版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,ATLAS,Product range overview,2,The content of this presentation is confidential and should not be distributed to a third party without prior
2、authorization from Edwards. Edwards Limited 2007,ATLAS range,Combustion abatement combined with wet scrubbing stages Suitable for Etch applications Low CoO, user friendly solution Excellent reliability on harshest processes PFC gas abatement capability,The content of this presentation is confidentia
3、l and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,ATLAS,Construction,4,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,ATLAS La
4、yout,All utility connections at top,All electrics housed in front-accessible section,Touch-sensitive colour screen,Inlet pipework design avoids powder & liquid trapping,Hydro-cyclone: self-cleaning water filtering device,Easily accessible heat exchanger and water pumps,Use of CPVC components, large
5、diameters minimise risk of blockage,Everything housed in a single cabinet,Integral drip-tray,CPVC is a FM-approved flame-retardant plastic,5,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,
6、Gas path,Water,Untreated process gas,Combustion by-products,Detoxified gas,Fuel + Air,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,ATLAS,Combustion section,7,The content of this presenta
7、tion is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Inlets,L-shaped pipe work Avoid blockage by solid/liquid by-products Up to 6 inlets TMS option available Inlet temperature control Avoid by-products condensation,8,The c
8、ontent of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Combustion section,Initial gas treatment: combustion Oxidation of deposition gases SiH4 + O2 SiO2 + 2H2O Reduction of clean gases (NF3, F2) 2F2 +
9、CH4 + O2 4HF + CO2 Anti-clogging inlet head Inward fired combustor Porous ceramic construction Excellent corrosion resistance Proven powder handling Safe (leak-proof, cold outer wall),ATLAS Inlets,Pneumatic actuators,Springs,Inlet Head Self Cleaning Mechanism,Inlet nozzle,10,The content of this pres
10、entation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Combustor,150mm,150mm,11,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Ed
11、wards Limited 2007,Combustor: Inward fired combustion,Fuel gas + Air,Process gas,Flame-less, low temperature combustion,800oC,12,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Benefits 1:
12、Uniform temperature,Flame-less combustion Combustion at the wall Heat radiation to the center Low temperature 800oC Low NOx emissions (10ppm) Uniform Temperature No hot spot, No cold spot Combustor length of 300mm = Long residence time in a hot environment at 800C High DRE,800oC,13,The content of th
13、is presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Benefit 2: Powder handling - No blockages,Constant flow of gas (Fuel+Air) across ceramic liner prevent powder deposition. Burner stays clean No blockages,14,T
14、he content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Benefit 3: No corrosion,Only ceramic material in contact with hot gases No corrosion Greater safety Greater uptime,800oC,Ceramic gasket,Porous
15、 Ceramic liner,Ceramic pad,15,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Benefit 4: Safety,Outer wall of burner is cold ( 40oC) Safe to touch, no burn injury O-rings are used in cold a
16、rea only No metal part in contact with hot gas Viton can resist HF and HCl below 200oC Burner is leak-proof, Burner stay leak-proof No risk of hot gas leakage,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edw
17、ards Limited 2007,ATLAS,Wet scrubbing section,17,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Wet scrubbing section,C-PVC construction Flame retardant plastic Corrosion-resistant High ef
18、ficiency scrubbing performance Water soluble by-products (HF, HCletc.) Insoluble particles (SiO2),18,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Wet scrubbing section,Cyclonic de-mistin
19、g,Packed Tower,Water tank,Heat exchanger,Cyclonic water filtering,Water pumps,Quench,Weir,19,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Wet stage Cooling section,Quench section,Weir se
20、ction,800oC,50oC,20,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Wet stage Drain tank and packed tower,Drain tank CPVC construction,Large diameter,Counter-current packed tower (CPVC cons
21、truction),21,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Drain tank,C-PVC construction Turbulent water flow Circulation rate: 1 volume per min. No sedimentation of powders Control by le
22、vel detectors Filter plate to prevent drain clogging Easy access for quick servicing,22,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Controls,PLC control Color touch screen display Ease
23、of service History log Ethernet communication Compatible with all CMS systems Pump interface Tool interface,23,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Two levels of Control,Master P
24、LC with colour touch screen display Requests FMS to start flame. PLC can independently isolate gas supply Flame Management System (FMS) Legal requirement to comply with US fire codes. FMS assembly is approved by FM Hardwired interlock.,24,The content of this presentation is confidential and should n
25、ot be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,ATLAS safety interlocks,HEAD TEMP. 180 C,GAS TEMP. 1150oC,QUENCH TEMP. 80oC,DRAIN LEVEL HIGH,FUEL/AIR PRESS. +3”wg,FUEL/AIR TEMP. 150 C,N2 pressure 3 bar (no start allowed in this condition),INLET PRESS
26、URE 2” wg,SYSTEM ALARM immediate system shutdown,FLAME DETECTOR,QUENCH WATER Flow 4.5 slm,O2 pressure 12 psi (TPU and Kronis versions only),FUEL PRESSURE. 7.5 mbar,WATER LEAK DETECTOR (inside cabinet),DRAIN TANK TEMP. 60 C,COMBUSTOR PRESSURE,Cabinet extraction pressure +0.4”wg,INLET TEMPERATURE 170C
27、,WEIR TEMP. 80oC,COMBUSTOR WALL TEMP. 70oC,PACKED TOWER WATER Flow 8 slm,WATER PRESSURE 2 bar gauge,The content of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,ATLAS installed base,Since 1994,26,The co
28、ntent of this presentation is confidential and should not be distributed to a third party without prior authorization from Edwards. Edwards Limited 2007,Inward-fired combustor installed base,ATLAS use the Inward-fired combustion technology Expertise gained with the TPU range Used in semiconductor fabs since 1994 Over 3000 systems installed worldwide M
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 第四章 电磁振荡与电磁波 训练题(含答案)
- 2026年西安电子科技大学实验室与设备处(电子封装与检测实验平台)外聘人员一般岗位招聘备考题库及一套参考答案详解
- 2026年杭州市学军小学教育集团诚聘语文、科学教师(非事业)备考题库完整参考答案详解
- 2026年长沙市城市建设档案馆公开招聘普通雇员备考题库及完整答案详解一套
- 2026年滨州医学院烟台附属医院高级专业技术岗位公开招聘人员备考题库参考答案详解
- 2026年黑龙江省金融控股集团有限公司及权属企业招聘备考题库及完整答案详解一套
- 2026年珠江水产研究所观赏渔业研究室项目岗招聘备考题库及完整答案详解一套
- 住宿员工安全管理制度
- 唐山高速公路集团有限公司为所属子公司2025年公开招聘专业人才备考题库及完整答案详解一套
- 养老院医疗保健服务管理制度
- 高考日语教师述职报告
- 室上性心动过速病人的护理查房
- GB/T 45167-2024熔模铸钢件、镍合金铸件和钴合金铸件表面质量目视检测方法
- JJG 272-2024 空盒气压表和空盒气压计检定规程
- 医疗机构抗菌药物临床应用分级管理目录(2024年版)
- 无人机培训计划表
- 我和我的祖国混声四部合唱简谱
- 2023年美国专利法中文
- 电气防火防爆培训课件
- 彝族文化和幼儿园课程结合的研究获奖科研报告
- 空调安装免责协议
评论
0/150
提交评论