目附近有大量居民区,施工用水、用电、场外道路已通.谢谢阅读1.2、结构形式住宅楼上部结构采用全现浇剪力墙结构,地下车库采用框架剪力墙结构、商业门面感谢阅读房采用框架结构,基础形式为桩基+承台梁板,建筑结构的安全等级:二级。感谢阅读1.3、建筑规模本工程为21栋单体组成,其中E01#楼33层、建筑面积20965.87㎡,E02#楼33谢谢阅读层、建筑面积20965。87㎡,E03#楼33层、建筑面积20965。87㎡,E04#楼32层、感谢阅读建筑面积31264。99㎡,E05#楼21层、建筑面积13329。60㎡,E06#楼33层、建筑精品文档放心下载面积20965.87㎡,E07#楼33层、建筑面积28823。43㎡,E08#楼33层、建筑面积精品文档放心下载20965.879㎡,E09#楼32层、建筑面积20979。13㎡,E1—A栋幼儿园2层、建筑面谢谢阅读积3959㎡,Q01#楼23层、建筑面积15867。41㎡,Q02#楼23层、建筑面积15900.92感谢阅读㎡,S01#楼21层、建筑面积15994.95㎡,S02#楼22层、建筑面积17459。9㎡,G01精品文档放心下载#楼29层、建筑面积㎡,G02#楼32层、建筑面积㎡,G03#楼32精品文档放心下载层、建筑面积㎡,G04#楼32层、建筑面积㎡,E—A栋商业2精品文档放心下载层、建筑面积栋商业2层、建筑面积栋商业1层、谢谢阅读建筑面积355.72㎡,E—D栋商业1层、建筑面积栋商业1层、建筑面谢谢阅读积179.04栋商业1栋商业21568。谢谢阅读09栋商业2层、建筑面积1355。64㎡,G—C栋商业1层、建筑面积189.45㎡,感谢阅读G—D栋商业1355.48地库建筑面积22882地库建筑面积精品文档放心下载34018㎡。本次施工范围为G01~G04、G-A、B、C、D、S01、S02#楼及GS地库.感谢阅读1.4、工程地质及水文地质情况精品文档放心下载第页GS地库冬季施工方案谢谢阅读总体呈西北高东南低,局部为东西两侧高中间低,场地最大高差20。2m.其场地土层情精品文档放心下载况为:①-1层杂填土、①-2层素填土、②-1层粉质黏土、②-2层粉质黏土、②-2A层感谢阅读粉质黏土、②—3层粉质黏土、③层黏土、③—A层粉质黏土、⑤-1层强风化凝灰岩、谢谢阅读⑤-2层中等风化凝灰岩。场地地下水:稳定水位埋深为0.90~3.10m,地下水主要为孔隙潜水、基岩裂隙水.谢谢阅读孔隙潜水主要赋存于①层及②层土中。二、编制依据1、招、投标文件及补充文件2、南京兴华建筑设计研究院有限责任公司设计的《结构及建筑施工图》谢谢阅读精品文档放心下载感谢阅读精品文档放心下载感谢阅读谢谢阅读3—2002;精品文档放心下载感谢阅读感谢阅读谢谢阅读感谢阅读50327-2001;谢谢阅读220-2010;感谢阅读谢谢阅读17、施工组织设计;18、相关规范、规程三、施工安排1、冬季施工时间根据《建筑工程冬期施工规程》JGJ104—2011规定:当室外日平均气温连续5d稳感谢阅读定低于5℃即进入冬期施工,当室外日平均气温连续5d稳定高于5°C即解除冬期施工.精品文档放心下载第页GS地库冬季施工方案感谢阅读结合南京地区常年气温资料,本工程冬施南京地区属亚热带季风性湿润气候,春、夏、秋、冬四季分明,年降水约1000mm左精品文档放心下载右,时最大降水50mm,最冷月(1月)平均气温2—3℃(极端最低—13℃),最热月(7月)谢谢阅读平均气温28℃(极端最高42℃).冬季长约4个月起止期大约为11月15日至次年3月精品文档放心下载15日,其中:11月15日~12月15日为初冬,12月15日~次年2月底严冬(以大气温度谢谢阅读不低于—10C为标准).其中平均气温低于5的时间有2个月.主要灾害性天气有:冬季精品文档放心下载寒流、夏季梅雨及伏旱、夏秋季台风等.2、本冬季施工的主要冬施内容2)、部分单体墙体施工3)、所有单体外墙保温施工.4)、所有单体内墙粉刷施工.5)、所有单体屋面施工。6)、所有单体门窗安装。四、施工准备1、与当地气象部门随时保持联系,及时收听气象消息,掌握天气情况,防止寒流突精品文档放心下载然袭击.2、成立冬施领导小组,组长:魏国金副组长:顾晓茹马建黄国林组员:王青春阎庆仲跻猴任俊江才胜周仲弢尚春芳王兴化谢谢阅读孙爱华邵海尧王斌。该小组负责安排、管理、落实、检查冬施工作,并组织相关人员进行学习,向班组感谢阅读交底。特别是对测温保温人员等专业人员进行培训,明确责任。感谢阅读3、施工现场设大气测温仪器,由排专人进行气温观测并作好记录。本方案按常年谢谢阅读冬期施工气温编制,如冬施期间发现气象预报与常年有较大差异时,需对本方案及时调精品文档放心下载整,并做好准备工作.4、对现场的临水管道等作好保温防冻工作.5、对冬施中作业队职工生活作好安排:办公及住宿区取暖设备到位;棉大衣、棉精品文档放心下载第页GS地库冬季施工方案感谢阅读帽、手套等劳保用品准备到位.感谢阅读精品文档放心下载物资提前进场,并对操作人员进行寒冷季节使用机械设备的安全教育,同时做好防寒物精品文档放心下载资的供应工作。对机械设备,应由租赁公司机械管理部门组织定期检查,不用设备放尽感谢阅读各部存水,防止冻结.冬施所需材料用量表感谢阅读22根2张m五、施工方法及技术措施5.1、临水、临电工程1、消防管和消防栓必须作好保温工作,外露地面管线应采用石棉布等包裹保温,谢谢阅读随时检查,埋入地面冰冻线以上的水管也采取包裹保温后回填,让管线不受冻,确保能精品文档放心下载正常使用。对外露水平管可增设泻水口,并派专人开关泻水阀。消防水池采取草帘覆盖谢谢阅读保温.感谢阅读证排水通畅,避免地面沟槽积水。3、所有临电电工必须持证上岗,坚守岗位,随叫随到,确保工地安全和正常施工。谢谢阅读谢谢阅读精品文档放心下载雪天气后,应对线路进行仔细检查,防止断线造成事故。5。2、钢筋施工1、钢筋在运输、堆放、搬运过程中要轻拿轻放,减少碰撞、挤压等现象,以减少谢谢阅读第页GS地库冬季施工方案精品文档放心下载钢筋表面的机械损伤,降低冷脆性。222mm钢筋感谢阅读采用电渣压力焊连接,小于12mm钢筋采用绑扎搭接。谢谢阅读3、钢筋的机械连接对温度要求不大,按常规施工即可。直螺纹连接用钢套筒内不感谢阅读得有雪、结冰.4、钢筋负温焊接,采用电弧焊焊接方法.当环境温度低于—20℃时不得施焊。谢谢阅读5、雪天或施工现场风速超过5.4m/s(3级风)焊接时,采用遮蔽措施,焊接后冷感谢阅读却的接头不要碰到冰雪。6、加工时必须保证二级以上的钢筋的弯弧内直径不小于直径的4倍,并不得在同谢谢阅读一位置来回弯折。7、浇筑混凝土前应对钢筋上的霜、冰、雪等清理干净,浇筑完后及时清除钢筋上精品文档放心下载的预留混凝土.5.3、模板施工本工程混凝土冬施采用综合蓄热法,具体保温措施如下:1、墙、柱:墙、柱采用多层复合模板和木龙骨,该模板有较好的保温性能。感谢阅读2、顶板:模板采用层复合模板加木龙骨,浇注顶板混凝土时门窗洞提前封闭,顶板感谢阅读随混凝土浇筑随铺一层塑料薄膜,上加阻燃草帘被保温,3、顶板、梁模板拆模拆除须根据图纸要求及相关规范的规定。精品文档放心下载模拆除时的砼强度要求见下表))2板8888—-4、墙体的拆模时间要求当混凝土温度降至0℃时,其强度最低达到受冻临界强度精品文档放心下载4MPa,具体时间通过热工计算确定或根据同条件养护试块强度确定。谢谢阅读5、考虑到冬季混凝土强度上升较慢,应增加模板数量,以满足进度需要.谢谢阅读5。4、混凝土施工第页GS地库冬季施工方案精品文档放心下载谢谢阅读为保证冬季施工质量,对混凝土加热、搅拌、运输、浇筑及养护作如下要求:谢谢阅读5.4.1、对商品混凝土材料要求1、混凝土拌合物所用水温控制在80℃范围之内,砂、石、水泥等均应保持正温,具感谢阅读谢谢阅读精品文档放心下载搅拌时间的1.5倍.2、为减少冻害,严格控制水灰比,水灰比小于0。6,尽量降低混凝土中水的用量,谢谢阅读每立方混凝土水泥的用量不得低于300kg,同时加入防冻剂,主要由搅拌站通过试配确谢谢阅读定。具有减水、引气、防冻作用,并掺加砼泵送剂。各种混凝土外加剂要求有市建委认感谢阅读证书、出厂试验报告、复试报告方可使用.混凝土外加剂成份不含氯离子、尿素或氨离精品文档放心下载子成份。感谢阅读定值.在商品混凝土进场时提供正式检测报告,包括砂石产地、碱活性等级、混凝土碱精品文档放心下载含量的评估结果.要求商品混凝土厂家承担20年不发生混凝土碱集料反应损害的相应责谢谢阅读任。感谢阅读强剂和防冻剂,由搅拌站通过试配确定。谢谢阅读5℃,如发现混凝土温度过低或已遭冻结,则作为废品退回搅拌站。感谢阅读5.4。2、混凝土的运输混凝土的运输过程是热量损失最关键的阶段,因此,必须加快运输速度。途中的热感谢阅读量损失不能降低的过快,要求每小时不能超过5-6℃。因此,搅拌站应合理确定混凝土谢谢阅读的出炉温度,并将各种环节的热量损失考虑进去。谢谢阅读在混凝土初凝时间内,并保证混凝土出灌温度不低于10℃,如到现场出灌温度能够满足感谢阅读要求,则灌车不必保温,如不能满足出灌温度不低于10℃,则灌车需采取保温措施。精品文档放心下载2、罐车进场后及时安排浇筑,避免停留时间过长而造成温度降低或离淅现象。谢谢阅读3、施工现场用的地泵管外侧均做保温,采用包裹草帘的作法,并用铁丝绑紧。精品文档放心下载谢谢阅读精品文档放心下载第页GS地库冬季施工方案谢谢阅读保证连续供应。试验人员负责检查砼到达现场质量,对不合格的砼配合施工单位及时采精品文档放心下载取解决措施。5.4.3、混凝土的浇筑1、混凝土浇筑前应及时清除钢筋、模板上的霜冻、冰雪和污垢,对脚手架,作业精品文档放心下载平台上的冻块及时清除,以防滑倒坠落。2、浇筑墙体混凝土前,同时利用外架挂安全网加彩条布封闭挡风,防止冷风直接精品文档放心下载接触施工混凝土接触面。3、混凝土运到作业面以后,应快铺料、快振捣、快抹平,以保证砼入模温度不低于感谢阅读谢谢阅读积,将热量损失降低到最低限度。4、墙体混凝土的浇筑要连续施工,间隔时间不得超过2小时。谢谢阅读谢谢阅读用。6、施工缝的留置符合规范GB50204-2002要求,下次浇筑时,接缝处的混凝土强度谢谢阅读应大于1。2Mpa。5。4。4、混凝土的养护4N/mm2感谢阅读(以同条件养护试块抗压强度为准)。墙体拆模后如混凝土温度与大气温度相差15℃以精品文档放心下载上,应对其表面进行临时保温,使其缓慢冷却,延长强度增长时间,即拆模后砼表面包谢谢阅读裹一层塑料布,并挂设一层阻燃草帘,用铁丝绑好,防止透风,在混凝土冷却到5℃后精品文档放心下载可拆除。谢谢阅读精品文档放心下载3、顶板砼养护:顶板砼浇筑后,在板表面用塑料布覆盖,上面用防火型草帘被覆谢谢阅读盖保温.对外墙边、楼梯口及天井等边角部位覆盖双层保温材料。顶板混凝土在浇注完感谢阅读感谢阅读18mm厚的胶合板,精品文档放心下载具有保温作用,但为了确保砼在板底不受冻,除把下一层的洞口封闭除,还需要用采条谢谢阅读布或帆布封闭下一层.当温度降得太低时,用帆布封闭后还需采取电加热升温措施。楼谢谢阅读板表面的保温层,在混凝土达到受冻临界强度4MPa后方可拆除。混凝土在未完全冷却谢谢阅读第页GS地库冬季施工方案感谢阅读前,具有较大的塑性,同时容易遭受冻害,所以在混凝土尚未完全冷却前不得遭受冲击谢谢阅读荷载和动荷载。在混凝土强度不足1。2Mpa前,不得上人或堆放重物,如模板、钢管等。精品文档放心下载4、砼养护期间严禁浇水,负温时外露部分必须覆盖.谢谢阅读及时采取措施进行处理。5.4。5、混凝土测温1、冬施期间,混凝土必须按规定进行测温,以控制混凝土的施工质量。感谢阅读谢谢阅读2)、测大气温度:室外气温及周围环境温度在每昼夜内测量四次:2:00、8:00、感谢阅读14:00、20:00,记录最高及最低温度。24小时)以前,每2小时测温一次,以后精品文档放心下载每6h测定一次.停止时间由试验室确定.2、测温孔布设1)、测温孔用Φ15塑料管制作,一端封闭,测温时外口用棉花封死,外部留5cm左精品文档放心下载右,温度计留置在测温孔内3分钟以上后读数。测温完成后将塑料管取出,管孔内注浆谢谢阅读填满。150mm。精品文档放心下载5m时设1组,长度大于5m~10m时谢谢阅读设2组。5m×5m留设1组.测温孔深度为板厚或墙厚度的1/2,与楼板谢谢阅读面夹角为45°。3、测温要求谢谢阅读上所指刻度,然后从测温孔中取出温度计,并与视线成水平,仔细读出所测温度,记记谢谢阅读录表上,然后将测温孔封闭。精品文档放心下载应及时告之试验部门,采取增加封闭、覆盖等措施。.谢谢阅读在刚浇完的楼板砼测温时,必须搭设脚手板,禁止踩踏砼.谢谢阅读5。4.6、混凝土试块的制作第页GS地库冬季施工方案精品文档放心下载冬施期间的混凝土试块除按常温施工要求留置外,还应增设3组,一组与构件同条精品文档放心下载件养护,按照热工计算墙体第N天达到临界强度,所以第N天试压,用于检验混凝土拆感谢阅读模时是否达到临界强度,从而确定拆模时间;顶板则根据成熟度计算确定拆模时间,以谢谢阅读混凝土抗压强度报告为依据。另一组与结构同条件养护至冬施结束,转入常温养护28谢谢阅读天后试压,作为混凝土的强度评定依据.第三组备用.为保证同条件养护,试块放置在同谢谢阅读部位的楼层内。5.5、防水施工本工程冬施阶段防水主要屋面防水。精品文档放心下载影响干燥时间和拉伸强度.可将施工时间段集中在上午10:00至下午16:00之间进行,感谢阅读以保证施工条件。5以上进行,如果在低温条件下施工会影响防水卷材与结感谢阅读构的粘贴。可将施工时间段集中在上午10:00至下午16:00之间进行,以保证施工条感谢阅读件。3、为便于成品保护,每个工日的施工量不能过大,最好限定在1000m2以内。施工感谢阅读后养护期间若气温过低,则在施工面上挂黑色塑料薄膜以保持养护需要的温度和湿度。精品文档放心下载谢谢阅读立即进行后续工序施工,以保护防水层。5.6、回填土方谢谢阅读要求外,还应注意以下的环节。1、填土车辆在运输过程中注意防滑。2、回填土方注意预防冻结,可用阻燃草帘采取覆盖措施。回填处的冰雪一定要打感谢阅读扫干净,方可进行回填。3、回填前将坑底冰雪和其它杂物清理干净,方可回填.回填土中不得有大于5cm的谢谢阅读冻土颗粒,小于5cm的冻土颗粒不超过总量的15%,且应分布均匀,严禁浇水夯实.感谢阅读4、回填土时要组织好人力和机具,作到连续施工,因故中断时,对已回填土要进感谢阅读行覆盖,谢谢阅读械夯实,没有工作面的地方,进行人工夯实.5.7、砌筑工程第页GS地库冬季施工方案精品文档放心下载1、所用材料应符合下列规定1)、普通砖、砌块在砌筑前,应清除表面污物、冰雪等,不得使用遭水浸和受冻后感谢阅读的砖或砌块。感谢阅读lcm的冻结块或冰块。谢谢阅读80”C,砂的温度不得超过40”C,砂浆稠度较常谢谢阅读温适当增大。2、砖及砌块在气温高于0℃条件下砌筑时,应浇水湿润。气温低于等于0℃条件下谢谢阅读砌筑时,可不浇水,但必须增大砂浆的稠度,以使砖和砂浆能粘结牢固,防止砖和砂浆出感谢阅读现分离的现象.3、冬期施工搅拌砂浆的时间应适当延长,一般要比常温增减0.5-1倍;冬期施工的精品文档放心下载砖砌体,应按"三一"砌砖法施工,灰缝不大于l5mm。精品文档放心下载4、砌筑砂浆采用加早强防冻剂的措施,是砂浆强度在低温的情况下仍能继续增长,感谢阅读其砂浆早强防冻剂配比按50KG水泥配3KG的早强防冻剂。谢谢阅读5、砂浆在运输、储存的过程中应覆盖保温,砂浆储存时间对于普通砂浆和掺氯砂谢谢阅读浆分别不宜超过15min、20min,附着在运输车上的砂浆每日下班后应及时洗净,以免感谢阅读冻结;严禁使用已遭冻结的砂浆,不得以热水掺入冻结砂浆内重新搅拌使用,也不易在感谢阅读砌筑时向砂浆内掺水使用.6、每天收工前,将垂直灰缝填满,砌筑后应及时在砌筑表面进行保温性覆盖,砌筑表感谢阅读而不得留有砂浆,在继续砌筑前,应扫净砌筑表面。7,在施工日记中除应按常规要求外,应记录室外空气谢谢阅读温度、砌筑时砂浆温度、外加剂掺量以及其他有关资料.8、砂浆试块的留置,除应按常温规定要求外,尚应增设不少于两组与砌体同条件感谢阅读养护的试块,分别用于检验各龄期强度和转入常温28天的砂浆强度。谢谢阅读9、砌筑时砂浆温度不应低于,尚设计无要求时,且最低气温等于或低于15”C感谢阅读时,对砌筑承重砌体的砂浆强度等级应比常温施工提高1级。砌体的日砌筑高度不得超感谢阅读过1.8米。10、冬期施工砖不得淹水,且砌筑后傍晚及时用草帘等保温材料覆盖,防止砌体受谢谢阅读冻。5.8、室内抹灰冬季施工第10页GS地库冬季施工方案感谢阅读进入冬季施工时室内抹灰前用双层塑料布封闭门窗,同时做好施工洞口及出入洞口谢谢阅读的封闭,封闭时还要留一顶数量的可开窗子,以利于通风换气。精品文档放心下载抹灰砂浆使用热水搅拌并掺入防冻剂,其掺量为水泥重量的2~3%,使砂浆内部水谢谢阅读溶液的冰点降低在负温下仍保留自由水,继续水化。可将施工时间段集中在上午10:00至下午16:00之间进行。精品文档放心下载室内抹灰必要时提前几天生火炉以提高室内温度,精品文档放心下载在中午前后开窗换气,同时室内保持一定温度,防止抹灰层空鼓(但注意通风,防止一谢谢阅读氧化碳中毒)对室内抹灰每天进行检查,发现受冻空鼓的抹灰层进行铲除,重新抹灰。感谢阅读室内抹灰的冬施资料如实记录,及时回收整理,妥善保管。谢谢阅读做好室内抹灰的冬季施工的技术交底。5。9、室外抹灰(保温层)冬季施工抹灰砂浆使用热水搅拌并掺入防冻剂,其掺量为水泥重量的2~3%,使砂浆内部水感谢阅读溶液的冰点降低在负温下仍保留自由水,继续水化.可将施工时间段集中在上午1000至下午1600之间,该时间段为正温和有日照感谢阅读时进行,以保证施工条件。室外抹灰在环境温度低于-5摄氏度进停止作业。在负温下及时对外饰面完成部分进行毛毡覆盖,起到保温防冻作用.精品文档放心下载每天进行检查,发现受冻空鼓的抹灰层及受冻的外墙面砖进行铲除重做。感谢阅读室外抹灰的冬施资料如实记录,及时回收整理,妥善保管.谢谢阅读做好室内抹灰的冬季施工的技术交底。六、质量保证措施1、严格按审批后的冬期施工方案进行交底和施工操作,专职质检员进行检查。谢谢阅读2、对原材料质量要求必须有该批产品质量证明文件和进场检验试验报告,合格后,精品文档放心下载方可使用于工程。3、有专人测量温度,控制配合比,外加剂计量严格控制,砂、石含水率及时测量。谢谢阅读4、商品砼坍落度的控制作为重点监控内容,坍落度测量严格按照南京市冬季施工感谢阅读规程操作。5、试块留置数量有代表性,符合现行规范、规程等规定。谢谢阅读6、加强养护保温工作。第页GS地库冬季施工方案感谢阅读7、认真填写隐蔽工程记录、砼冬期施工日报、砼施工记录、砼分项质量检验评定精品文档放心下载表等相关技术资料。8、施工过程严格按照相关冬季施工规范、规程控制施工质量。谢谢阅读七、安全保证措施7。1、建立安全组织机构冬季施工安全领导小组,组长:魏国金副组长:顾晓茹马建黄国林组员:仲跻猴任俊江才胜周仲弢尚春芳王兴化孙爱华邵海谢谢阅读尧王斌。7。2、建立安全、消防培训与教育制度1、冬期施工安全培训冬季施工人员培训:组织有关各专业人员学习有关冬期施工的理论、规范、规定、谢谢阅读冬施方案和施工技术。教育职工注意施工岗位安全,严守各项规章制度。感谢阅读2、冬期施工安全、消防教育1感谢阅读底.配备好安
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024考研数学一模拟试卷|无水印高清
- 过敏性结膜炎诊疗指南
- 鼻腔鼻窦内翻性乳头状瘤临床实践指南(2026版)
- 《摩擦力与物体的运动》教案-2026-2027学年湘科版(新版)小学科学五年级上册
- 2026年世界无车日绿色出行课件
- 橡胶制品厂质量控制细则
- 某汽车制造厂生产流程管理规范
- 印刷厂生产安全操作规范
- 2027届陕西榆林市高三一模物理试题(含解析)
- 初二主题班会《谈早恋的危害》
- T-CPI 11037-2024 石油天然气钻采设备水力振荡器技术与应用规范
- 冀教版四年级上册除法竖式计算题200道及答案
- JT∕T 1496-2024 公路隧道施工门禁系统技术要求
- 纳米纤维课件
- 2020风电场设备事故现场处置方案
- 2021废(污)水处理用复合碳源
- 混凝土及原材台账表格
- 架空导地线-液压压接(郭学闻)
- 技师培训交直流调速
- GB/T 9239.1-2006机械振动恒态(刚性)转子平衡品质要求第1部分:规范与平衡允差的检验
- 《绿色建筑概论》整套教学课件
评论
0/150
提交评论