绿色施工和降本增效“小、特、新”措施目录一、环境保护措施·································································5二、节材措施······································································11三、节水措施······································································36四、节能措施······································································42五、节地措施······································································50六、设计优化与商务相结合····················································52七、方案优化与商务相结合····················································78八、降本增效措施································································93九、新材料、新设备、新机械应用·········································110十、创新应用技术及施工技术···············································133十一、BIM应用··································································175十二、质量通病防治措施·····················································183八、降本增效措施3消防永临结合技术实施/优化效果:利用建筑原有设计部分代替临时施工,大大减少施工成本,避免二次施工。适用工程/范围:某项工作是正式建筑中的一部分(永久性质的),同时在施工时也需要该项工作的所具备的功能的所有建设工程。基本要求:1、技术创新:采用正式管道,取代临时消防水管道和施工养护水管道,布局合理,观感质量好,减少管线铺设,避免了临时管道的投入及拆除,提高施工效率,降低施工成本。2、技术特点:永临结合管道施工方式,将取消临建安全消防水管及施工养护水管,大大减少材料投入、劳动力投入,避免重复施工,缩短工期,同时利用原设计位置布置管线,合理化程度更高,更加便捷,解决了楼外加固水管费工费力的难题。现场实际运用图片4道路永临结合实施/优化效果:施工简洁,降低成本,缩短施工周期。适用工程/范围:某项工作是正式建筑中的一部分(永久性质的),同时在施工时也需要该项工作的所具备的功能的所有建设工程。基本要求:1、技术创新:结合EPC管理优势,可提前将总图内正是道路边线及标高定位提前设计并开展临时道路施工,将临时道路作为正式道路的路基;在降低成本的同时大大的提高了施工功效。2、技术特点在收到施工图之后,按照图纸中正式道路的走势进行临时道路的深化,将临时道路作为正式道路的一层路基施工;此做法可更好的提前穿插施工,提高功效,节约工期。现场实际运用图片做法示意图5围挡基础永临结合实施/优化效果:施工简洁,降低成本,缩短施工周期。适用工程/范围:某项工作是正式建筑中的一部分(永久性质的),同时在施工时也需要该项工作的所具备的功能的所有建设工程。1、技术创新:结合EPC管理优势,可提前将总图内围挡边线及标高定位提前设计并开展正式围挡基础施工,充分的做到了永临结合;在降低成本的同时大大的提高了施工功效。2、技术特点:临时围挡立柱采用四根M12膨胀螺栓固定在条基下级大放脚处平面处,待正式围挡安装时将其拆除。正式围挡立柱可直接焊接在短柱顶端预埋钢板的位置;此做法可更好的提前穿插施工,提高功效,节约工期。现场实际运用图片做法示意图6地下室外墙单侧支模技术基本要求:1、技术创新:针对地下室外墙贴近支护体系的工况,制作型钢工具式单侧支模三角架,三角架现场拼装、整体加固,特别是针对地下室外墙厚度大、层高变化的情况下,设计标准节和加高节灵活拼装的工具式型钢单边支模架体,并增加架体底部角点加固方式,在实施中验证了钢架具备抵抗混泥土侧压力的足够刚度和稳定性。2、技术特点:(1)三角架可以根据外墙层高组合拼装,能够满足不同高度外墙的单侧支模施工。(2)墙模与吊装型钢模架整体加固安装,工作效率高,周转快,地下室每层可周转多次。(3)能保证混凝土成型质量、接缝及墙面平整度及垂直度。现场实际运用图片实施/优化效果:保证混凝土成型质量,能够满足不同高度外墙的单侧支模施工,以适应地下室层高的变化。适用工程/范围:针对地下室外墙贴近支护体系的工况,外墙厚度加支护桩间隙填充混凝土的厚度总和较大。7定型化拼装木模板施工体系的应用实施/优化效果:制作方便,安拆便捷,周转率高,加快施工进度,减少劳动力的投入,成品质量效果好。适用工程/范围:适用于高层建筑和超高层建筑。基本要求:1、技术创新:定型化拼装模板具有安拆简单快捷,减少了施工安拆过程的劳动量,降低了工人劳动强度。其次墙面出模后实测实量效果明显,成品表观质量良好,节省了主体结构质量缺陷的维修费用。定型化拼装模板避免了再次配模的材料浪费,提高材料的周转率。2、技术特点:(1)拼装定型化木模板材料质量强度、刚度及整体性比传统木模板体系更有保障,并能确保混凝土浇筑过程中模板体系变形控制在1~5mm范围内。(2)拼装定型化木模板对于混凝土边角及细部结构施工更为精细,模板拼接更严密,有助于工程质量的提高。(3)拼装定型化木模板通用性强,构造简单,制作方便,易装易拆,更能加快施工进度,减少劳动力的投入。(4)配合拼装定型化木模板体系的是轮扣式脚手架支撑体系,安拆方便,整体性稳定,更能满足施工安全技术要求。根据加工图将材料一一编号将编号的材料拼装组合拼装模板现场制作拼装式木模板成品施工实际运用图片成品表观质量效果8插槽式楼梯踏步工艺施工做法实施/优化效果:具有可周转性,节约成本,节省工期;加固后整体性好,安全性强。适用工程/范围:适用于楼梯梯板侧无剪力墙的楼梯基本要求:1、技术创新:采用木胶合板模板施工,侧模切槽的方式保证楼梯踏步施工质量2、技术特点:①梯段板侧模板切割踏步高度方向凹槽;②踏步高度方向模板采用双层1.8厚覆膜模板中间夹木枋制作;
③铺设板底及侧面模板,待楼梯钢筋绑扎完成后安装踏步板,采用对拉螺杆进行加固,保证楼梯模板的刚度;
④经隐蔽验收合格进行混凝土浇筑,专人负责踏步收面施工,做好成品保护工作;⑤待强度达到2.5Mpa后方可拆除楼梯侧板和踏步立板,可周转到下一层楼梯施工。现场实际运用图片9三角架在型钢悬挑脚手架中的应用实施/优化效果:避免钢梁和钢梁之间密集堆积、减少混凝土墙体开洞,避免暗柱钢筋及混凝土的损坏等优点。适用工程/范围:适用于悬挑式型钢脚手架主体存在结构阳角等位置。基本要求:1、技术创新:型钢悬挑架在阳角部采用定型三脚架替代传统钢梁重叠辐射式铺设,避免在结构暗柱预留洞,从而避免影响结构质量风险。2、技术特点:型钢三脚架取代传统钢梁铺设,可单独使用,也可与联梁配合使用。其优点为避免钢梁和钢梁之间密集堆积、重叠现象;减少混凝土墙体开洞,避免了暗柱钢筋及混凝土的损坏,影响结构的实体质量,且三脚架一次成型,能多次重复利用,周转使用,搭设完成后架体外观美观、整齐。现场实际运用图片10改进悬挑架三角撑应用实施/优化效果:安装方便,解决楼层阳角部位外架悬挑问题,节省工期。适用工程/范围:适用于悬挑式型钢脚手架主体存在结构阳角等位置。基本要求:1、技术创新:阳角部位空间有限,按传统预埋工字钢的方法,阳角位置难以布置,且剪力墙需预留洞口,后期洞口封堵难以处理,拆除困难。若采用18#槽钢做的2700×1200×2500mm三角撑,笨重且必须用塔吊配合安装,安装费时费力。2、技术特点:新型改进型小三角撑采用70×70×6mm和90×90×6mm方钢管制作1200×1000×1500mm小三角撑,操作方便,每个三角撑只需两人配合即可安装,节省工期。现场实际运用图片做法示意图
小三角撑效果图11可提升式电梯井钢平台的应用实施/优化效果:可提升式电梯井钢平台的应用替代传统钢管搭设简易操作架,避免发生安全隐患。适用工程/范围:适用于主体结构施工阶段。基本要求:1、技术创新:可提升式电梯井钢平台与结构连接稳定,在平台上作业安全可靠,并且吊装方便。这个方法将原来要6-7次完成的电梯井道施工平台、模板的吊运,能够用一次吊运完成并可以安装,大大减轻了工人的劳动强度和塔吊的施工效率。2、技术特点:电梯井钢平台提升时,确保钢施工平台的平整度和电梯井钢施工平台与电梯井道边有50mm左右的空隙,保证钢平台提升时在井道内有比较理想的吊运空间,而且钢平台周转率可达到100次以上。现场实际运用图片12做法示意图成品卸料平台应用实施/优化效果:施工安全性更高,安装更加便捷,可周转使用。适用工程/范围:高层、超高层工程。基本要求:1、技术创新:成品卸料平台是由厂家生产制作,运至现场组装完成并投入使用,相比传统卸料平台安装更为简便、使用更为可靠。2、技术特点:成品悬挑卸料平台与普通自制卸料平台相比,易于控制其安装质量,工字钢可更换尺寸,对于多栋、结构变化较多的项目较为适用。
现场实际运用图片做法示意图13电梯联动翻板的应用实施/优化效果:优化施工工序,减少施工成本,提高施工安全性。适用工程/范围:施工电梯。基本要求:1、技术创新:常规施工电梯吊笼与结构边缘存在较大间隙,存在高空坠物的隐患,易引发安全事故,采用联动翻板进行防护,能够有效解决吊笼门与结构边缘之间的间隙,提高安全性能。相比较常规施工升降机,在电梯拉链收口施,不需搭设外架,不需安装悬挑构件,施工操作简单方便,并且减少施工成本。2、技术特点:联动翻板防护装置采用钢制翻板、转动轴和施工电梯门组成联动系统,翻板随着电梯门的开启而向下翻转,在吊笼与结构边缘之间形成施工通道,起到防护作用,电梯门关闭时翻板向上翻转折叠。
现场实际运用图片14施工升降机基础回顶实施/优化效果:采用原有成品钢格构,避免重新购买增加项目成本,并且能够保证施工升降机基础的安全稳定使用。适用工程/范围:施工升降机基础位于地库顶板。基本要求:1、施工升降机基础直接位于地下室顶板上,为避免地下室顶板破坏造成安全事故,在施工升降机安装位置标准节正下方采用格构柱进行支撑。2、利用原成品钢格构柱代替原设计方案要求的格构柱。3、在两层地下室采用原成品格构柱进行施工升降机基础回顶,并且在升降机梯笼下部采用钢管架回顶加固,钢管回顶加固面积为4000mm×6000mm。现场实际运用图片格构柱立面图15铝模板配套精准砌块实施/优化效果:高精砌块墙体及薄抹灰系统应用适用工程/范围:应用铝模的住宅项目(标准层)现场实际运用图片基本要求:高精度砌块施工,慢慢的取代了传统的普通砌块施工的模式,提高了施工精度,节省了施工成本。高精砌块比普通砌块在尺寸上有了更高的要求,它是墙体薄浆砌筑和薄抹灰甚至免抹灰的必要要求。砌筑灰缝厚度薄,有效减少墙体收缩、下沉,减少墙体、抹面开裂,后期墙体薄抹灰甚至免抹灰减少了墙体开裂、空鼓等质量通病的产生。采用铝合金模板,墙体垂直度、平整度控制较好,配合高精砌块砌筑,实现墙体薄抹灰,大大减小了砂浆的消耗;墙体砌筑前进行排砖深化设计,砌块采用台锯集中加工,减少材料浪费,加快施工进度。排砖深化设计图16轻质条板隔墙的应用实施/优化效果:减少地材的使用,施工更加环保,安装便捷,减少劳动力投入,加快施工进度。适用工程/范围:框架结构工程。基本要求:1、技术创新:轻质条板为创新性环保材料,将传统的砌砖隔墙进行施工优化,工人操作便捷。相比传统的加气块隔墙施工,节约了砂、水泥、水等资源,并采用机械架板安装,减少劳动力投入,加快施工进度缩短工期,且施工更加环保。2、技术特点:将定型尺寸的轻质条板人工搬至立板机上进行对接拼装,使粘合剂均匀填充接缝,使凹凸楔口连接紧密,互相咬合;在转角墙、T型墙条板接高处,沿高度每隔700~800mm斜向45°角钉入铁钉进行加固,铁钉应随条板安装时钉入;轻质条板与结构之间采用螺栓固定,墙长大于4m中部设置一个方钢构造柱;板底缝内用干硬砂浆填塞密实,隔墙板竖向接缝采用注浆机注满胶泥填充。现场实际运用图片17成品模具吊洞技术实施/优化效果:节约成本;质量效果显著;具有可周转性。适用工程/范围:高层建筑楼板。基本要求:1、技术创新:采用成品模具吊洞技术,取代传统胶合板堵洞技术,施工速度快,安装方便快捷。可一人在楼下独立操作,拆模迅速。提高施工效率,施工后,墙壁和管道干净整洁,无需后期再投入人工清理凿磨。2、技术特点:采用穿楼板管孔洞采用吊洞成品模具,由于模具的重复利用,节约模板,满足防渗漏要求,杜绝铁丝吊洞,减少渗漏风险,减少吊洞厚的顶棚不平整等质量问题并取得了一定的经济效益。现场实际运用图片18高压线标准节组装周转使用技术基本要求:1、技术创新:优化后的高压线防护方案,参考塔吊标准节原理,分段制作角钢架标准节,便于吊装和螺栓连接,后期可周转至其他项目使用。
2.、技术特点:(1)分段制作型钢架标准节。(2)小吨位汽车吊吊装方便。(3)标准节螺栓连接,组装速度快。(4)后期可多次周转使用。现场实际运用图片实施/优化效果:参考塔吊标准节原理,采用可周转标准节进行组装,可多次周转使用。适用工程/范围:塔吊臂回转半径内的高压线警示防护钢架。做法示意图19九、新材料、新设备、新机械应用20高空作业平台实施/优化效果:可周转使用,提高工效,节约材料。适用工程/范围:基坑内支撑施工阶段,支撑梁底垫层和模板的拆除作业。基本要求:1、技术创新:高空作业平台用于基坑内支撑施工阶段,支撑梁底垫层和模板的拆除作业,可代替施工脚手架降低施工措施费用。2、技术特点:高空作业平台是由升降台和汽车配套改装而成的。它接取汽车引擎动力,实现升降台的升降功能。采用H型液压支腿,保证机器升降的稳定和作业的安全。可采用DC直流独立动力源,实现升降机的旋转、升降功能。适用于工作面广和幅度大的高空作业产品具有作业范围大,持续作业时间长等特点,现场实际运用图片21全自动数控弯箍机实施/优化效果:自动完成钢筋定尺、调直、切断、弯箍,快速、省人工、省材料。适用工程/范围:房建类工程。基本要求:1、技术创新:电脑数控全自动钢筋弯箍机通过全智能高集成控制实现了从钢筋送料,去氧化皮,校直延伸,弯曲成型,切断多种工艺单机一体活,能直接制作多种尺寸多种规格的箍筋,完全达到了设计要求。2、技术特点:全自动钢筋弯箍机生产设备,采用智能控制,可以加工多种尺寸多种规格的方形,矩形,菱形、多边形等,同时具有校直功能,一机多用。同时通过微机编程控制电机传动,动作准确、噪音小,生产率高。现场实际运用图片22木塑木方实施/优化效果:规格尺寸精确度高,节约木材,支撑操作便捷,节省工期,环保节能,可周转。适用工程/范围:适用于木模板施工项目。基本要求:1、材料介绍
木塑木方是以废塑料为基材,加入木纤维等增强材料,经材料混合、高温挤塑成型;2、材料特点(1)木塑木方材料产品既环保又节能;(2)生产设备、工艺简单,可以切割成任意长度,可以替代普通木方。(4)产品性能稳定、易清灰,能承受各种施工负荷;(5)使用寿命5年以上,可在-20℃~+60℃气温条件下施工不变形,周转次数在50次以上;(7)木塑木方成本最终可以做到“零成本”,可以大大降低工程成本,如果由租赁站统一采购,在公司内部各项目周转使用,可以大大降低各项目的成本。(8)支撑操作便捷,不需铁钉、容易清洁和保养,可大大加快施工进度,缩短施工工期。现场实际运用图片23数字化钢性建筑模板支撑组合体系实施/优化效果:该加固体系具有重量轻、弹性大、承载力高、操作方便、周转率高。适用工程/范围:适用于竖向结构框架柱、剪力墙模板支撑体系加固。基本要求:1、技术创新:数字化型钢加固组合是由竖梁、横梁、阴阳角、过口卡、接头等材料组成的新型墙柱模板加固体系,它是独有的可调节剪力墙模板支撑。2.、技术特点:该加固体系具有重量轻、弹性大、承载力高、操作方便、周转率高等优点。数字化型钢加固体系体系摒弃传统支模方式中的钢管木枋组合,它是独有的可调节剪力墙模板支撑,可以完成清水墙一次成型施工,避免二次抹灰,大大节省施工成本,提高施工效率。现场实际运用图片24矩形柱模板新型紧固件实施/优化效果:矩形柱水平背楞采用新型紧固件,与常规双钢管背楞相比,省掉了穿墙螺杆紧固及后续的处理,提高施工效率及施工质量。适用工程/范围:结构中方形柱及矩形柱较多工程。基本要求:1、技术创新:根据矩形柱不同尺寸,选用不同规格的方圆单弯可调式紧固件,在柱加固中只需调节卡板尺寸即可,便捷高效。2、技术特点:方圆单弯可调式紧固件与常规双钢管背楞相比,省掉穿墙螺杆及螺杆对拉紧固措施,只需用插销调解背楞的紧固,大大减少材料投入、劳动力投入,缩短工期,成本较低,同时混凝土成型质量相对常规做法有较大的提升。现场实际运用图片25水泥加压板防水保护层的应用实施/优化效果:水泥加压板的应用取代了水泥砂浆挂钢丝网的传统做法,施工更加便捷,且外观美观等优点。适用工程/范围:适用于地下室防水工程立面及侧面防水保护层。基本要求:1、技术创新:水泥加压板是以天然纤维和水泥为原料,经制浆、成型、切割、加压、养护而成的一种新型建筑板材。属于新一代”绿色“建材,具有轻质、高强、防水、防腐、防火、幅面大、加工性好、提高施工效率等优点。2、技术特点:应用于独立基础下返柱墩侧壁,主楼及车库四周挡墙内侧立面位置以及排水沟、电缆沟基础四周侧壁防水基层位置。水泥加压板的应用取代了水泥砂浆挂钢丝网的传统做法,取得了很大的经济价值,施工方便,避免重复施工,一次成型,适用于地下防水保护层面。现场实际运用图片26提升式布料机实施/优化效果:结构稳定可靠,转动灵活,可任意改变布料方位,减少泵管振动对楼板质量的影响。适用工程/范围:适用于高层建筑和超高层建筑。基本要求:1、设备介绍布料机:布料机是混凝土输送中的终端设备。它通过混凝土泵管与输送泵连接,有效的解决了建筑现场浇筑布料的难题。提升式布料机:此类布料机基础位于电梯井,采用塔吊进行布料机的提升,每次浇筑混凝土前提前预留布料机基础伸缩杆空洞,待该层施工完成后,将布料机基础提升至预留空洞位置,进行下一层混凝土浇筑。2、设备特点(1)具有结构稳定可靠,转动轻便灵活。(2)采用全回转臂架式布料结构,360°全方位正反向回转,回转半径可任意调节,手动操作,任意改变布料方位。(3)布料机基础和结构有可靠连接,水平荷载不会对混凝土结构的垂直度有影响。(4)布料机基础和结构有可靠连接,安全隐患相比传统布料机而言更小。(5)泵管从在电梯井固定,避免了施工荷载对楼板产生的震动,减少楼板的裂缝。现场实际运用图片27商业采光顶可移动钢结构支撑平台技术实施/优化效果:节约成本;节省工期;安全性强;具有可周转性。适用工程/范围:大型商业采光顶工程。基本要求:1、技术创新:采用钢结构移动施工平台,取代钢管脚手架支撑体系,工人操作安全便捷,同时可以进行周转使用,降低成本,提高施工效率,经济效益显著。2、技术特点:可移动施工钢平台施工技术,代替了原钢管脚手架操作平台技术,大大减少材料投入、劳动力投入。采光顶采用钢结构支撑,分成两个部分椭圆形采光顶和长廊采光顶,所有钢材材质为Q235B。钢架间的连接采用焊接,焊缝强度为二级。施工平台适用于大型商业采光顶工程解决了采用大量钢管脚手架施工的难题。现场实际运用图片28钢平台主梁自动监测的应用实施/优化效果:监测效果明显,节约施工成本。适用工程/范围:钢结构工程。基本要求:1、技术创新:通过此装置的设置,将能以最低的成本,最直观、精确地的起到监测钢平台变形的效果,以便可提前对变形较大部位做相应调整及整改,对工程安全、成本、工期等均具有重要意义。2、技术特点:在钢平台主梁正弯矩最大的位置设置该监测装置,该装置是由两组感应金属片、金属导线及两个不同颜色的灯泡组成。两组金属片相向交叉设置,其之间距离分别为5mm和10mm,均小于钢构件最大变形量。当构件逐渐发生徐变时,两组金属片将会先后产生搭接。由此便能得知钢构件是否已接近最大变形极限值(其中白色灯泡发亮为预警,红色为警报)。
现场实际运用图片29全刚附着式升降脚手架应用实施/优化效果:安全性能高、文明施工效果好,经济性好,降低高坠风险。适用工程/范围:高层建筑。基本要求:1、技术创新:全钢附着式升降脚手架是一种采用导轨式升降、电动控制、整体网片防护、定型化钢龙骨的爬架体系。根据设计图纸在工厂深化加工完毕,现场塔吊拼装,安全可靠性高。2、技术特点:全钢附着式升降脚手架所有材料均使用钢材,防火性能好;现场文明施工效果好,简洁、简便,实用性强;升降和监控采用智能化;仅拆卸时占用塔吊,绿色环保,节能减排。
现场实际运用图片30做法示意图(变频型)施工升降机实施/优化效果:(变频型)施工升降机的应用针对性的解决了外用电梯耗费电量高的问题。适用工程/范围:适用于二次结构装饰装修工程。基本要求:1、技术创新:
变频施工电梯具有可调速的功能,运行速度可根据工程进展速度自由调整。带有变频功能的电梯,在启动,运行,刹车各个环节运行都非常平稳,避免了突然起步,运行摇晃不稳定,刹车急停等情况,也在一定程度上增加了电梯的使用寿命,变频施工升降机比传统施工电梯更加节省能源。2、技术特点:不仅节约了用电量,其机械性能优越,调速范围灵活,且平层控制好等等,乘坐无失重超重感觉。(变频)型施工升降机(变频)型施工升降机现场实际运用图片31工具式悬挑防护棚实施/优化效果:施工安全性更高,安装更加便捷,可周转使用。适用工程/范围:高层、超高层工程。基本要求:1、技术创新:工具式悬挑防护棚,将防护棚网片做成单元式,统一在地面进行加工,相比传统悬挑防护棚,工人操作更加安全便捷,同时可以进行周转使用,降低成本。2、技术特点:工具式悬挑防护棚利用钢管焊接成固定的防护棚单元框架,在钢管框架上固定双层铁丝网,铁丝网上固定一层安全平网,形成一个防护棚单元。每个防护棚单元设两个连接件,连接件采用两块铁板焊接而成,每个防护棚单元斜拉两根钢丝绳到上一层结构边,钢丝绳一端拉在防护棚单元挑出端外侧框架钢管上,一端通过钢丝绳连接件拉到上层架构边。
现场实际运用图片做法示意图32非固化橡胶沥青防水涂料应用实施/优化效果:非固化橡胶沥青防水涂料应用适用工程/范围:建筑地下室、屋面非外露平面防水工程;特别适用于变形较大的防水部位和防水等级要求高的工程。现场实际运用图片材料主要性能指标及自愈性特点基本要求:利用非固化橡胶沥青防水涂料代替传统的高分子防水涂料,优化施工工艺,改善防水效果,降低成本,节约工期。该种材料由优质石油沥青、合成橡胶及特种添加剂制成,施工后不固化,具有自愈合功能的弹塑性膏状防水材料。非固化橡胶沥青防水涂料的特点包括:永不固化、基层适应性好、粘接性高、自愈性强、耐久性、耐疲劳性、耐高低温性、延伸性及低温柔性均较好,施工简便,效率高,无需养护期,效率高,节省工期。该防水涂料即可单独作为一道防水层,又能与其他防水卷材共同组成复合防水层;对于不规则结构及边缝可一次成型,可深入基层微小缝隙,堵漏维修效果好。
33现场水电套管采用预制防水止水器实施/优化效果:采用预制止水器代替后期堵洞。适用工程/范围:卫生间、厨房水电套管。基本要求:1、技术创新:
在模板支设过程中将需要预留套管部位预埋止水器,固定在模板上。2、技术特点:
采用预埋止水器代替普通预留洞,大幅度降低后期厨房、卫生间的地漏、管根、烟风道等易发生漏水部位的渗漏隐患。现场实际运用图片34新型落水管止水节应用实施/优化效果:浇筑混凝土前预埋,省却后期吊洞,止水效果良好。适用工程/范围:适用于存在落水管道安装的现浇钢筋混凝土工程。基本要求:1、技术创新:取代原有的预埋木盒子或者泡沫板的做法,省却了后期吊洞的人工材料费,且大大降低了吊洞后的渗漏风险。2、技术特点:适用于厨卫间阳台等有落水管安装、且存在渗漏风险的部位,后期管道可直接安装,无须吊洞,本身自带止水效果。现场实际运用图片35恒温恒湿箱实施/优化效果:可进行全自动切换工作,从而提高标准养护条件规定的温湿度的准确度和自动化控制水平、降低能耗,保证混凝土养护质量。适用工程/范围:混凝土试块标准养护基本要求:1、技术创新:可恒温恒湿养护箱采用先进的智能化温湿度控制系统,能准确地指令升温,降温和增湿等功能,提高了混凝土试块养护质量。2、技术特点:
出厂时仪器已编入标准设定程序,温度控制值为20.0℃±1.0℃,湿度控制值为95%±1.5%,避免了操作失误造成混凝土试块出现质量问题;容量较大,每台可放150混凝土试块60组;因其箱式结构,整体摆放节约场地,方便运输。现场实际运用图片36电动扳手实施/优化效果:电动扳手是以电池为动力的扳手,是主要紧固螺栓的工具。适用工程/范围:施工现场所有涉及的紧固类螺栓工具,代替原手动扳手。基本要求:1、技术创新冲击电动扳手主要是初紧螺栓的,它的使用很简单,就是对准螺栓扳动电源开关就行。电动定扭矩扳手既可初紧又可终紧,它的使用是先调节扭矩,再紧固螺栓。2、技术特点(1)使用寿命长(2)手柄和机壳材料散热性好(3)功率大(4)耐撞击性强(5)使用性价比最高。(6)操作方便(7)省时省力(8)安全方便使用高级锂电技术,使寿命延长400%,并拥有超长的电池使用时间。37现场实际运用图片电动助力手推车应用实施/优化效果:利用电力驱动解放人力驱动,提升工作效率、降低人工成本。适用工程/范围:主要用于小宗物资水平运输,代替人力独轮、双轮手推车。基本要求:1、技术创新:采用电动助力手推车,取代人力独轮、双轮手推车。提升单次装载运输量的同时,减少单次运输时间,整体提升施工效率,降低人工成本。2、技术特点:电动助力手推车可大量节省人力用工,提升施工机械化水平。电动助力推车本身应用范围广,运载无法码放的物资时,四周可安装挡板,形成斗式推车;运载规则、可码放的物资时,可将挡板拆去增大运输量。电动助力的同时配有三轮支点,比传统手推车移动更平稳,一定程度减少物资倒运过程中的损耗。现场实际运用图片38二次结构小型浇筑机械实施/优化效果:省人工、省材料、提高工作效率适用工程/范围:二次结构基本要求:全机械化操作,是人工浇筑混凝土速度的几倍,缩短了施工工期。浇筑混凝土连续性好,输送效率高,节约了劳动成本。
现场实际运用图片39智能感应门禁系统实施/优化效果:通过智能感应门禁系统,及贴在安全帽内的感应芯片,实现工人实名制及考勤功能等。适用工程/范围:施工现场出入口。基本要求:1、技术创新:智能感应门禁系统配合贴在安全帽内的感应芯片,工人在通过道闸时,自动感应开关门并记录工人信息。2、技术特点:实名制考勤、闸机感应开关功能、现场施工人数、工种统计。现场实际运用图片门禁芯片道闸顶部安装门禁芯片感应器40施工管理信息化技术实施/优化效果:适应现代化项目管理的要求,在施工管理中使用不同的信息化技术。适用工程/范围:管理的各个层次现场实际运用图片基本要求:为提高工程项目在施工管理中的科技含量,现场积极推广安全信息化管理,塔吊安装防碰撞系统,每日进行监测,保证安全运行;施工升降机笼内安装人脸识别系统,可杜绝无证私自开启电梯的现象;现场设置视频监控系统(手机APP与电脑端互联)、自动语音播放系统等,从信息化上加强管理从而减少安全事故的发生。项目部积极推广人员、机械二维码信息化管理,把人员的基本信息、工种、操作章程和大型机械信息制作成二维码,通过手机扫二维码可知道人员和大型机械信息。41无人机航拍实施/优化效果:采用无人机航拍技术,全新角度观看现场施工情况,了解项目整体运行状况,对施工判断和决策提供依据,同时便于对项目整体进度以及安全文明施工进行布控和调整。适用工程/范围:有条件的所有工程项目。基本要求:1、技术创新:无人机航拍结合计算机图形处理技术,合成项目360°全景照。2、技术特点:在短时间内将项目各区段施工情况进行捕捉,对比进度计划,直观、有效的表现进度变差情况。现场实际运用图片42十、创新应用技术及施工技术43基坑内支撑拆除阶段提高格构立柱稳定性施工技术实施/优化效果:方便快捷、可重复性使用适用工程/范围:内基坑阶段需要提高格构立柱稳定性的基本要求:本技术易于施工且适用性强,通过在各层结构立柱根部位置设置水平角钢约束点来固定立柱,水平角钢为组合拼装形式,可重复周转使用。采用此技术可以大大提高立柱拆除施工的安全性,且在保证工期的同时减少立柱拆除施工的成本。现场实际运用图片44基坑支撑立柱节点钢筋优化处理技术实施/优化效果:降低了因节点处施工所造成的工期延误。适用工程/范围:基坑支撑立柱工程。基本要求:当支撑立柱外包混凝土可凿除时,对于无法贯通设置的底板底筋,在钢筋一端弯折并焊接在基坑支撑立柱钢板上。当支撑立柱外包混凝土不可凿除时,底板底筋植入基坑立柱内15d,长度达不到要求的需在立柱边增设同等数量的附加钢筋。混凝土柱穿过深基坑承台侧壁的节点钢筋施工做法:承台底筋需植入混凝土立柱内15d,并留出1.4La的搭接长度;承台底筋在混凝土柱边需向上弯折,平直段长度为14d且大于300mm。
现场实际运用图片45基坑内支撑装配式换撑技术实施/优化效果:解决了工程中的技术难题,加快了换撑施工速度的情况下,保证了基坑安全。适用工程/范围:基坑內撑支护工程。基本要求:1、技术创新:通过焊接在钢管两侧的法兰盘,将钢管斜撑标准构件与两端部钢管构件连接。安装完成后,在钢管上焊接应力计。进行换撑结构件内力的监测。通过装配式钢管斜撑将地下室外墙、底板或楼板上的混凝土墩连接在一起,再通过混凝土传力带将支护桩所受应力传递到地下室外墙。2、技术特点:通过换撑体系,可将原内支撑构件所承受的部分水平应力消散到主体结构水平构件中,减少支护结构变形。。现场实际运用图片46抗浮锚杆后施工工法基本要求:1、技术创新:先施工地下室结构,按照锚杆位置预留钢套管并进行防水处理。地下室结构施工完成后,抗浮锚杆后施工的封锚及防腐防水处理。2、技术特点:采用先施工地下室结构、后施工抗浮锚杆的工法,改变关键线路施工顺序,可以高效的交叉作业、减少施工场地影响,缩短总工期。采用液压型潜孔锚杆钻机成孔(边加钻杆边加套管),锚孔采用跟管钻进,并且利用喷油螺杆空压机产生的高压空气进行排渣,工作效率高。47实施/优化效果:减少施工场地影响,缩短总工期,工作效率高。适用工程/范围:结构自身重量不足以抵抗地下水上浮力及体型较大的建筑。现场实际运用图片南方粘土场地物流项目独立承台土胎模施工技术实施/优化效果:通过施工过程质量检查监控,达到预期施工要求。适用工程/范围:类似场地承台土胎膜工程。基本要求:1、技术创新:清除基底表层杂填土层,拌制2:8灰土换填,分层厚度300mm为宜,采用18t压路机纵横碾压三遍;采用垂直下挖,将基坑90°垂直侧壁,作为独立承台施工模板,基坑四周侧壁及基坑顶面铺设雨布彩条布,上部超出坑边1m长,坑底预留100mm长压入混凝土垫层。2、技术特点:大大减小承台基坑土方开挖量,减少对原有土体的扰动,减少后期土方回填量和压实步数,同时,基坑开挖尺寸小,利于雨季施工。现场实际运用图片48电梯井坑中坑施工技术应用实施/优化效果:减少坑中坑施工中高压旋喷桩的数量,节省成本,节约工期。适用工程/范围:坑中坑施工。基本要求:
1、将坑中坑施工中利用高压旋喷桩“五面封”(即坑中坑四周及底部均采用高压旋喷桩进行封闭)的施工工艺进行改良。取消底部高压旋喷桩封闭,改为增设降水井的方式,达到坑中坑施工过程中的降水效果。待坑中坑施工完成,环境稳定后停止降水。
2、降水井的位置及数量根据现场实际情况,经设计院同意后进行设置。“五面封”设计施工图优化后设计施工图49钢沉箱阻水施工技术实施/优化效果:相比降水施工,减少施工费用、缩短施工工期、地下水源得到有效保护。适用工程/范围:有地下水的坑中坑工程。基本要求:沉箱包括有箱壁和箱底,箱壁的内侧沿水平向连接有背愣,箱壁的外侧沿垂直于箱壁的方向连接有锚固钢筋并沿着箱壁间隔布置,箱底上开有孔洞,对应孔洞位置处连接有竖向短管及阀门,沉箱装置中位于对侧的箱壁之间设有水平支撑。含有沉箱装置的基坑结构,沉箱水平切面与基坑的水平切面相适应,沉箱底端与基坑底板垫层的底面平齐,沉箱顶端不低于基坑的顶面;沉箱壁外侧浇筑混凝土层(含钢筋),沉箱底浇筑有箱底外保护层;沉箱箱壁内侧、紧贴箱壁上设有承压板,沉箱装置的箱底上浇筑有箱底内混凝土层。现场实际运用图片50基坑后浇带传力构件施工技术实施/优化效果:通过叫简单的钢管传力结构,满足后浇带两侧水平力传递的要求。适用工程/范围:深基坑沉降后浇带传力工程。基本要求:深基坑传力构件体系主要为传力钢管,传力钢管水平设置在后浇带的上面,两头分别埋在后浇带两边的主体结构内。在钢筋绑扎过程中,传力钢管位于主体结构的面筋下并与其固定绑扎,两头分别箍有井字钢筋,井字钢筋与上下层绑扎固定。沉降后浇带一般要求高层建筑结构封顶之后方和进行浇筑,为解决后浇带传力问题,在后浇带两侧底板或或楼板间做钢管传力构件,通过计算,既可以满足后浇带两侧水平力传递的要求,又能使后浇带两侧有一定的沉降差。现场实际运用图片51桩头防水封堵及二次注浆堵漏施工工法基本要求:1、技术创新:运用法拉格防水卷材代替一般卷材,采用液态防水材料与防水卷材相结合的方法,取得良好的防水效果;采用浇筑环氧砂浆以及密封防水收头。2、技术特点:易于实施,防水效果好,解决了桩头易渗水的质量通病。52实施/优化效果:防水效果显著提高。适用工程/范围:建筑施工现场桩头部位的防水收头及底板浇筑完毕后桩头处的堵漏。现场实际运用图片铝框PPR模板应用实施/优化效果:具有可周转性,节约成本,安全性强,成品效果好,完成墙面可以免抹灰。适用工程/范围:适用结构模板施工。基本要求:1、技术创新:施工周期短,铝模板系统为快拆模系统,一套模板正常施工可达到四天一层,而且可以较好的展开流水线施工,大大提高施工进度,节约管理成本;重复使用次数多,平均使用成本低。铝模板系统采用整体挤压形成的铝合金型材做原材,一套模板规范施工可翻转使用80次以上。一套模板的采购价格均摊下来比传统模板节省很大的成本。2、技术特点:铝框PPR板模板有利于环保,节约木材,保护森林,可多次再利用,符合国家节能减排政策,真正实现绿色施工,且铝框PPR板模板具有自重轻,承载力高,施工容易,维护费用低,施工效率高,混凝土表面质量好,周转次数多等特点。现场实际运用图片53铝模深化设计二次结构施工技术实施/优化效果:以铝合金模板深化及二次结构施工为背景,主要对外立面结构线条、门窗过梁等主要部位进行深化研究。适用工程/范围:超过25层的住宅类项目(标准层施工)现场实际运用图片基本要求:1、外立面线条深化一次浇筑施工技术目前住宅楼工程外立面造型、线条较多,且一般图纸设计为砖砌线条,需要在主体结构施工完成后二次进行砌筑、抹灰。采用此工艺,经过前期图纸确认,将该部位的线条深化为混凝土结构,与主体结构墙柱同时浇筑,可避免二次砌筑施工,且规避了因砌筑施工容易产生的渗漏隐患。2、室内门窗洞口下挂深化一次浇筑施工技术在进行室内墙体砌筑时,常规的做法是在门窗洞口上方采用植筋做过梁的方式。采用此工艺,结和确定后的图纸,对门洞上方的过梁位置、宽度进行深化,将过梁深化为与主体结构梁同时浇筑,可免去二次结构施工。做法示意图54梁柱核心区箍筋定型化施工基本要求:1、技术创新:
梁柱核心区箍筋施工采用核心区箍筋定型化施工的工艺,梁柱节点核心区柱子箍筋在板面以上排好间距,核心区箍筋四角用钢筋焊接成型,并临时绑扎固定。然后进行梁钢筋架空绑扎,梁绑扎过程中先绑扎短跨方向主梁,再绑扎长跨方向主梁,最后绑扎次梁,当所有主次梁均板扎完毕后,松开固定好的定型箍筋和临时支架,使定型箍筋及主次梁整体下落,然后适当修整,完成钢筋绑扎。2、技术特点:
采用梁柱核心区箍筋定型施工,既保证了核心区柱箍筋绑扎的间距和规范性又能方便梁钢筋绑扎施工,使梁钢筋绑扎整体性好,施工方便;采用梁柱核心区箍筋定型绑扎工法,支设模板时不用提前留置梁侧模板,减少工种之间的衔接,有效地节省工期。55实施/优化效果:保证钢筋绑扎质量,施工方便。适用工程/范围:各类民用建筑框架梁柱的施工。现场实际运用图片卫生间降板采用定型化钢制模板基本要求:1、技术创新:
标准层卫生间降板采用定型化钢制模板,模板材料采用方钢和角钢,利用钢制模板刚度高,不易变形的特点,结合方钢和角钢尺寸固定的特性,组合设计吊模,既保证了卫生间内净尺寸,有保证了模板体系的刚度。2、技术特点:
吊模的整体性好,可随时整拼整拆,杜绝降板部位偏位、涨模等现象,保证了混凝土构件成型质量,截面尺寸;吊模一次成型,层层周转使用,节省人工费、材料费、且施工速度提高,缩短工期。56实施/优化效果:保障混凝土构件成型质量,缩短施工工期。适用工程/范围:标准层降板施工。现场实际运用图片弧形水道结构混凝土浇筑施工技术实施/优化效果:混凝土浇筑依次分段浇筑,达到清水混凝土效果。适用工程/范围:弧形水道混凝土浇筑。基本要求:
底板浇筑完后6小时以内浇完其上部外导墙混凝土。水道底板内斜角度、坡向不一,人工计算坡向变化及施工过程中控制过渡段平滑。采用“分段浇筑,一个坡度,定点标记”的方法进行浇筑;水道墙体浇筑时由中间向两侧浇筑。弧形水道纵向坡度的控制采用“分段浇筑,一个坡度,定点标记,一次到顶”的方法。混凝土标高、平整度控制:预先用水平仪抄平,抄出底板结构面纵向坡度标高控制线,用红油漆标注在四周设置的钢筋上。混凝土浇筑时将所标注点拉线控制标高,拉线点与点间不宜超过5m。现场实际运用图片57做法示意图多段曲线观众席混凝土阶梯施工技术实施/优化效果:克服了该位置曲线阶梯放线困难,模板难以支设的问题,为同类型结构的施工提供了良好的借鉴。适用工程/范围:曲线观众席阶梯类似工程施工。现场实际运用图片基本要求:曲线阶梯采用BIM技术结合CAD技术制作放线图,采取方格网状放线形式确保多点控制曲线弧,找出每段圆弧圆心、弧长、半径,计算每段圆弧顶点、两侧端点及弧中选取多点的坐标,最终制定放线图。采用可调节曲率的定制模板对曲线阶梯侧模进行支设,通过调节模板背面的调节螺栓来调节模板曲率。并采用分体式对拉螺杆进行模板加固,能有效保证竖向构件厚度。设置胶垫能有效防止漏浆,设置铁垫以防止模板被拉穿,对曲线阶梯弧度控制起着至关重要的作用。58悬挑斜外檐面板反向安装装置及制作技术实施/优化效果:优于一般吊篮和悬挑架技术,不需要象搭设落地架那样巨大的工程量。适用工程/范围:类似大悬挑檐面板安装工程。基本要求:1、技术创新:大悬挑斜外檐面板反向安装装置,包括上导轨两个,纵向设置在悬挑斜外檐的顶部,且两个上导轨沿横向、平行间隔布置;悬挑钢架安装在上导轨上,并与上导轨滑动连接,其中悬挑钢架的前端超出悬挑斜外檐的前端;下导轨纵向连接在悬挑斜外檐与结构柱的连接位置处;移动平台平行于悬挑斜外檐底面、沿横向通长布置在悬挑斜外檐的下方、通过吊索悬吊在悬挑钢架上,末端滑动连接在下导轨上。2、技术特点代替了传统用吊篮或悬挑架施工方法存在的工艺复杂、架体搭设难度高、危险系数大以及施工质量不易保证的技术问题。现场实际运用图片59仿唐古建斗拱安装施工技术实施/优化效果:解决了斗拱安装施工难题,提高了斗拱安装的施工质量。适用工程/范围:仿古建斗拱类似工程。基本要求:采用BIM技术对图纸进行深化,形成斗拱各部件数字信息,把整体斗拱拆分成可加工的装配式单元构件,并通过3D打印技术对构件进行预拼装,校核构件尺寸。再按照构件的形状、大小、位置等信息,将构件拆分成若干单独、简单、加工方便的单元,并逐一编号。根据BIM模型拆分成的模型单元构件生成加工单,加工单包含构件名称编号、加工数量、安装位置及斗拱编号、进场时间、构件信息二维码等信息。现场实际运用图片60翼角飞檐模板曲面测量定位施工技术实施/优化效果:通过曲面测量定位控制翼角曲面造型,用于现场椽子底模标高的控制。适用工程/范围:翼角飞檐工程。基本要求:外檐、翼角的控制点、线主要内容包括翼角向上弯曲起翘点、翼角向外弯曲冲出起点、翼角终点、挑出椽子外边沿控制线、椽子放射形布置的起点等。画出控制点布置图,将这些控制点按投影反映在一个平面上,同时计算出控制点的标高。在已浇筑完成的混凝土楼面,使用铅垂仪将其控制网测设到上层楼面,按照外檐控制点布置图进行控制点的布设。根据各标高排布点坐标,使用全站仪进行复核各坐标点值,无误后将各排布点以点连线成弧线,来控制底模和侧模的弧线位置。现场实际运用图片61翼角飞檐椽子聚苯板模板施工技术实施/优化效果:经过多方案进行比较,最终确定在底模上粘贴聚苯板条作为椽子的模板,方便安装和拆除。适用工程/范围:飞檐椽子模板工程。基本要求:翼角飞檐椽子底膜采用15mm厚覆膜木胶合板,主龙骨100mm×100mm、次龙骨50mm×100mm木方。正身飞檐椽子间的空隙采用粘贴聚苯板,翼角飞檐处的椽子之间,采用覆膜木胶合板中间夹聚苯板、钢钉固定于底模之上。木模板与聚苯板的粘贴,聚苯板底部与顶部均粘贴胶带,为防止混凝土浇筑造成聚苯板上浮,应对聚苯板二次固定。加固方法:采用10#铅丝沿聚苯板两边穿模板固定,要穿过底模与支撑架的水平杆进行绑扎拉紧。防止浇筑混凝土造成聚苯板上浮。现场实际运用图片62超高层组合式吊笼大型设备吊装施工技术实施/优化效果:利用吊笼垂直运输,避免了大型设备的拆卸解体,加快了吊装速度和施工进度。适用工程/范围:超高层大型设备垂直吊运工程。基本要求:根据最重设备2.5吨及吊笼自重,考虑1.2倍安全系数设计吊笼,经过PKPM软件进行受力分析,保证吊装安全性和实用性。在地面将连接地坦克的移动底座从吊笼沿轨道拖出,用叉车将设备放置在移动底座之上推进吊笼,设备吊运至指定楼层外,塔吊停止提升和摆动,缓慢靠近楼内,保证吊笼前段的伸长部分搭放在楼板上,而后通过钢丝绳将吊笼的耳环连接在地锚上,防止吊笼外移。设备在楼层内的水平运输采用5t电动葫芦牵引,在水平运输需要转弯的地方,使用千斤顶将设备顶起,改变地坦克的方向,然后将设备落下,继续牵引行走。现场实际运用图片63超高层核心筒大型管道倒装法液压提升施工技术实施/优化效果:采用千斤顶吊装、倒装法施工,经过严密的计算,既方便施工、保证安全,有加快了施工进度。适用工程/范围:大型管道提升工程。基本要求:1、技术创新:吊装横梁、支撑该横梁的柱子采用I20b工字钢,并用5mm厚钢板连接,钢柱下通过10mm厚钢垫板将荷载均匀下传,2根I22a横梁承担钢垫板传下来的荷载,并将荷载传到屋面梁上。采用液压千斤顶作为提升装置,包括TS15-200穿心式千斤顶、柔性钢绞线吊索及楔形锚具;采用倒装法进行管道施工,在底层进行管道等吊运,管道满焊进行吊装。2、技术特点:提升安全可靠,承重件自身重量轻,运输安装方便,不必中间镶接。现场实际运用图片64超高层核心筒爬模与铝模结合部位施工技术实施/优化效果:模板平整度及垂直度得到保证,混凝土外观质量有较大提升。适用工程/范围:超高层核心筒模板工程。基本要求:爬模大模板为120系列木模板体系,铝模IC板规格为100*150mm,将爬模大模板H20木工字梁与铝模IC板通过4套M14螺杆进行有效连接,大模板主龙骨焊接4套花篮螺丝调节铝模IC板的垂直度和平整度;铝模IC板通过连接工字梁与爬模实施同步提升;在大模板与铝模IC板、工字梁与IC板之间分别用模板条、聚氨酯泡沫进行填充。外筒爬模大模板与铝模边梁侧板结合部位,采用2套M14对拉螺杆将500mm长的8号槽钢加固在木工字梁,保证结合部位模板可靠拼接,防止铝模边梁侧模产生侧移,避免混凝土产生错台。现场实际运用图片65液压爬模采用钢柱作支撑在混凝土梁上爬升技术实施/优化效果:解决了爬模在超宽洞口无法附着支撑的爬升难题,技术方便快捷、安全可靠、绿色环保,节省了成本投入,提高了施工效率。适用工程/范围:核心筒超宽洞口爬模工程。基本要求:1、技术创新:在剪力墙超宽洞口(Ln≤5.6m)的混凝土梁爬升时施工使用。将钢柱与爬模挂板焊接成预制钢构件,预埋爬锥安装于混凝土梁上作为钢柱受力点,钢柱可根据不同层高组合安装(可满足3.6m至5.4m层高),爬模爬升时导轨尾撑通过连接槽钢支撑在临时钢柱上,爬升完成后将底层钢柱吊运至上层使用。2、技术特点:因核心筒结构变化大,剪力墙削弱变为混凝土梁,液压爬模在超宽洞口爬升无受力传递点,针对上情,在超宽洞口采用两片钢柱挂在非标准挂板上作为爬模支撑。现场实际运用图片66窗台下异形混凝土技术实施/优化效果:节约成本;方便施工;质量效果显著;节省工期。适用工程/范围:高层住宅建筑工程。基本要求:1、技术创新:采用窗台下异形混凝土技术,对于造型复杂的住宅工程,异形混凝土施工技术,有利于提高施工质量,方便模版的支设,提高施工效率。在外墙造型方面,避免了岩棉板小造型不容易施工的情况。2、技术特点:窗台下异形混凝土技术采用混凝土结构代替部分砌体工程及外墙岩棉工程。由于窗台下岩棉不容易固定,采用混凝土结构有利于造型的施工。同时砌筑部分用混凝土进行优化,保证了混凝土的平整度及其施工质量。大大的方便了此部位的施工,增加了施工效率,节省了成本。现场实际运用图片67型钢混凝土组合梁梁底钢筋与钢柱焊接技术实施/优化效果:施工过程中焊接操作人员也能对底部钢筋进行有效焊接,从而达到降本增效提高焊接质量和降低安全风险的目的。适用工程/范围:型钢混凝土组合梁梁底钢筋与钢柱焊接工程。基本要求:传统的鹅颈式短头焊枪对存在有高差的梁底部钢筋焊接较为困难,采用长颈式直头焊枪能对底部钢筋进行有效焊接。预先焊接在型钢柱上的钢筋连接板的定位则需要钢结构深化设计人员通过BIM软件精心计算和设计才可完成。钢筋与牛腿板焊接必须满足双面焊5d或单面焊10d的要求,这样对钢筋下料工序的精度要求比较严格,其精度误差不宜大于5mm。工人的操作技能和责任心是关键。现场实际运用图片68大跨度钢结构构件支撑架及胎架实施/优化效果:布置灵活,易于组合、吊装;适用工程/范围:大跨度钢结构构件(如张弦梁、拱桁架)吊装时临时安置。基本要求:1、技术创新:大跨度钢结构构件支撑架及胎架由下部塔吊标准节和上部工字钢胎架组成,其中上部胎架根据构件实际尺寸加工制作。2、技术特点:大跨度钢结构构件支撑架及胎架全部组件均在现场加工、拼装,可适应各类尺寸的钢结构构件安装;易于吊装,安装速度快,适用于多榀钢框架连续作业;安全性高,承载力高,垂直度易于保障。69现场实际运用图片钢结构用自制钢爬梯实施/优化效果:加工方便,安全性高适用工程/范围:钢结构高空作业。基本要求:1、技术创新:自制钢爬梯由圆钢(或角钢)主支撑,圆钢踏棍和圆钢挡撑组成,构件之间点焊牢固。爬梯上部可与主体结构焊接(或可靠搭接)牢固。2、技术特点:该爬梯全部采用现场加工,可根据实际情况进行调整长度;现场取材,加工方便;安全性高,适用范围广。70做法示意图钢结构焊接防风棚实施/优化效果:布置灵活,加工方便,挡风效果好,安全可靠性高;适用工程/范围:钢结构高空焊接作业。基本要求:1、技术创新:防风棚由脚手架钢管、防风帆布搭设而成,钢管与构件可采用点焊固定。2、技术特点:防风棚四周与顶部均设置防风帆布围挡,挡风效果好,可在2m/s的风速条件下进行焊接作业;搭设方便,钢管框架与主体干结构固定牢固,安全可靠性高。71钢结构高空作业安全绳及支架实施/优化效果:安装方便,安全可靠性高;适用工程/范围:钢结构高空作业。基本要求:1、技术创新:该支架由钢管主支、基座钢板、安全绳、安全环组成,其中钢管与基座、基座与钢梁焊接连接,焊缝高度不小于6mm。2、技术特点:加工方便,安装快;承载力高,经现场试验可承受100kg左右坠落荷载仍不破坏,使用各类钢结构高空作业的安全防护。72外架悬挑梁应用实施/优化效果:提高施工现场,安装更加便捷,安全可靠。适用工程/范围:高层外架工程。基本要求:1、技术创新:外架悬挑梁在施工阶段跟主体一起浇筑,支模方便快捷,工人操作更加安全便捷,同时可以进行周转使用,降低成本。2、技术特点:外架悬挑梁在施工阶段跟主体一起浇筑,为提前做好外墙防水、肥槽回填及停止降水准备,同时与传统工字钢相比,砼悬挑梁可避免后期堵洞,减少渗漏隐患。现场实际运用图片做法示意图73悬挑式卸料平台耳板拉结周转施工施工工法基本要求:1、技术创新:
悬挑式卸料平台钢丝拉结点采用拉结耳板连接,通过在混凝土梁内预埋PVC套管,高强螺栓对穿固定耳板。2、技术特点:
此做法工具化程度高,操作简单方便,构件一次成型,周转使用率高,技术、经济效益显著;采用拉结耳板周转使用施工工法要比传统预埋吊环拉结施工速度提高5倍以上,大大提高施工速度。74实施/优化效果:操作简单方案,构件一次成型,周转使用率高,技术经济效益显著。适用工程/范围:悬挑卸料平台及其他外悬挑拉结施工方式。现场实际运用图片做法示意图施工电梯钢梁基础施工工法基本要求:1、技术创新:
钢梁上、下方设置缀板与两根工字钢焊接,并在两根工字钢之间每隔1.5米甘姐一根短工字钢,形成组合钢梁,钢梁两端与预埋在结构梁上的预埋件进行连接固定,形成钢梁基础。2、技术特点:
不需要对楼板采用底层楼板回顶加固;不占用下层工作面;钢梁基础能够在类似项目进行周转利用或进行废料回收。75实施/优化效果:能够周转使用并进行废料回收。适用工程/范围:所有施工电梯基础,特别适用于不能直接置于结构上的工程和处理难度大、费用高的软弱地基土工程。现场实际运用图片做法示意图建筑垃圾资源化的高流态混凝土在非承重墙体中应用技术实施/优化效果:可大大提高提高了施工效率,墙体达到免抹灰效果。适用工程/范围:建筑工程非承重基本要求:1、技术创新:非承重墙体采用高流态混凝土现浇墙体,高流态混凝土是充分利用建筑垃圾等固体废弃物,进行特殊处理和精深加工而成,把建筑垃圾转化成为新型建筑材料,实现建筑垃圾无害化处理和资源化利用。建筑非承重墙体采用铝框木模“快拆体系”,现浇施工过程中,采用非承重墙、构造柱、预埋管线的一体化、一次性现浇施工方法。2、技术特点:①浇筑采用泵送方式进行,不需要也不能振捣、插岛或振动,呈超饱和的自流状态;②该材料具有轻质、高强、成本低的特点,还具备隔音、保温隔热、环保、耐久性好等优点;③与传统砌墙工艺相比大大提高了施工效率;④至少减少50吨垃圾每万平方米;⑤高流态混凝土墙体采用现浇方式,一次成型,成型的墙面,表面光滑,无裂纹,平整度较好,可达到墙体免抹灰效果。现场实际运用图片测量放线单边支模设置墙体构造钢筋合模板浇筑混凝土墙体成型76钢筋植筋钻孔机应用实施/优化效果:植筋钻孔操作便捷。适用工程/范围:公建类层高较高砌筑工程。基本要求:1、技术创新:钢筋植筋钻孔机,利用简单的传动装置配合激光水平仪,应用于公建类层高较高项目,相对于采用操作平台植筋效率较高,且更加安全操作简便。2、技术特点:项目技术人员结合现场实际情况,将钻孔机固定在传动装置端部,配合激光水平仪竖向定孔定位,利用杠杠原理传动支架,进行顶部钻孔作业,施工灵活,方便快捷,且相对效率较高。现场实际运用图片77机械喷涂抹灰施工技术实施/优化效果:效率高,有效的解决空鼓,开裂等质量问题。适用工程/范围:适用于所有工程。基本要求:1.技术创新:机械喷涂抹灰与传统手工抹灰相比,具有效率高、与基层你粘结力强显著特点,可缩短工期,减少用工,降低成本。2.技术特点:在施工质量方面能够有效解决空鼓、开裂与脱皮等问题,进而较少后期修补量。现场实际运用图片78一字线激光器应用实施/优化效果:通过投射出的强光替代传统拉线及吊线砌筑方法。适用工程/范围:适用于砌筑工程。基本要求:1、技术创新:与普通激光投线仪相比,一字线激光器能够投射直线型激光,且由于一字线激光器的投射弧面为120°,通过调整可使直线型激光投射到水平和竖直两个方向,且激光会随砌墙的层数增高而上移,无需再次定位,大大节省时间提高效率。2、技术特点:一字线激光器的激光发射口与水平方向之间呈设定角度,通过可转动可伸缩连接件与支架相连,支架带有夹紧物体(一般夹结构梁)的夹紧构件,投射出的激光可替代传统拉线及吊线砌筑方法。做法示意图现场实际运用图片79墙体自动养护技术实施/优化效果:为保证墙体养护效果的同时节省人工成本。适用工程/范围:适用于多层、高层建筑标准层墙体养护。基本要求:1、技术创新:采用定型化管道和喷头取代人工养护,通过一次性投入,提升了养护效率降低了人工成本,使养护用水量、养护时间变得更加科学、可控,节约用水。2、技术特点:本系统由给水系统和电气系统组成。PPR给水管固定在穿墙螺杆上,穿墙螺杆卡死在墙体穿墙螺杆洞上,方便拆卸和安装,降低成本。在变频泵处安装变频器,调节水压。通过时控开关控制变频泵的起停来控制喷淋频率和喷淋时间。本系统可以方便安拆、降低成本、同一套系统可以应用面积不同的楼栋、保证合适的混凝土养护时间、节约劳动力、节约用水。现场实际运用图片80基本要求:1、技术创新:在现浇混凝土结构墙内暗装配电箱,采用箱壳内支撑体系防止箱体变形。2、技术特点:采用现场通用的角钢、通丝螺杆、钢板等材料,按图制作箱体内支撑体系,使四角与箱体内角耳硬连接固定,通过对内支撑体系通丝螺杆的调节,实现配电箱的方正及牢固。同规格内支撑体系可以重复利用。达到一模多用,可实现配电箱预制化安装,具有推广及应用价值。暗装配电箱箱壳预埋及内部支撑体系施工技术做法示意图81实施/优化效果:确保质量,同规格框体可以重复利用,节约成本,提高工作效益。适用工程/范围:主体结构施工阶段配电箱预埋。现场实际运用图片实施/优化效果:采用塑塑料管套接JDG管,经过加热使得接头严密,灰浆不能进入电管内,无堵管现象,提高工效,效果明显。适用工程/范围:采用JDG暗埋管的电气工程。基本要求:1、技术创新:
采用热塑管连接JDG管接口,根据热塑管的热胀冷缩特性,使接缝严密,砂浆不得进入管内。2、技术特点:
热塑管套入管路,管接口处首先采用穿钉固定,热塑管套入管接口处,使用手持电热风机均匀使热塑管接头受热,然后再冷却,使得热塑管和JDG管贴合严密,防止砂浆进入,节省了后序清理管内障碍的工效,此技术对同类管材的施工具有推广及应用价值。暗埋式JDG管热缩密闭接头施工技术现场实际运用图片82实施/优化效果:
完成一个导线并头全过程仅需10秒,为人工的工作时间的1/10的时间,即节约10倍的人工工效。适用工程/范围:电气工程的并线工序。基本要求:1、技术创新:插座、开关、灯具接线并线采用自动剥皮并线器,由手工转化成电动机具施工,节约人工,大幅度提高工作效益。2、技术特点:利用电动自动剥皮并线器,将需要并线的两根或三根线插入电动并线孔里,按动启动按钮,瞬间电线绝缘皮被剥掉且并线完成,节约人工单根剥皮并并线的操作的时间。具有推广及应用价值。接线盒电线自动剥皮并线施工技术现场实际运用图片83实施/优化效果:风口与吊顶板贴合严密,风口安装方正,风口安装不受吊顶龙骨调整,无堵管现象,提高工效,效果明显。适用工程/范围:采用JDG暗埋管的电气工程。基本要求:1、技术创新:利用镀锌钢板边角料根据风口外部曲线构造自制卡子,形状类似风口外形曲线。2、技术特点:风口外形卡的角度根据风口外部构造弯制,利用风口外部沟槽线,使卡子一边抵入槽内,一端卡住吊顶板,通过自攻螺丝及通丝螺杆固定风口四边,使得风口安装不受吊顶龙骨调整的限制,节约人工,大幅度提高工作效益。风口安装不受吊顶时间的限制,可以实现预化生产。具有推广及应用价值。风口外形卡制作及安装技术现场实际运用图片84十一、BIM应用85BIM技术在临建设计中应用实施/优化效果:通过BIM技术充分利用场地空余空间,临建布置分配合理。适用工程/范围:项目策划,临建布置,施工模拟。基本要求:1、技术创新:通过BIM三维空间模拟技术,合理利用及优化现场各阶段总平布置,平面布置尽量减少临时用地面积,充分利用原有建筑物及道路。临时设施占地面积有效利用率不低于90%,现场物料堆放紧凑,施工道路按照永久道路和临时道路相结合的原则布置。2、技术特点:通过BIM技术可实现场地漫游,进行可视化交底,可以提高并优化设计水平、降低施工风险。BIM效果布置图86BIM技术场地布置实施/优化效果:直观展示现场平面布置,可反应场地内各临时设置的位置及高程关系。适用工程/范围:办公区、生活区及施工现场平面布置。基本要求:1、技术创新:BIM技术的出现给平面布置工作提供了一个很好的方式,精准表达施工空间冲突指标,进一步完善场地布置方案,使平面布置方案更全面、科学。减少后期场地变更,节约施工成本。2、技术特点:利用BIM技术辅助场地的动态布置,建立标准化和定型化的临建、临边防护及施工机械设备族库,通过应用工程现场设备设施族资源,充分考虑其占地面积及高度,快速布置场地。现场实际运用图片87BIM图纸深化墙体预留洞口实施/优化效果:利用BIM技术提前对剪力墙、二次结构施工洞口尺寸及定位做深化处理,避免后期二次剔凿放浪费人工和材料。适用工程/范围:适用于工程量较大,结构留洞较多的工程。基本要求:1、技术创新:充分利用BIM模型技术,提前对机电施工管线排布做调整,与土建图纸相结合,提前深化处出各楼层内洞口尺寸及定位,在主体结构施工过程中按照深化图纸进行留洞,避免了二次剔凿和修补。2、技术特点:现场施工模型化、可视化,极大的避免了材料、人工的浪费,节约了施工成本,有效缩短了工期。现场实际运用图片88BIM技术用于机电管线精细化管理实施/优化效果:量化管理,减少材料浪费,精细化管理,保证施工质量。适用工程/范围:机电管线综合排布。基本要求:1、技术创新:应用BIM技术可以根据各专业管线安装走向及特点对整个工程图纸进行调整,并最终确定各专业管线标高及横向位置,避免安装时发生碰撞。经过BIM管线综合排布后,实际现场施工起来会更加直观、方便,安装完成后更加美观、有层次感。2、技术特点:在机电综合管线优化完成后,利用BIM技术系列软件对管线排布合理分析、材料用量统计,工程量统计。然后出图指导现场施工。现场实际运用图片89BIM技术用于砌筑精细化管理实施/优化效果:量化管理,减少材料浪费,精细化管理,保证施工质量。适用工程/范围:采用砌筑/砌块填充墙的建设项目。基本要求:1、技术创新:充分利用BIM模型的各种项目的相关信息,提高建筑信息的传递,BIM综合管线优化完成后,在此基础上进行砌筑工程深化设计,从而提高生产效率、减少材料浪费,节约成本和缩短工期。2、技术特点:在机电综合管线优化完成后,利用BIM技术系列软件对墙体进行:开洞定位,砌筑排布、材料用量统计,工程量统计。然后出图指导现场施工。现场实际运用图片90BIM技术统计混凝土用量实施/优化效果:避免浪费,节约用材适用工程/范围:现场混凝土用量基本要求:可以精细统计施工中混凝土用量,避免浪费,节约用材。现场实际运用图片91移动质检APP使用实施/优化效
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 廊坊会计考试题库及答案
- 2026三年级数学下册 面积综合应用
- 保安宿舍管控制度
- 加气操作员证试题及答案
- 重庆地理特岗试题及答案
- 企业如何制定员工休假制度
- 4.3 依法履行义务 课件 2025-2026学年统编版道德与法治八年级下册
- 土木工程项目部奖惩制度
- 公司资材管理奖惩制度
- 合同管理考核奖惩制度
- 2026贵州毕节织金县部分县直单位公开考调工作人员47人实施笔试参考题库及答案解析
- 2026年六安职业技术学院单招职业适应性考试题库附参考答案详解ab卷
- GB/T 27664.3-2026无损检测仪器超声检测设备的性能与检验第3部分:组合设备
- 2026广东江门职业技术学院管理教辅人员招聘4人备考题库带答案详解(基础题)
- GB/T 46977-2026铸造用再生砂氮、硫、磷含量测定方法
- 突发事件创伤伤员医疗救治规范2025年版
- 2026年跨境电商平台合同
- 卫生健康局法律顾问制度
- 2025年漳州市国企考试真题
- 钢铁企业消防安全培训课件
- 货梯使用专项安全培训课件
评论
0/150
提交评论