1、Aggregate Planning,Chapter 12,Core MRP II,MANUFACTURING RESOURCE PLANNING,Aggregate Planning Strategies,Maintain a level workforce Maintain a steady output rate Match demand period by period Use a combination of decision variables,Basic Strategies,Level capacity: Maintaining a steady rate of regular
2、-time output while meeting variations in demand by a combination of options. Chase demand: Matching capacity to demand; the planned output for a period is the expected demand for that period.,Master schedule: The result of disaggregating an aggregate plan; shows quantity and timing of specific end i
3、tems for a scheduled horizon. Rough-cut capacity planning: Approximate balancing of capacity and demand to test the feasibility of a master schedule.,Disaggregating,Master Scheduling Process,Time Fences in MPS,Aggregate Production Planning,Aggregate Versus Detailed Plans Costs Of Production Chase, L
4、evel, And Mixed Strategies,Aggregate Versus Detailed Plans,Plans differ in terms of detail and planning horizons The aggregate production plan has a moderate horizon but little detail E.g., Plan overall facility production month-by-month for the the next 18 months The master production schedule has
5、a short horizon but great detail E.g., Plan production for each product week-by-week for the next 12 weeks,Aggregate Versus Detailed Plans,Why plan aggregate production levels? Aggregate plans do not provide detail needed to run facility But detail unnecessary for medium-range resource deployment de
6、cisions Labor force size Financing inventory Aggregate forecasts are more accurate than detailed forecasts,Aggregate Versus Detailed Forecasts,Sales forecasts can be aggregated with respect to time:,Sales forecasts can be aggregated with respect to time:,Aggregate Versus Detailed Forecasts,Sales for
7、ecasts can be aggregated with respect to product:,Aggregate Versus Detailed Forecasts,Sales forecasts can be aggregated with respect to product:,Aggregate Versus Detailed Forecasts,Why? Aggregate forecasts are more accurate than individual detailed forecasts,Aggregate Versus Detailed Forecasts,Why?
8、Aggregate forecasts are more accurate than individual detailed forecasts,Aggregate Versus Detailed Forecasts,Use aggregate forecasts for planning medium-range overall production levels. High long-range forecast accuracy Detail not needed for planning long-range resource use (labor, inventory, etc.)
9、Use detailed forecasts for initial detailed short-range Master Production Schedule (MPS) Detailed forecasts reasonably accurate for this time frame Need product-specific detail for MPS,Aggregate Versus Detailed Forecasts,The Aggregate Production Plan,Consider the following aggregate demand forecast:
10、 The plan is stated in the the common unit of capacity direct labor hours,Suppose we want to try to match demand:,The Aggregate Production Plan,Suppose we want to try to match demand: How do we “cost out” the plan?,The Aggregate Production Plan,First need some more information:,The Aggregate Product
11、ion Plan,“Projected Available Balance” is simply the estimated ending inventory for each period,The Aggregate Production Plan,The # workers needed is based on the planned production and average worker productivity here, it is 500 DLH/Worker/Quarter,The Aggregate Production Plan,Costs Of Maintaining
12、And Changing Production Levels,Costs of keeping production steady: Ch - Holding cost ($ / DLH / quarter) Cb - Backorder cost ($ / DLH / quarter) Costs of changing production CH - Hiring cost ($ / Worker) CF - Firing cost ($ / Worker) Also need to worry about: CR - Wage rate ($ / DLH / period),The Ag
13、gregate Production Plan,For our example, the wage rate is $10/DLH,The hiring and firing costs are $2000 and $500, respectively,The Aggregate Production Plan,Holding and backorder costs are $1 and $3 /DLH/Quarter, respectively,The Aggregate Production Plan,Which gives us a projected cost of $400,000
14、for the year,The Aggregate Production Plan,Chase, Level, & Mixed Strategies,This example is the first of the two pure strategies Chase strategy: make only as much as you can sell The other pure strategy has a different cost structure Level strategy: maintain a steady production rate In reality, a fi
15、rms strategy will be a combination or mixture of chase and level,A level strategy will absorb fluctuations in demand through fluctuations in inventory,The Aggregate Production Plan,A level strategy will absorb fluctuations in demand through fluctuations in inventory,The Aggregate Production Plan,A level strategy will absorb fluctuations in demand through fluctuations in inventory,The Aggregate Production Plan,A level strategy will absorb fluctuations in demand through fluctuations in inventory,The Aggregate
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 47212.3-2026家畜遗传资源保种场保种技术规范第3部分:牛
- 新能科技利用推动承诺书6篇
- 根治性肝癌肝叶切除术后护理查房
- 教育培训项目完成承诺书8篇
- 人力资源招聘流程与工具清单
- 项目交付质量控制模板系统
- 2026年安徽省蚌埠局属校初三第二学期第3次练考英语试题含解析
- 云南省曲靖市重点名校2026届初三第三次质量检测试题试卷英语试题含解析
- 上海市浦东区重点中学2026届初三下学期5月热身英语试题含解析
- 2026年上海浦东第四教育署初三第六次质检语文试题含解析
- 养成教育六行动
- 高一下期《化学必修第二册》实验课计划
- 手工焊锡知识培训课件
- 摄像头基础知识
- 融媒体语境下河南卫视文化节目品牌建设浅析
- Supplier-Audit-Check-List半导体芯片制造企业供应商审核清单
- 电机轴承知识与润滑知识
- 高考生物选择性必修1稳态与调节基础知识填空默写(每天打卡)
- DL-T5461.1-2012火力发电厂施工图设计文件内容深度规定第1部分:总的部分
- DL-T976-2017带电作业工具、装置和设备预防性试验规程
- 2024小升初语文复习 名著阅读《三国演义》(知识点+练习)学生版+解析版 (二)
评论
0/150
提交评论