版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1,Module und Variations_E,Modules and variations New graphics guidelinesDesign proposalsRoland Berger Hamburg, November 2001,2,Module und Variations_E,ContentsPage,A.Standard slides3 B.Lists (1) Factors, no specific number7 C.Lists (2) Factors, specific number13 D.Matrix Factors, comparisons24 E.Pro
2、cess (1) Factors, steps35 F.Process (2) Factors, impact49 G.Process (3) Factors, interlinked67 Annex: Nine key changes compared to the old standards73,3,Module und Variations_E,A. Standard slides,4,Module und Variations_E,Methodological competence,Key projects,Industry competence,Professional experi
3、ence,Languages,Education,Consultant profile: first name, last name,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Position: xxxxxxxxxxxxxxxxxxxxxxxx,German xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Born: xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
4、xxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,Nationality: xxxxxxxxxxxxxxxxxxxxx,Updated: mm/year,5,Module und Variations_E,Organizational chart,6,Module und Variations_E,Organizational chart (including headcount),7,Module und Variations_E,B. Lists (1) Factors, no specific number,8,Module und Variat
5、ions_E,Lists horizontal (variations),Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,1,2,3,4,9,Module und Variations_E,Lists vertical (variations),.,.,.,.,.
6、,1,2,3,4,10,Module und Variations_E,Schedule,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,11,Module und Variations_E,Sets of guidelines,2,3,4,5,Guidelines 1,Guidelines 2,Guidelines 3,Guidelines 4,Gui
7、delines 5,Comments 1,Comments 2,Comments 3,Comments 4,Comments 5,1,12,Module und Variations_E,13,Module und Variations_E,C.Lists (2) Factors, specific number,14,Module und Variations_E,Pyramid (3 or 4 levels),15,Module und Variations_E,Pyramid (5 levels/centered),16,Module und Variations_E,3 factors
8、 (interwoven),.,.,.,1,2,3,17,Module und Variations_E,Common ground,18,Module und Variations_E,4 factors (1),19,Module und Variations_E,4 factors (2),20,Module und Variations_E,4 factors (3),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,21,Module und Variations_E,4 factors (3a weighted),2,3,4,Factor 1,
9、Factor 2,Factor 3,Factor 4,22,Module und Variations_E,4 factors (3b dynamic),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,Four dynamic factors,23,Module und Variations_E,6 factors (variation),24,Module und Variations_E,D.Matrix Factors, comparisons,25,Module und Variations_E,Matrix/table (Horizontal/
10、vertical comparison of data variations),1,2,3,4,26,Module und Variations_E,Special types of matrix opportunities/threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,1,2,3,4,27,Module und Variations_E,Special types of matrix pros and cons,1,2,3,28,Module un
11、d Variations_E,Special types of matrix controversy,1,2,3,4,29,Module und Variations_E,Special types of matrix conflict/tension (1),30,Module und Variations_E,Special types of matrix conflict/tension (2),31,Module und Variations_E,Special types of matrix bottom up/top down (1),BOTTOM UP,TOP DOWN,.,.,
12、32,Module und Variations_E,Special types of matrix bottom up/top down (2),.,.,BOTTOM,UP,TOP,DOWN,1,2,33,Module und Variations_E,Special types of matrix equilibrium,34,Module und Variations_E,Special types of matrix imbalance,35,Module und Variations_E,E.Process (1) Factors, steps,36,Module und Varia
13、tions_E,Processes,1,2,3,37,Module und Variations_E,Process/phases,1,2,3,4,5,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,1,2,3,4,38,Module und Variations_E,Cycles (1) (color presentation),39,Module und Variations_E,Cycles (2),40,Module und Variations_E,Spirals (orthogonal)
14、,1,2,41,Module und Variations_E,Hurdles,42,Module und Variations_E,Resistance/obstacles,1,2,5,7,3,4,6,43,Module und Variations_E,Filters,1,2,4,5,3,6,44,Module und Variations_E,Change of mindset/direction,1,2,3,4,45,Module und Variations_E,Nodes/interfaces,1,4,3,7,5,6,8,9,2,46,Module und Variations_E
15、,Pressure,1,2,47,Module und Variations_E,Increase/decrease,1,2,3,4,5,6,7,8,48,Module und Variations_E,Various types of brackets (to be used instead of block arrows),1,2,3,4,5,6,7,8,9,10,11,49,Module und Variations_E,F.Process 2 Factors, impact,50,Module und Variations_E,Consequences (1),.,.,.,.,.,.,
16、51,Module und Variations_E,Consequences (1a),.,.,.,.,.,.,52,Module und Variations_E,Consequences (2),53,Module und Variations_E,Consequences (3),.,.,.,.,54,Module und Variations_E,Consequences (4),.,.,.,.,1,2,55,Module und Variations_E,Impact (3 factors),QUALITY,TIME,COST,56,Module und Variations_E,
17、Impact (4 and 6 factors),57,Module und Variations_E,Impact (4 factors),Factor 3,Factor 2,Factor 4,Factor 1,Generic description of the 4 factors,58,Module und Variations_E,Impact (5 factors),Factor 3,Factor 2,Factor 4,Factor 5,Generic description of the 5 factors,Factor 1,59,Module und Variations_E,I
18、mpact (6 factors),Factor 2,Generic description of the 6 factors,Factor 3,Factor 1,Factor 5,Factor 4,Factor 6,60,Module und Variations_E,Impact (7 factors),Factor 3,Generic description of the 7 factors,Factor 2,Factor 6,Factor 4,Factor 5,Factor 7,Factor 1,61,Module und Variations_E,Impact (8 factors)
19、,Factor 3,Generic description of the 8 factors,Factor 2,Factor 6,Factor 7,Factor 4,Factor 5,Factor 1,Factor 8,62,Module und Variations_E,6 success factors,Impact and result (1),63,Module und Variations_E,Impact and result (2),5 success factors,64,Module und Variations_E,Vision,Vision,65,Module und V
20、ariations_E,Action/reaction,66,Module und Variations_E,Value chain,Customer,Supplier,Development,Production,Sales,Distribution,Company,67,Module und Variations_E,G.Process 3 Factors, interlinked,68,Module und Variations_E,Action/reaction (1),69,Module und Variations_E,Action/reaction (2) (transparen
21、t color presentation),70,Module und Variations_E,Interaction,1,2,3,71,Module und Variations_E,Jigsaw puzzle,72,Module und Variations_E,Spiral,73,Module und Variations_E,Annex: Nine key changes compared to the old standards,74,Module und Variations_E,Do not use block arrows,Use variations instead,1,2
22、,3,4,1,2,3,4,BACKUP,New Content design Key changes regarding lean, linear, literal,Do not use shading or borders,Instead, use unframed colored shapes in shades of key blue, for emphasis only,Do not use ovals,Instead, use AutoShapes with corners completely rounded off,Do not use stickers with lines,Instead, use upper case stickers (13 point), (key blue shade 1), positioned in the header area,Do not put numbers in circles,Instead, put th
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 计算机一级b类考模拟试题及参考答案
- 计算机应用类模拟试题及参考答案
- 房地产销售经纪人销售成果与客户关系维护考核表
- 餐饮业餐厅店长服务提升与效益绩效评定表
- 高端电动自行车维修手册
- 金融外汇经理岗位面试模拟试题及参考答案
- 金融机构对金融发展面模拟试题及参考答案
- 保险公司员工的工作总结10篇
- 四月份工作总结及五月份重点工作计划表
- 青岛滨海单招模拟试题及答案
- 消化性溃疡合并穿孔诊疗专家共识(2026版)
- 烟草消防安全知识培训课件
- 雨课堂学堂在线学堂云《园艺植物研究法( 宁夏)》单元测试考核答案
- 雨课堂在线学堂《医学实验技术与方法新进展》单元考核测试答案
- 2025年陕西省公务员行测(A类)真题及答案
- 国家基本公共卫生服务项目培训课件
- 2025年ISO90012015内审员培训测试卷含答案
- 《江苏省城镇排水管道非开挖修复工程估价表》2025
- 2025年中考数学总复习《二次函数压轴题(角度问题)》专项测试卷(附参考答案)
- 电子电气员英语考试题库(浓缩300题)
- 产品外观检验标准通用
评论
0/150
提交评论