市政工程技术专业英语_第1页
市政工程技术专业英语_第2页
市政工程技术专业英语_第3页
市政工程技术专业英语_第4页
市政工程技术专业英语_第5页
已阅读5页,还剩3页未读, 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、市政工程技术专业英语 短文翻译 班级:市政09 学号:8 姓名:刘哲 The urban drainage problems countermeasures1 straighten out the management systemOne is the integration of resources, straighten a relation. It is suggested to establish a unified and coordinated management of the capacity of institutions, housing and urban and Rur

2、al Construction Bureau, bureau of Public Utilities Commission has certain administrative functions, is responsible for the city water system management, drainage, sewage facilities planning and construction management, and the thermal power plant electric, nearly two years to become city farming pla

3、toon is incorporated into the unified management. Two is to strengthen the construction of legal system. Develop city drainage license, moat management, development and utilization of water resources and other normative documents, normative drainage license, moat management behavior, strengthening d

4、rainage management functions.2 implement a reasonable diversion of rain and sewageTo improve the citys water capacity and self-cleaning ability, river dredging, sewage interception down. Two of the city drainage pumping station storage pool implementation of diversion of rain and sewage management.

5、The regulation of sewage are physically separated Chi Yu and ecological management, ensure the sewage into the sewage treatment center dealing with most rain cistern, the supernatant is directly discharged into the Yellow River. Three is for the new city of strict rain sewage diversion, combined wit

6、h water-saving city, using a device to collect rainwater, using ecological control of initial rainwater pollution, rainwater can be discharged into the Yellow River after the preliminary purification, sewage enters the pump reservoir directly to sewage treatment plant.3 strengthening drainage pipe n

7、etwork constructionFrom the whole nation, many our country city and area often only to sewage treatment plant as a key project to treat, relax with the support of the sewage pipe network construction. With the rapid development of Baiyin City, despite the new alterations in a number of drainage faci

8、lities, but the overall level is still relatively backward. Most network or old, old, paste, some real estate developers a convenient underground pipe network graph, not planned feeder, a branch pipe and main pipe was not built or does not connect, drainage is not smooth. Plus network construction f

9、unds, investment efficiency is not obvious, the construction of large pressure. In the future, should pay attention to the construction of pipe network, to achieve the drainage pipe network construction and sewage treatment plant construction synchronism to carry out integration.4 improve the draina

10、ge capacityIn recent years the silver city construction investment will exceed yuan, city builds area will be expanded to 100 km2, really into the planning and construction of drainage pumping station with no one. The city drainage is both an opportunity and a challenge, a hand with city constructio

11、n and development of drainage facilities at the same time, at the same time, at the same time construction planning design, timely put into use; on the other hand should widen train of thought, adopt BT, BOT, the issuance of bonds and other forms of financing to raise funds, the construction of drai

12、nage facilities funds into government urban construction financing system. At the same time, the construction of drainage facilities into the sewage treatment fee to use category, reasonable configuration resource, do greatly strong city drainage.5 introduction and cultivation of talents, to ensure

13、a career to developOn the one hand the professional and technical personnel to adopt a flexible and diverse ways, such as by employing a way to introduce a number of professional and technical personnel to augment the basic level; on the other hand to the existing staff training, improve their profe

14、ssional skills, to meet the requirements of the development of the drainage works.City drainage with city development an important infrastructure, therefore, we must straighten out the city drainage system, intensify the building of financial support strength, do well infrastructure construction, co

15、ordination of sewage treatment, transportation and other related issues, to city drainage system has perfect function, make the city water environment of this artery smooth, ensure the city ecology system of benign loop, to protect the city living environment, promote the sustainable development of

16、social economy.翻译结果重试抱歉,系统响应超时,请稍后再试 支持中文、英文免费在线翻译 支持网页翻译,在输入框输入网页地址即可 提供一键清空、复制功能、支持双语对照查看,使您体验更加流畅城区排水问题解决对策1理顺管理体制 一是整合资源,理顺关系。建议组建一个具有统一协调管理能力的机构,受住房和城乡建设局、公用局委托具有一定行政管理职能,负责对城区水系治理、排水、污水规划及其设施建设等进行综合管理,并将火电厂电排、近两年要成为城区的农排纳入统一管理。二是加强法制建设。制定城市排水许可、护城河管理、水资源开发利用等规范性文件,规范排水许可、护城河管理等行为,强化排水管理职能。 2实施

17、合理的雨污分流 一是对包括护城河在内的老城区进行综合改造。提高城市的含水能力和自洁能力,疏通河道,截污顺流。二是对城区排水泵站调蓄池实施雨污分流治理。将调蓄池雨污进行物理分隔并进行生态治理,保证污水大部分进入污水处理中心处理,雨天蓄水池上清液直接排进黄河。三是对于新建城区要实行严格的雨污分流,结合节水型城市工作,采用装置收集部分雨水,采用生态绿地控制初期雨水污染,雨水经初步净化后可排入黄河,污水进入泵站蓄水池后直接送到污水处理厂。 3加强排水管网建设 从全国来说,我国不少城市和地区往往只把污水处理厂作为重点工程对待,放松与之相配套的污水管网建设。白银市随着城市的快速发展,尽管新建改建了一些排水

18、设施,但是总体水平仍然较落后。大多管网还是老、旧、糊,一些房产商图一时方便,地下管网不按规划接驳,支管未建或支管与主管连接不上,排水不通畅。加上管网建设资金大,投资回报效率不明显,建设压力大。今后,要重视管网建设,要做到排水管网建设与污水处理厂一体化建设同步实施。 4多元投资,提高排水能力 近两年白银城市建设投资将超过100亿元,城市建成区将扩大到100 km2,真正进入建设规划的排水泵站一个也没有。这对城市排水事业既是机遇又是挑战,一方面要随城市建设发展对排水设施同时规划、同时设计、同时建设、及时投入使用;另一方面要拓宽思路,采取BT、BOT、发行债券等多种融资形式筹措资金,将排水设施建设资金纳入政

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论