1、PASTE2017,Lei Guo 郭雷,Deputy General Manager of the Mine Department, China ENFI Engineering Corporation, China 中国恩菲工程技术有限公司矿山事业部 副总经理,Senior Engineer 高级工程师,Speaker/报告人:,Design and Construction of Paste Filling and Paste Stockpiling United Disposal System in Baiyinchagan Polymetallic,Lei Guo, China EN
2、FI engineering Co. Ltd., China Huilai Wang, China ENFI engineering Co. Ltd., China Xuesen Sun, China ENFI engineering Co. Ltd., China Jiguo Zhou, China ENFI engineering Co. Ltd., China Xinmin Liang, China ENFI engineering Co. Ltd., China,白音查干多金属矿全尾砂膏体充填与膏体堆存 联合处置系统设计和建设,目录,CONTENTS,概况 Introduction,全
3、尾砂膏体堆存系统 Paste Stockpiling System,全尾砂膏体联合处置系统 Unclassified Tailings Paste United Disposal System,05,结论 Conclusion,全尾砂膏体充填系统 Unclassified Tailings Paste Backfilling System,01.概况 No.1 Introduction,尾砂膏体充填和膏体堆存具有安全、高效、节能、环保等优点,在矿业发达国家被广泛认可并应用。 Tailings paste backfilling and paste storage at surface tech
4、nologies have the advantages of safety, high efficiency, energy saving and environmental friendliness. They are widely recognized and applied in the mining industry of developed countries.,中国恩菲于20世纪90年代初开始在国内进行膏体充填技术的研究与应用,设计的金川镍矿、铜绿山铜矿、会泽铅锌矿、冬瓜山铜矿和谦比西铜矿等矿山先后建成膏体充填系统并投入运行,该技术在我国得到迅速发展。 In the 1990 s
5、 China ENFI begun to research and develop the paste backfilling technology (Yu, 2011), and successively established and put into operation paste backfilling systems in the Jinchuan Nickel Mine, Tonglushan Copper Mine, Huize Lead-Zinc Mine, Dongguashan Copper Mine and Chambishi Copper Mine. The techn
6、ology has been rapidly developing in China.,目前,我国尾砂膏体堆存技术仍处于起步阶段,在运行尾矿膏体堆存系统的规模化矿山主要有乌奴格吐山铜钼矿和包头白云鄂博西矿。 But at present, paste storage technology in China is still in preliminary stage, only two paste storage systems are in large scale application. Which are Wunugetushan Copper, Molybdenum Mine and B
7、aiyunebo West Mine.,白音查干多金属矿地处内蒙古西乌珠穆沁旗,矿区以残山丘陵与准平原草原景观区为主,植被较发育,覆盖程度较高。矿体为多金属矿,主要含有铅、锌、银、铜、锡等。 Baiyinchagan Polymetallic Mine located in the Xiwuzhumuqinqi, Inner Mongolia. The mine area is mainly composed of hills and prairie landscape and widely covered by the vegetation. Polymetallic ore bodies
8、have been discovered, with the main contained metals of lead, zinc, silver, copper and tin.,01.概况 No.1 Introduction,2014年6月,中国恩菲完成该矿初步设计,随后开展施工图设计,同年开始建设。2016年9月,矿山基建完成,目前处于试生产阶段。 In June 2014, China ENFI had completed the preliminary and detailed designs for the mine and started infrastructure cons
9、truction at the same year. In September 2016, the mine completed infrastructure construction and turned into trial production.,设计生产规模为5000t/d,分两个系统,铅锌系统2500t/d,铜锡系统2500t/d,采用地下开采方式。主斜坡道开拓,分段空场嗣后充填采矿法和上向水平分层充填采矿法,全尾砂膏体充填和膏体堆存。 The designed production rate is 5000 t/d, with two processing streams comp
10、rising a 2500 t/d of Lead-Zinc system and a 2500 t/d of Copper-Tin system. The underground mine uses a main ramp development system and sublevel open stoping and a bottom-up cut and fill method. The unclassified tailing paste backfilling system and paste stockpiling systems have been established.,01
11、.概况 No.1 Introduction,02. 全尾砂膏体充填系统 No.2 Unclassified Tailings Paste Backfilling System,矿区地表主要为林地和牧民的草场,生态保持的要求高,适合膏体充填技术的应用。 The surface of the mining area was mainly composed of forest and grasslands for local herdsmen. and the area has a strict regulations for the protection of ecology and enviro
12、nment. Which is suitable for the application of paste filling technology.,全尾砂膏体充填系统包括膏体制备、输送和采场充填。选矿厂生产的全部尾砂送至充填搅拌站,经充填搅拌站内的深锥浓密机浓缩后,制备合格的充填料浆,通过浓料输送泵送至井下采场空区进行充填。 The unclassified tailings paste backfilling system consists of paste preparation, transportation and stope filling. All the tailings has
13、 been sent to the filling station for tailings thickening by using deep cone thickeners, and then delivered to the underground working area through slurry pumps and pipelines.,充填设施主要包括地面充填搅拌站、充填钻孔和输送管路等。充填搅拌站主要设施及设备包括尾砂浓缩设备、水泥仓、水泥给料设备、两级卧式搅拌机和浓料输送泵。 Filling facilities mainly include an underground p
14、reparation station, backfill drilling holes and pipelines. The main facilities and equipment of the preparation station include tailings thickening equipment, cement silos, cement feeding equipment, two-stage horizontal mixers and slurry pumps.,02. 全尾砂膏体充填系统 No.2 Unclassified Tailings Paste Backfill
15、ing System,膏体制备和输送 Paste Preparation and Transportation 充填搅拌站共设2台深锥浓密机和3套充填料浆制备及输送系统 The surface backfill preparation station is equipped with 2 deep cone thickeners and 3 sets of backfill slurry preparation and transportation systems 14m深锥浓密机2台 2 sets of 14 m deep cone thickeners 水泥仓3座 3 cement sil
16、os 双轴叶片搅拌机3台、双螺旋搅拌机3台、浓料输送泵3台 3 biaxial-bladed mixers, 3 double-helix mixers, 3 slurry pumps and related instruments monitoring system,02. 全尾砂膏体充填系统 No.2 Unclassified Tailings Paste Backfilling System,正常生产时,2台深锥浓密机同时工作,料浆制备及输送系统2套工作1套备用。 Two sets of deep cone thickeners operate simultaneously togeth
17、er with 2 sets of slurry preparation and transportation systems during normal production, at the same time, The third set of slurry preparation and transportation systems standby. 单套系统制备能力(80-100)m/h,每套均可用于全尾砂胶结充填和非胶结充填。 The preparation capacity of each deep cone thickener is 80 to 100 m/h. Each set
18、 can be used for unclassified tailings cemented as well as uncemented filling.,02. 全尾砂膏体充填系统 No.2 Unclassified Tailings Paste Backfilling System,膏体制备系统图 System diagram of paste preparation,井下充填系统 Underground Filling System 充填钻孔3条,两工一备,钻孔为垂直钻孔,直径350mm。充填钻孔内敷设套管,套管外采用水泥砂浆封填,套管选择双金属复合耐磨管,外=219mm。 The u
19、nderground backfilling system has 3 vertical boreholes in total, each with the a diameter of 350 mm. Bimetal composite wear-resistant casing has been laid in each borehole, with an external diameter of 219 mm.,平巷中充填管选用陶瓷内衬复合钢管,外=194mm。 The pipeline in the underground access is a ceramic-lined steel
20、composite pipe with the external diameter of 194 mm. 采场内敷设的充填管选矿用树脂管。 The filling pipe in the stope comprises a mine resin tube whose performance matches the ceramic-lined steel composite pipe.,02. 全尾砂膏体充填系统 No.2 Unclassified Paste Backfilling System,井下充填系统图 Diagram of the Underground Filling System
21、,采场充填 Stope Filling 分段空场嗣后充填采矿法 Sublevel Open Stoping Mining Method 一步骤采场采用全尾砂胶结充填,底部和顶部采用4m6m灰砂比14的胶结充填,中间采用灰砂比110的胶结充填。 The first-stage of backfilling adopts unclassified tailings cemented filling. Approximately 4 to 6m of cemented backfill are placed in separate stages at the bottom and at the to
22、p of the stope with the cement vs. tailings ratio of 1: 4.For the middle stope, the cement vs. tailings ratio of the cemented fillings is 1:10. 二步骤采场底部和顶部各采用4m6m灰砂比14的胶结充填,中间采用全尾砂非胶结充填。 In the second-stage filling, there is a small difference from the first-stage. unclassified tailings uncemented fi
23、ll was used to backfill the middle stope.,02. 全尾砂膏体充填系统 No.2 Unclassified Paste Backfilling System,分段空场嗣后充填采矿法 Sublevel Open Stoping Mining Method,采场充填 Stope Filling 上向水平分层充填采矿法 Bottom-up Cut and Fill Mining 每一中段的首采分层胶结充填4m6m高,灰砂比为14。 The height of the first mining layer of each level is filled with
24、 cemented fillings for 4-6 m at cement vs. tailings ratio of 1: 4. 其它分层充填4m高,其中底部非胶结充填3.7m厚,其上再充填0.3m厚、灰砂比为14的胶结面层。 Subsequent layers were filled for 4 m height by cemented fill, 3.7 m was filled with uncemented filling and the top 0.3 m was filled by cemented fill at cement vs. tailings ratio of 1:
25、 4.,02. 全尾砂膏体充填系统 No.2 Unclassified Tailings Paste Backfilling System,上向水平分层充填采矿方法图 Bottom-up Cut and Fill Mining,03. 全尾砂膏体堆存系统 No.3 Paste Stockpiling System,矿区干旱少雨且蒸发量大,适合尾矿膏体堆存技术的应用。 The mine area is arid and experiences high evaporation rates, which is suitable for the application of paste tailin
26、gs stacking technology. 全尾砂膏体堆存系统包括膏体制备、输送和排放。 The unclassified tailings paste storage system includes paste preparation, transportation and discharge facilities. 选矿厂排出的全部尾矿矿浆经深锥浓密机浓缩,浓缩后的膏体尾矿经尾矿输送泵站和管道输送至尾矿库进行膏体堆存。 The deep cone thickener concentrates the tailings slurry and then the concentrated p
27、aste tailings is transported to the tailings storage facility (TSF) through the tailings pump station and pipelines.,膏体制备和输送 Paste Preparation and Transportation 尾矿输送泵站 Tailings pump station 1台矿浆贮槽 1 slurry tank which is equipped with an agitator. 2台离心式喂料泵,1用1备 2 centrifugal feed pumps (one operatin
28、g, one standby) . 2台隔膜泵,1用1备,参数:Q=200m3/h,P=8.0MPa 2 diaphragm pumps with frequency control (one operating, one standby). The flowrate of each diaphragm pump is 200 m3/h, and the pressure is 8.0 MPa.,03. 全尾砂膏体堆存系统 No.3 Paste Stockpiling System,尾矿输送管道 Tailings transport 2条DN200管道交替使用,每条长约7000m There
29、are two DN200 tailings transport pipelines between the tailings pump station and the TSF, and the two pipes are used alternately. The length of Each pipeline is approximately 7000 m . 1条管道为陶瓷复合钢管,1条管道为无缝钢管 One is a ceramic composite pipe, while the other is a seamless steel pipe.,03. 全尾砂膏体堆存系统 No.3
30、Paste Stockpiling System,尾砂膏体制备及输送工艺流程示意图 Flow chart of the paste tailings preparation and transportation process,膏体排放 Paste Tailings Discharge 尾矿库周边筑坝,总库容约1427.1万m3,服务年限20年。 the total storage capacity is approximately 14.271 million m3, which could meets production requirements for 20 years. 尾矿库进行全
31、库防渗 The tailings pond is lined with an HDPE geomembrane to minimize the permeation. 采用库尾放矿和周边放矿型式进行集中轮流放矿 The paste tailings discharge at the ends or around the storage facility in turns.,03. 全尾砂膏体堆存系统 No.3 Paste Stockpiling System,尾矿设施平面布置图 Layout of the TSF,04. 全尾砂膏体联合处置系统 No.4 Unclassified Tailin
32、gs Paste United Disposal System,系统简述 System Description 选矿厂生产的全部尾砂送至充填搅拌站,经深锥浓密机浓缩,充填时,制备合格的充填料浆,通过浓料输送泵送至井下采场空区进行充填。 All of the tailings sent to backfill station, then thickened by the deep cone thickeners. The slurry filled underground working area via the slurry pumps, after it meets the requirem
33、ent. 当采场不充填时,全部尾矿经深锥浓密机浓缩后输送至尾矿输送泵站,由隔膜泵及管道输送至尾矿库进行膏体堆存。 When the filling operation suspend, the thickened slurry diverted to the discharge pump station, and then pumped to the TSF through the diaphragm pumps and pipelines.,全尾砂膏体联合处置系统示意图 Schematic of the unclassified tailings paste united disposal
34、system,系统建设情况 System Construction Situation 2015年开始施工建设充填搅拌站和尾矿输送泵站,建设过程较为顺利,2016年9月建设完成。 The construction of filling station and discharge pumping station started in 2015 and completed in the September 2016. 目前,井下未开始正式采矿,没有可供充填的采空区,无法对井下充填系统进行测试,但对深锥浓密和尾砂膏体堆存系统进行了试运行,直到目前,系统运行稳定。 At present, the mine has not yet been officially put into production and there are no mined-out areas available for testing the pa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年大学大一(建筑学)建筑制图基础综合测试题及答案
- 护理部护理实践技能评估
- 2025年前台电子练习卷
- 护理质量改进的领导力
- 临床医学教材课件内科学第八篇风湿性疾病第六章抗磷脂综合征
- 小学语文部编版习作教学策略应用于案例分析
- 2026六年级数学上册 分数除法学习策略
- 2026六年级数学上册 百分数计算技巧
- 2026年医疗废物规范化管理督导工作计划
- 消防安全隐患排查整治方案
- 2025年税务局上海面试题及答案
- 二方审核管理办法
- 北京政务云管理办法
- 学堂在线 雨课堂 学堂云 工程伦理2.0 章节测试答案
- 道法人须有自尊课件-+2024-2025学年统编版道德与法治七年级下册
- 2.3地域文化与城乡景观 课件
- T/CIE 115-2021电子元器件失效机理、模式及影响分析(FMMEA)通用方法和程序
- 国土空间规划概述
- GB 5768.1-2025道路交通标志和标线第1部分:总则
- 《水遇冷以后》说课(附反思板书)(课件)四年级下册科学苏教版
- 园长陪餐管理制度
评论
0/150
提交评论