SEMI Equipment Perance Standards Integration.ppt_第1页
SEMI Equipment Perance Standards Integration.ppt_第2页
SEMI Equipment Perance Standards Integration.ppt_第3页
SEMI Equipment Perance Standards Integration.ppt_第4页
SEMI Equipment Perance Standards Integration.ppt_第5页
已阅读5页,还剩22页未读, 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、SEMICON West 2006 STEPMethods to Measure/Improve Equipment Productivity,SEMI Equipment Performance Standards Integration,Sal DiIorioSemi-Tech Group ,Julu 12, 2006,SemiCon West 2006,2,Equipment Performance Metrics Process,Factory sources (automated and/or human) provide the inputs Standards define th

2、e process and equations Metrics are output consistently Same meaning for all metrics regardless of location,Factory Data,SEMI Standard,Metrics,Julu 12, 2006,SemiCon West 2006,3,Factory Data Sources,Automated Systems Production data, state history Equipment Maintenance and state history Equipment Cel

3、l Controllers Equipment E116 or E58 state information Non-automated Systems Manual state change histories Manual input to support E58 Other state and history logs,Julu 12, 2006,SemiCon West 2006,4,Eq. Performance Standards Relationship,Julu 12, 2006,SemiCon West 2006,5,E10 RAM,Central to all Equipme

4、nt Metrics Standards First developed in 1986 and continuously improved to meet new requirements of the semiconductor industry Defines the basic equipment states and metrics which act as input to other performance metrics E79 Overall Equipment Efficiency E35 Cost of Ownership E124 Factory Level Produ

5、ctivity,Julu 12, 2006,SemiCon West 2006,6,E10 Breakdown of Time,Julu 12, 2006,SemiCon West 2006,7,E10 Process,Julu 12, 2006,SemiCon West 2006,8,E116 Process,Julu 12, 2006,SemiCon West 2006,9,Mapping the States,NON-SCHEDULED TIME,UNSCHEDULED DOWNTIME,SCHEDULED DOWNTIME,ENGINEERING TIME,STANDBY TIME,P

6、RODUCTIVE TIME,E10 States,NON-SCHEDULED (MES) AND ANY STATE* (EPT) MANUFACTURING (MES) AND BLOCKED (EPT) ENGINEERING (MES) AND BLOCKED (EPT) UNSCHEDULED DOWN (MES) AND ANY STATE* (EPT) SCHEDULED DOWN (MES) AND ANY STATE* (EPT) ENGINEERING (MES) AND BUSY (EPT) ENGINEERING (MES) AND IDLE (EPT) MANUFAC

7、TURING (MES) AND IDLE (EPT) MANUFACTURING (MES) AND BUSY (EPT),*ANY STATE (EPT) means that the EPT state is not a factor in determining the E10 state.,Julu 12, 2006,SemiCon West 2006,10,E58 Process,Julu 12, 2006,SemiCon West 2006,11,E58 vs. E10 State Examples,Equipment tracks its own E58 state. But

8、it doesnt know its own E10 state details User input is required, in order to provide accurate data,Julu 12, 2006,SemiCon West 2006,12,E58 How it works,Equipment,Host Computer,Operator input to trigger E58 state changes.,Host input to trigger E58 state changes.,E58 state transition Event reports.,MES

9、,Information exchange regarding equipment downtime state and material type.,Metrics,Julu 12, 2006,SemiCon West 2006,13,Now that we have E10 Metrics, what do we do with them?,Continuous Improvement Activities Lean Mfg TPM RCM 6 Sigma Rel Eng Etc.,Julu 12, 2006,SemiCon West 2006,14,Using E10 Metrics,U

10、se them in purchase acceptance specifications MTBFp, Uptime, MTTR, etc. Monitor our own performance and drive continuous improvement activities Look for improvements in metrics when new procedures or processes are implemented. Benchmarking functions with other companies or between factories Use them

11、 as inputs to other SEMI Standards for a better understanding of equipment COO or productivity,Julu 12, 2006,SemiCon West 2006,15,SEMI E35 COO,COO = The full cost of embedding, operating, and decommissioning in a factory environment equipment needed to accommodate the required volume of production u

12、nits. Among the many inputs used by E35, two come from E10 Operational Uptime E10 metrics (MTBF, MTTR) to calculate maintenance labor hours required for scheduled and unscheduled downtime,Julu 12, 2006,SemiCon West 2006,16,E79 OEE,OEE calculations are stated in terms that are consistent with SEMI E1

13、0. OEE = Availability Efficiency x Operational Efficiency x Rate Efficiency x Quality Efficiency Where E10 directly provides the values for: Availability Efficiency = Equipment Uptime / Total Time Operational Efficiency = Production Time / Equipment Uptime Rate Efficiency = Theoretical Production Ti

14、me for Actual Units / Production Time Quality Efficiency = Theoretical Production Time for Effective Units / Theoretical Production Time for Actual Units Notes: Production Time is not defined in E10, but happens in Productive Time. Rate Efficiency x Operational Efficiency = Performance Efficiency,Ju

15、lu 12, 2006,SemiCon West 2006,17,The Relationship Between OEE and E10,Julu 12, 2006,SemiCon West 2006,18,E79 Process,Other data can come from MES or other Factory sources.,In addition to OEE several other efficiencies are also defined to enable users to assess more specific aspects of equipment prod

16、uctivity.,Julu 12, 2006,SemiCon West 2006,19,E10 States vs. E79 Productivity Losses,Julu 12, 2006,SemiCon West 2006,20,What is needed to determine E10 State?,Julu 12, 2006,SemiCon West 2006,21,What is needed to calculate E10 Metrics?,Julu 12, 2006,SemiCon West 2006,22,Automation vs. Manual Data Coll

17、ection,What data do people capture worst? Transition from STANDBY to PRODUCTIVE Transition from PRODUCTIVE to STANDBY Transition to UNSCHEDULED DOWNTIME Wafer/Cycle Counts Failures Cluster Tool Module level states,What data do people capture best? Transition to and from SCHEDULED DOWNTIME NON-SCHEDU

18、LED time Reason for Failures Equipment dependent vs. non-equipment dependent Transition and reasons for Maintenance Delay,Julu 12, 2006,SemiCon West 2006,23,Automation vs. Manual Data Collection,What data does automation capture worst? Transition to and from SCHEDULED DOWNTIME NON-SCHEDULED time Rea

19、son for Failures Equipment dependent vs. non-equipment dependent Transition and reasons for Maintenance Delay,What data does automation capture best? Transition from STANDBY to PRODUCTIVE Transition from PRODUCTIVE to STANDBY Transition to UNSCHEDULED DOWNTIME Wafer/Cycle Counts Failures Cluster Too

20、l Module level states,Julu 12, 2006,SemiCon West 2006,24,Is automation absolutely necessary?,Automation is superior for the following: Accurate data regarding Productive / Standby time More accurate OEE Operational Efficiency values Accurate data about cluster tool module level state Essential for C

21、T RAM and CT OEE metrics Accurate quantitative data about units processed and other parametric data for scheduling maintenance. Some level of automation is absolutely preferable, even if limited.,Julu 12, 2006,SemiCon West 2006,25,Do we really need automation?,Yes, primarily if: Detailed information

22、 is absolutely required. CT RAM and OEE metrics The cost of implementing and supporting automation can be justified. Full automation requires large investments in HW, SW and IT and is never “done”; it continually needs updates and ongoing commitment of resources (people and $). Lesser degrees of aut

23、omation can provide significant improvements in data accuracy. MES and CMMS (CIM) systems provide excellent sources for E10 data.,Julu 12, 2006,SemiCon West 2006,26,What if full automation is not possible?,Equipment level E10 metrics can be maintained. Daily and Weekly summaries can be analyzed. Look for changes and trends Equipment to equipment Time period to

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论