版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Book Rally,Skim through the book and find the answers to these questions.,After the project was called “Project Snowstorm”, what was its name changed to? 2. What kinds of trade fairs can you see in the photos? 3. Name the countries that you can read on the barcode labels.,Its name was changed to “Pr
2、oject Avalanche”. (Unit 1, page 11),One is a trade fair for IT service and the other for computer games. (Unit 4, page 62),The countries are India, USA, China, Mexico. (Unit 8, page 144),4. Where does the little girl in the cartoon want to outsource her homework? 5. Where do the Ice Road Truckers dr
3、ive? 6. Who is a small producer of computer flash drives? 7. At the board meeting in Unit 1, page 15, what is the first point on the agenda?,She wants to outsource it to India. (Unit 8, page 148),In the north of Canada. (Unit 6, page 110),That is Phil Gereluk from Edmonton, Canada. (Unit 5, page 89)
4、,The first point is the Burma project. (Unit 1, page 15),8. How old is Megan Martin? 9. Who is Petra Potts? 10. What is the name of the hotel where Sabine Cameron works as a receptionist? 11. Where did the 1998 Winter Olympic Games take place?,She is 14 years old. (Unit 2, page 24),She is a trade-fa
5、ir organiser. (Unit 2, page 34),The name of the hotel is Jameson Inn. (Unit 3, page 47),They took place in Japan. (Unit 3, page 50),12. Who talks about the new Berlin airport project? 13. Give three examples to show that you agree on a point. 14. Where does Mr. Adamski live? 15. Where is the GamesCo
6、m trade fair held?,I agree with you on that point. / Thats a fair suggestion. / So what youre saying is that . / In other words, you feel that . / You have a strong point there. / I think we can both agree that . / I dont see any problem with/harm in that. (Unit 1, page 10),He lives in Warsaw, Polan
7、d. (Unit 3, page 60),It is held in Cologne, Germany. (Unit 4, page 69),Bob. (Unit 1, page 4),16. Who is Julia Kitale? 17. Peter is having problems with his order. What did he order? 18. What are the names of the three delivery companies mentioned? 19. Where is the Polynesian Village resort?,He order
8、ed a table and six chairs. (Unit 7, page 127),UPS, FedEx and DHL. (Unit 6, page 114),It is at Walt Disney World. (Unit 7, page 130),She is an office worker in Kilimanjaro Textile Company, Nairobi, Kenya. (Unit 8, page 146),20. What colour is the iPod in the photo? 21. In which country are Kinder Sur
9、prise Eggs banned?,In America. (Unit 2, page 30),Its blue. (Unit 5, page 81),Book 3 Unit 1 -,Projects, Text (A), Text (B),People and issues Text (A),Text study,Background information,Words and expressions,Text,Looking at the text,Working with words,Listening,Listening 1,Listening 2,Listening 3,Book
10、3 Unit 1 -,Projects,Speaking,Text study,Background information,Words and expressions,Text,Looking at the text,Working with words,Book 3 Unit 1 -,Personal view Text (B),Speaking,Listening,Listening 4,Listening 5,Projects,Topics,Brief summary,Projects and project managers The problems that can arise d
11、uring a project How to deal with problems Different phases of a project People involved in a project,Brief summary of the unit,Skills,Listening: Listening to . two people talking about project problems two people discussing different phases of a project two people talking about the role of a project
12、 manager why deadlines are so important,Brief summary,Skills,Speaking: Role-playing: having a debate with the boss who has asked you to watch the workers and report back to him on the time they spend on tea breaks etc. Being able to agree or disagree with a person Reading a dialogue fluently Persona
13、lizing a board meeting,Writing: Writing an agenda Project: Writing an agenda for an imaginary dormitory meeting dealing with problems which have arisen there,Grammar Infinitive and gerund (1),Brief summary of the unit,Make a list of anything you think could be connected with the words above.,Warming
14、 up,new classroom equipment the size of classes new facilities, e.g. swimming pool new subjects on the curriculum,Warming up,Project New School,Directions: Here are some aspects of a project managers job. Give each of the pictures a subtitle from the choices listed in the box.,Focus 1,Focus,Focus 1,
15、Focus,The next stage of the job,Meeting the deadline,Different ideas,Communication problems Different ideas Meeting the deadline The next stage of the job Money problems On strike,Focus 2,Focus,Money problems,On strike,Communication problems,Communication problems Different ideas Meeting the deadlin
16、e The next stage of the job Money problems On strike,Background information Words and expressions Text,A project manager is the person responsible for leading a project from beginning to end. This includes planning, execution and managing the people, resources and scope of the project. The project m
17、anager should create clear and attainable objectives and see them through to successful completion. The project manager has full responsibility and authority to complete the assigned project. The project managers position may end with the completion of the assigned project, or it may be a semi-perma
18、nent position for a limited time or until a predetermined point in the projects schedule or stage of completion.,Background information-1,project manager,Text study (A),Text study (A),Background information Words and expressions Text,W you have to mention the positive aspects, too. We have to thank
19、the project manager for the _ (succeed) completion of the project. The team leader gave the project manager a _ (mean) look when he mentioned the time frame and the budget involved in the project.,WORKING WITH WORDS-B-3,referring,successful,meaningful,Working with words,Task 1 Task 2*,WORKING WITH W
20、ORDS-B-3,Working with words,Directions: Give a proper definition of the words used as the code names in the text.,ice: frozen water snowstorm: strong winds and a lot of snow avalanche: a lot of snow or rocks falling off a mountain fire: flames, light and heat laser: a very intense light,Task 1 Task
21、2*,Directions: Listen to Pete and Sally talking about what is involved in the monitoring of a project, and choose the correct answer for each question.,Monitoring a Project,LISTENING-B-1-1,Listening,Listening 4 Listening 5,1. When does monitoring start?_ a. It starts throughout the project. b. It st
22、arts on day one. c. It starts when the project manager decides.,b,LISTENING-b-1-2,2. What does this monitoring involve exactly?_ a. It involves the position of the project. b. It involves the importance of the project. c. It involves checking time, money, human and material resources spent on the pr
23、oject.,c,Listening,Listening 4 Listening 5,LISTENING-B-1-3,3. How do you monitor a project?_ a. You write down the structures and strategies involved in the project. b. You write down the names of the people involved in the project. c. You write down the code name of the project.,a,Listening,Listeni
24、ng 4 Listening 5,LISTENING-B-1-4,4. Why is monitoring so important?_ a. It is important to make sure that the project keeps within budget. b. It is important to make sure that the project is implemented according to the time of year. c. It is important to make sure that the project is implemented ac
25、cording to the schedule.,c,Listening,Listening 4 Listening 5,LISTENING-B-1-5,5. What can a project manager do about any problems that could affect a project? _ a. He has to find better workers and fire the bad ones. b. The problem has to be identified and corrected. c. The problem has to be properly
26、 documented.,b,Listening,Listening 4 Listening 5,Listening 4 Listening 5,Directions: Listen to Megan and Jonathan discussing the significance of deadlines in projects.,LISTENING-B-2-1,Listening,What kind of shampoo and rice does Megan buy? _ _,Megan always uses the same brand of shampoo and the same
27、 brand of rice.,Deadlines,Meeting deadlines is essential for The quality of our products and the fact that we meet deadlines I always buy the same brand of rice We have to look at all the different aspects Unless we know how big the project is and all the details involved The first stage in any proj
28、ect is It applies to all projects,so that is brand loyalty. we cannot plan accurately. all help to build up and strengthen the reputation of our company. regardless of their size or importance. gathering information. the successful project completion. that may affect the deadlines.,Listening 4 Liste
29、ning 5,LISTENING-B-2-2,Directions: Match the two parts of the sentences.,Listening,A Board Meeting,Directions: With a partner, practice reading this dialogue as fluently as you can.,SPEAKING-B-1,Speaking,Bob:First point on the agenda the Burma project. Where are we with that? Carol:Id like to say we
30、 are making progress, but Im not sure. Bob: Yes. Well, I heard that the men have been working around the clock to meet the deadline.,SPEAKING-B-2,Carol: That may be true but first I hear nothing from Mark, our project manager, for three weeks and then I get an email from him at the weekend wanting a
31、 quick answer about an increase in the budget. I told him no way, not in a million years could I give him a quick answer. I had to discuss it with the board first. Bob: Yes, he can be a bit slow in sending updates and he really is not good at communicating on a regular basis. And deadlines are alway
32、s a critical point with him.,Speaking,SPEAKING-B-3,Carol: I often wonder if he sometimes does something else on company time. Bob: Yes, I have thought that myself sometimes. But he does always meet the deadline, eventually. So, did he tell you why he wanted a budget increase? Carol: Yes, he said he
33、needed more resources. Bob:Did he go into detail? Carol: Yes, he did. Its in his latest update. Youll find most of the information outlined in the documents in front of you.,Speaking,Bob: These figures are interesting. Its clear to me that communication between Mark and management is not working as
34、it should. How can we improve this? Carol: Unfortunately, were almost out of time. I suggest we all submit our ideas and we can discuss them next week. Bob: So what will I tell Mark? Carol: Tell him that we have approved the increase but there will be no more delaying tactics or else we will have to
35、 think about finding a new project manager. Bob:Right, Ill do that.,SPEAKING-B-4,Speaking,SPEAKING-B-1,Speaking,Bob:First point on the agenda the Burma project. Where are we with that? Carol: Id like to say we are making progress, but Im not sure. Bob: Yes. Well, I heard that the men have been worki
36、ng around the clock 1 to meet the deadline.,Directions: Personalise the dialogue. Take the numbered elements in the dialogue and exchange them with the elements in the boxes to personalise it.,for days / 7 days a week / overtime / long hours,SPEAKING-B-2,Carol: That may be true but first I hear noth
37、ing from Mark, our project manager, for three weeks 2 and then I get an email from him at the weekend 3 wanting a quick answer about an increase in the budget 4. I told him no way, not in a million years could I give him a quick answer. I had to discuss it with the board 5 first. Bob: Yes, he can be
38、 a bit slow in sending updates and he really is not good at communicating on a regular basis. And deadlines 6 are always a critical point with him.,Speaking,for three months / for ages / since January,more money / more workers / more time / more holidays / more responsibility,you / the boss / the ch
39、airman / him,time frames / resources / workers / budgets,yesterday / last night / two hours ago / last week,SPEAKING-B-3,Carol: I often wonder if he sometimes does something else on company time. Bob: Yes, I have thought that myself sometimes. But he does always meet the deadline, eventually 7. So,
40、did he tell you why he wanted a budget increase 8 ? Carol: Yes, he said he needed more resources 9. Bob:Did he go into detail? Carol: Yes, he did. Its in his latest update. Youll find most of the information outlined in the documents 10 in front of you.,Speaking,in the end / with some delay / when i
41、t is planned / with no delay,more money / more workers / more time / more holidays / more responsibility,material / machines / people / workers,the email / the note / the letter / the file,SPEAKING-B-4,Bob: These figures are interesting. Its clear to me that communication between Mark and management
42、 is notworking as it should. How can we improve this? Carol: Unfortunately, were almost out of time. I suggest we all submit our ideas and we can discuss them next week 11. Bob: So what will I tell Mark? Carol: Tell him that we have approved the increase but there will be no more delaying tactics 12
43、 or else we will have to think about finding a new project manager. Bob:Right, Ill do that.,Speaking,tomorrow / next meeting / the day after tomorrow / next month,money demands / budget increase / lack of communication / problems,WRITING-1,Writing,A formal agenda should always contain the following
44、information: 1. The word Agenda 2. The name of the organisation, group or person calling the meeting 3. The date and time of the meeting 4. The meeting venue,An agenda is a written plan of topics to be discussed during a meeting. Having a suitable agenda prepared will make the meeting more efficient
45、 and your team achieve more. Here are some tips for writing an agenda.,Writing an Agenda,WRITING-2,Writing,5. Apologies 6. Minutes of the last meeting 7. Matters arising 8. Your meetings topics listed one after the other 9. Any other business 10. Date and time of next meeting,Send your agenda to the
46、 appropriate persons a couple of days before the meeting, along with any notes or pertinent information. This will give the members time to think about the points to be covered, thus ensuring more constructive input.,WRITING-3,Directions: The computer has mixed up the order of this agenda. Rewrite t
47、he agenda, putting the points into the correct order.,1. Budget issues 2. Room 301 3. Board of directors monthly project meeting 4. Reading of the minutes of the last meeting for approval 5. Deadline issues 6. Any other business 7. Resources questions,Writing,WRITING-4,8. Agenda 9. 10:30 a.m. Monday
48、, 31st March 10. The next meeting has been scheduled for 29th April at 11:30 a.m., Room 301 11. Mr. Blank, project manager, sends his apologies and will try to join the meeting later. The correct order is: _,8, 3, 9, 2, 11, 4, 1, 7, 5, 6, 10,Writing,WRITING-translation-1,Directions: Translate the fo
49、llowing sentences into Chinese.,Writing,1. No matter how talented a project manager is, if he cant manage his projects, then it will be difficult for him to be successful.,Translation,一个项目经理无论多有才华,倘若他不能掌控好手中的工程,那他就很难取得成功。,WRITING-translation-2,2. Underground parking is not a problem if I know this i
50、n advance and not find out after constructing the building foundations. But this cost the client a lot of money and resources.,如果我提前被告知而不是在打好大楼的地基之后才发现的话,那建一个地下停车场并不是什么问题,但现在这要花费客户大量的财力和物力。,Writing,WRITING-translation-3,3. There were many reasons for the delays such as a change in EU safety standard
51、s, a major building company involved went insolvent, the very cold winter stopped work and soundproofing the windows of the houses in the neighbouring suburbs had not been taken into account when planning the project.,有许多原因导致了项目延期,如欧盟安全标准的调整,相关的一家主要的建筑公司申请破产了,极寒天气耽误了施工,以及在规划项目时没有考虑到给邻近市郊区的房屋窗户隔音。,Wr
52、iting,WRITING-translation-4,4. It seems that from the outset, the local government official responsible for communicating with me had little to no interest in changing the current system. He kept putting me off and was never available to answer any questions.,似乎从一开始负责和我沟通的当地官员就对改造现有系统没什么兴趣。他一再敷衍我,从不
53、答复任何问题。,Writing,WRITING-translation-5,5. It was supposed to be launched on the market by a specific deadline, as the competition was close on their heels with a similar product.,该产品必须赶在某个特定期限之前投放市场,因为竞争者有同类产品紧随其后,即将上市。,Writing,WRITING-translation-6,6. The code names did create a number of problems t
54、hat could not be ignored and had to be dealt with immediately, e.g. the paperwork had to constantly be reworded and people were never sure who to talk to or where to file information or under which file to find information or how to refer to the project because it was never clear.,代号的不停变更确实带来了许多不容忽视
55、的问题,需要我们立即处理,如许多文书需要不停地改变措辞,遇到问题人们不知道找谁谈,或是文件在哪里归档,或是在哪个档案下可以找到需要的信息,又或是提到这个项目时该如何称呼,因为项目代号从未明确过。,Writing,GRAMMAR CHECK-1,Directions: Choose the correct answers. 1. Please tell me _ next? a. how to do b. what project to do c. what do I do d. how should I do,Grammar check,Infinitive and Gerund (1),b,
56、GRAMMAR CHECK-2,2. The project manager wasnt _ to complete the project by the deadline. a. too experienced b. enough experienced c. experienced enough d. so experienced,Grammar check,c,GRAMMAR CHECK-3,3. These days it is difficult for the untrained _ a job. a. find b. to find c. look d. to look for
57、4. Id prefer _ in China rather than _ a better job abroad. a. to work, to make b. work, take c. to work, to take d. stay, take,Grammar check,b,c,GRAMMAR CHECK-4,5. He was so inexperienced _ an impossible finishing date for the project. a. to give b. that give c. as to give d. for him to give 6. I still remember _ my first project when I was 25 years old. a. giving b. given c. being given d. to give,c,c,Grammar check,GRAMMAR CHECK-5,7. On our way to the building site, we _ lunch because we felt hungry. a. stopped to have b. stop to have c. stopped having d. stop h
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026中学教资智慧校园建设考点课件
- 2026中学教资教育法律救济途径课件
- 2026中学教资师范生报考政策解析课件
- A Everyday heroes (Viewing and listening)说课稿2025学年初中英语沪教版五四学制2024七年级下册-沪教版五四学制2024
- 小学生社交适应说课稿2025
- 生产安全规范细则
- 能源使用监管办法
- 2026年湖北省港航工程专业技术职务水平能力测试(港口工程初中级)经典试题及答案
- 废弃物处理全程留痕制度
- 会计岗位考试题及答案
- 2026届高考物理考前最后一课课件(考前指导)
- 2026四川省引大济岷水资源开发有限公司第二批次招聘68人考试备考试题及答案解析
- (正式版)JBT 11270-2024 立体仓库组合式钢结构货架技术规范
- 人教版高中生物必修一全套教案
- 05G514-3 12m实腹式钢吊车梁(中级工作制 A4 A5 Q345钢)
- 【小升初】部编版2022-2023学年小学六年级下学期语文升学分班考专项训练测试卷(名著阅读)含答案
- GB/T 26341-2010残疾人残疾分类和分级
- ISO45001职业健康安全管理体系培训
- 长方形和正方形的面积教学课件-人教版数学三年级下册
- 齐鲁医学截肢术
- 过热蒸汽管道水力计算
评论
0/150
提交评论