农田水利工程设计说明_第1页
农田水利工程设计说明_第2页
农田水利工程设计说明_第3页
农田水利工程设计说明_第4页
农田水利工程设计说明_第5页
已阅读5页,还剩6页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、名山县红星镇余坝村、天王村、华光村土地整理项目施工单体图第二部分 农田水利工程四川省地震局测绘工程院二一一年二月to develop the details of the project quality assurance systems and quality assurance goals and supervise the quality inspection departments. Quality Department is supervising quality assurance Department, directly responsible to the Chief Engi

2、neer, by controlling the raw materials, sample testing and construction process and quality control purposes. Quality Department the right to endanger the quality of construction and operation to be rejected or stopped. Substandard raw materials and not conducive to construction quality of technolog

3、y . 14.2.3 quality supervision and inspection system in order to ensure quality, the project shall be to establish a series of systems: quality assurance program; Construction technical supervision systems; Construction site management system; Construction triage and technical implementation of the

4、programme; Quality of project reports; Site acceptance of materials, sample testing; Concrete test and mixture ratio determination; Other inspection system of supervision engineer is required. 14.2.4 quality management measures 1, job training to enhance staff quality consciousness, enhance quality,

5、 ensure quality assurance goals. 2, according to the scientific, standardized, procedures, standardized operation, implementation of personnel, posts, site inspection and acceptance procedures. 3, technicians and construction team leader before the familiar with the drawings, quality standards and q

6、uality requirements specified in the contract, while explicitly project developed by the Ministry of construction and the quality objectives. 4, technical Department Chief Engineer leading the project construction organization plan, submitted to the audit supervision engineer. 5, quality manageme5名山

7、县红星镇余坝村、天王村、华光村土地整理项目施工单体图项目承担单位:名山县国土资源局项目编制单位:四川省地震局测绘工程院负责人:审核人:编制人:编制日期:二一一年二月总体设计说明一、设计依据1)土地开发整理项目初步设计规范(TD/T1012-2000);2)土地开发整理项目验收规程(TD/T1013-2000);3)水利建设项目经济评价规范(SL72-94);4灌溉与排水工程设计规范(GB/50288-99);5)公路桥涵设计通用规范JTGD60-2004;6)农田排水工程技术规范SL/T4-1999;7)雨水集蓄利用工程技术规范SL267-2001;8)水土保持综合治理技术规范GB/T1645

8、3.1-16453.6-1996;9)四川省中部丘陵地区改造中低产田项目技术工作要点(试行);10)地面水环境质量标准(GB3838-2002);11)农田灌溉水质量标准(GB5084-2005);12)1:500,1:2000实测地形图(GB/T7929-1995);13)堤防工程设计规范(GB50286-1997);14)渠道防治工程技术规范(SL18-1991);15)水利水电工程制图标准(SL73-1995);16)四川省土地开发整理项目工程建设标准(四川省国土资源厅颁,试行);17)节水灌溉技术规范,水利部农村水利司。二、设计原则1)灌溉渠道、排水沟、灌排建筑物属于5级及以下工程。水

9、利交叉建筑物标准按SDJ2171987规定的五级建筑物标准。2)设计灌溉保证率为75%,保证设计的过水能力,边坡安全稳定和水流通畅;农田灌排工程建设本着因地制宜、因害设防的原则,布置灌溉排水渠道系统。3)项目区灌溉水质应符合农田灌溉水质标准(GB5084-2005),禁止用未经过处理过的污水灌溉农田。4)项目区渠系采用灌排相结合的方式。三、基本资料1)雅安市名山县百丈镇、红星镇华光村等六个村土地整理项目可行性研究报告及报四川省国土局立项材料;2)雅安市名山县百丈镇、红星镇华光村等六个村土地整理项目初步规划设计成果;3)项目区1:2000实测地形图;4)名山县国民经济统计资料(2004年),名山

10、县统计局编;5)名山县志,名山县县志编纂委员会,1994年;6)名山县国土志,名山县国土志编纂领导小组,2000年;7)名山县水利志,名山县水利志编辑组,1990年;8)名山县土壤,名山县土壤普查办公室编,1984年;9)名山县气象资料,名山县气象局提供,2003年12月;10)名山县水资源开发利用现状分析报告;11)名山县土地利用现状详查报告;四、主要建筑物设计1) 新建蓄水池项目区旱地分布在丘区坡地,单片耕地面积小,发展集中提灌和渠灌有一定困难,目前当地旱地灌溉改良措施以兴建蓄水池为多。根据农业生产要求和蓄水池功能设置,蓄水池修建在有良好汇流面的坡面,并配套沉沙池、引水渠等设施。蓄水池采用

11、圆形结构,容积为100m3,直径8m,高2.4m,共3口。池壁用M7.5水泥砂浆砌砖,池底用C20砼现浇。池内设砼台阶,方便农民取水和维修。在池顶布置防护栏,在水池侧布置一条引水渠和一口沉沙池,用来聚集坡面汇流和沉沙,引水沟为0.240.30m矩型断面浆砌砖;沉沙池为1.51.2m,临蓄水池布置,方形,用M7.5浆砌砖。2) 整治农渠整治现有农渠20条,长13734m,其中标准为0.50.5m 的浆砌砖矩形沟18条,长13354m,设置过沟盖板62处,其中17#、21#和27#整治农渠中各有70m、42m和23m经过农户房前需采用盖板修建;标准为0.80.8m 的浆砌砖矩形沟3条,长380m,

12、设置过沟盖板1处。3) 整治排水沟整治排水沟共18条,长6694m,分为2种规格,其中上宽为1.18m宽的梯形沟16条,长5557m,设置过沟盖板46处;上宽为1.5m宽的梯形沟2条,长1137m,设置过沟盖板11处。4) 桥涵沟渠与道路相交处设置涵管,涵管置于道路之下50cm处。项目区共埋设500mm沟渠涵管8处,长38m;埋设500mm田间道涵管90处,长361m;埋设1000mm田间道涵管13处,长58m;田间道桥2座。五、 施工要求1) 渠基处理要密实,回填土干容重不得低于1.8t/m3,渠道按设计的断面开挖后,要求修削平整,夯实渠底、渠坡,以免混凝土受力不均而开裂。2) 渠道改建工程

13、的渠线位置可以根据实际地形做局部调整。3) 浆砌石工程所使用的条石、块石,运至工地后,砌筑前应清洗干净。4) 浆砌石施工应在确保开挖断面后进行,采用坐浆法。砌筑前先清基,同一层面应保持平衡升高,上下层或同一层前后的石块砌缝应错开,避免形成通缝,大缝用小石块楔紧,确保浆满面平。5) 防渗用砂浆应采用P.0.32.5以上的普通硅酸盐水泥。清缝应在料石砌筑24h后进行,缝宽不下于砌缝宽度,缝深不小于缝宽2倍,勾缝前必须将槽缝冲洗干净,不得残留灰渣和积水,并保持缝面湿润。勾缝砂浆必须单独搅制,严禁与砌体砂浆混用。当勾缝完成和砂浆初凝后,砌体表面应刷洗干净,至少用湿润物覆盖保持21天,在养护期间应经常洒

14、水,使砌体保持湿润,避免碰撞和震动。6) 蓄水池位置可根据实际需要做适当调整,砌砖体的灰缝横平竖直,厚薄均匀,并填满砂浆;砌砖体水平灰缝的砂浆应饱满,实心砌砖体水平灰缝的砂浆饱满度不得低于80%,竖向灰缝宜采用挤浆或加浆方法,使其砂浆饱满,严禁用水冲浆灌缝。容积100m3蓄水池工程量统计表 项目单位(口)土方开挖(m3)土方回填(m3)C20混凝土(m3)M7.5水泥砂浆浆砌砖(m3)M10水泥砂浆抹面(m2)C25混凝土板(m3)M5砂浆砌空花砖栏杆(m3)C20砼钢筋防护栏柱(m3)钢筋(kg)每口工程量1159.9614.868.9923.1596.790.681.160.2445.72

15、合计工程量3479.8944.5826.9769.45290.362.033.490.73137.16整治农渠(0.5m)工程量统计表村名整治农渠编号长度(m)沟底清淤(m3)土方开挖(m3)土方回填夯实(m3)浆砌砖(m3)C15砼基础(m3)C15砼压顶(m3)M7.5砂浆抹面2cm(m2)盖板(处)C20砼盖板(m3)盖板钢筋(kg)余坝村9#整治农渠105 8.39 25.16 15.63 14.55 4.18 5.23 104.50 0 0.00 0.00 10#整治农渠1496 120.04 360.12 223.80 208.24 59.84 74.80 1496.00 7 0.

16、70 22.96 11#整治农渠396 31.78 95.33 59.24 55.12 15.84 19.80 396.00 1 0.10 3.28 12#整治农渠891 71.49 214.48 133.29 124.03 35.64 44.55 891.00 4 0.40 13.12 13#整治农渠902 72.38 217.13 134.94 125.56 36.08 45.10 902.00 4 0.40 13.12 15#整治农渠1122 90.03 270.09 167.85 156.18 44.88 56.10 1122.00 5 0.50 16.40 16#整治农渠176 14

17、.12 42.37 26.33 24.50 7.04 8.80 176.00 0 0.00 0.00 17#整治农渠528 42.37 127.10 78.99 73.50 21.12 26.40 528.00 5 7.20 16.40 18#整治农渠561 45.01 135.04 83.93 78.09 22.44 28.05 561.00 2 0.20 6.56 19#整治农渠633 50.75 152.26 94.62 88.04 25.30 31.63 632.50 3 0.30 9.84 小计6809 546.35 1639.06 1018.63 947.81 272.36 340

18、.45 6809.00 31 9.80 101.68 天王村21#整治农渠578 46.34 139.02 86.39 80.39 23.10 28.88 577.50 4 4.40 13.12 22#整治农渠539 43.25 129.75 80.63 75.03 21.56 26.95 539.00 2 0.20 6.56 23#整治农渠869 69.73 209.19 130.00 120.96 34.76 43.45 869.00 4 0.40 13.12 小计1986 159.32 477.95 297.03 276.38 79.42 99.28 1985.50 10 5.00 32

19、.80 华光村24#整治农渠1320 105.92 317.75 197.47 183.74 52.80 66.00 1320.00 6 0.60 19.68 25#整治农渠1045 83.85 251.55 156.33 145.46 41.80 52.25 1045.00 5 0.50 16.40 26#整治农渠919 73.70 221.10 137.41 127.86 36.74 45.93 918.50 4 0.40 13.12 27#整治农渠638 51.19 153.58 95.44 88.81 25.52 31.90 638.00 3 2.50 9.84 28#整治农渠638

20、51.19 153.58 95.44 88.81 25.52 31.90 638.00 3 0.30 9.84 小计4560 365.85 1097.56 682.10 634.68 182.38 227.98 4559.50 21 4.30 68.88 合计13354 1071.52 3214.57 1997.76 1858.88 534.16 667.70 13354.00 62 19.10 203.35 备注:17#、21#和27#整治农渠中各有70m、42m和23m经过农户房前需采用盖板修建整治农渠(0.8m)工程量统计表村名编号长度(m)沟底清淤(m3)土方开挖(m3)土方回填夯实(

21、m3)浆砌砖(m3)C15砼基础(m3)C15砼压顶(m3)M7.5砂浆抹面2cm(m2)盖板(处)C20砼盖板(m3)盖板钢筋(kg)余坝村14#整治农渠215 23.6594.60 53.75 70.18 17.20 10.75 258.00 1 0.19 8.67 20#整治农渠165 18.1572.60 41.25 53.86 13.20 8.25 198.00 0 0.00 0.00 小计380 41.80 167.20 95.00 124.03 30.40 19 456 1 0.19 8.67 合计380 41.80 167.20 95.00 124.03 30.40 19 45

22、6 1 0.19 8.67 整治排水沟(1.18m)工程量统计表村名整治排水沟编号长度(m)沟底清淤(m3)土方开挖(m3)土方回填夯实(m3)C15砼渠底(m3)C20砼预制板(m3)C20砼预钢筋(kg)C15砼压顶(m3)盖板(处)C20砼盖板(m3)盖板钢筋(kg)C15反包边2cm(m2)余坝村18#693 149.69 299.38 166.32 29.11 74.71 842.13 33.26 6 1.08 45.31 1239.68 19#495 106.92 213.84 118.80 20.79 53.36 601.52 23.76 4 0.72 30.21 885.48

23、小计1188 256.61 513.22 285.12 49.90 128.07 1443.66 57.02 10 1.80 75.52 2125.16 天王村20#451 97.42 194.83 108.24 18.94 48.62 548.06 21.65 4 0.72 30.21 806.77 21#583 125.93 251.86 139.92 24.49 62.85 708.46 27.98 5 0.90 37.76 1042.90 23#490 105.73 211.46 117.48 20.56 52.77 594.84 23.50 4 0.72 30.21 875.64 2

24、4#165 35.64 71.28 39.60 6.93 17.79 200.51 7.92 1 0.18 7.55 295.16 小计1689 364.72 729.43 405.24 70.92 182.02 2051.87 81.05 14 2.52 105.73 3020.48 华光村26#1188 256.61 513.22 285.12 49.90 128.07 1443.66 57.02 11 1.98 83.07 2125.16 27#176 38.02 76.03 42.24 7.39 18.97 213.88 8.45 1 0.18 7.55 314.84 28#105 2

25、2.57 45.14 25.08 4.39 11.27 126.99 5.02 1 0.18 7.55 186.94 29#57 12.36 24.71 13.73 2.40 6.17 69.51 2.75 0 0.00 0.00 102.32 30#39 8.32 16.63 9.24 1.62 4.15 46.79 1.85 0 0.00 0.00 68.87 31#220 47.52 95.04 52.80 9.24 23.72 267.34 10.56 2 0.36 15.10 393.55 32#99 21.38 42.77 23.76 4.16 10.67 120.30 4.75

26、0 0.00 0.00 177.10 33#523 112.86 225.72 125.40 21.95 56.33 634.94 25.08 5 0.90 37.76 934.68 34#110 23.76 47.52 26.40 4.62 11.86 133.67 5.28 1 0.18 7.55 196.77 35#165 35.64 71.28 39.60 6.93 17.79 200.51 7.92 1 0.18 7.55 295.16 小计2681 579.03 1158.06 643.37 112.59 288.98 3257.59 128.67 22 3.96 166.15 4

27、795.38 合计5557 1200.36 2400.71 1333.73 233.40 599.07 6753.11 266.75 46 8.28 347.40 9941.02 整治排水沟(1.5m)工程量统计表村名整治排水沟编号长度(m)沟底清淤(m3)土方开挖(m3)土方回填夯实(m3)C15砼渠底(m3)浆砌卵石(m3)C15砼压顶(m3)盖板(处)C20砼盖板(m3)盖板钢筋(kg)M7.5砂浆抹面2cm(m2)C15反包边2cm(m2)天王村22#627 361.15 722.30 150.48 31.35 413.82 37.62 6 1.26 135.10 807.56 125

28、.40 小计627 361.15 722.30 150.48 31.35 413.82 37.62 6 1.26 135.10 807.56 125.40 华光村25#510 293.76 587.52 122.40 25.50 336.60 30.60 5 1.05 112.59 656.87 102.00 小计510 293.76 587.52 122.40 25.50 336.60 30.60 5 1.05 112.59 656.87 102.00 合计1137 654.91 1309.82 272.88 56.85 750.42 68.22 11 2.31 247.69 1464.43

29、 227.40 沟渠涵管(500mm)工程量统计表村名沟渠编号涵管数涵管长度(m)开挖土方(m3)回填夯实土方(m3)C15垫层15cm(m2)C30砼(m3)钢筋制安(kg)余坝村10#整治农渠145.20 3.78 0.29 0.20 21.80 17#整治农渠167.80 5.67 0.44 0.30 32.70 18#整治农渠145.20 3.78 0.29 0.20 21.80 天王村23#整治农渠145.20 3.78 0.29 0.20 21.80 华光村24#整治农渠2810.40 7.56 0.59 0.40 43.60 25#整治农渠145.20 3.78 0.29 0.2

30、0 21.80 25#整治排水沟1810.40 7.56 0.59 0.40 43.60 合计83849.4035.912.791.90207.10田间道涵管(500mm)工程量统计表村名田间道编号500mm涵管(处)涵管长度(m)开挖土方(m3)回填夯实土方(m3)C15垫层15cm(m3)C30砼(m3)钢筋制安(kg)余坝村18#整治田间道416 11.20 15.12 1.18 0.80 87.20 19#整治田间道416 11.20 15.12 1.18 0.80 87.20 20#整治田间道28 5.60 7.56 0.59 0.40 43.60 21#整治田间道28 5.60 7

31、.56 0.59 0.40 43.60 22#整治田间道312 8.40 11.34 0.88 0.60 65.40 23#整治田间道14 2.80 3.78 0.29 0.20 21.80 24#整治田间道28 5.60 7.56 0.59 0.40 43.60 25#整治田间道00 0.00 0.00 0.00 0.00 0.00 26#整治田间道28 5.60 7.56 0.59 0.40 43.60 27#整治田间道312 8.40 11.34 0.88 0.60 65.40 小计239264.40 86.94 6.76 4.59 501.40 天王村28#整治田间道28 5.60 7

32、.56 0.59 0.40 43.60 29#整治田间道14 2.80 3.78 0.29 0.20 21.80 30#整治田间道14 2.80 3.78 0.29 0.20 21.80 31#整治田间道312 8.40 11.34 0.88 0.60 65.40 32#整治田间道14 2.80 3.78 0.29 0.20 21.80 33#整治田间道416 11.20 15.12 1.18 0.80 87.20 34#整治田间道416 11.20 15.12 1.18 0.80 87.20 35#整治田间道28 5.60 7.56 0.59 0.40 43.60 36#整治田间道312 8

33、.40 11.34 0.88 0.60 65.40 37#整治田间道00 0.00 0.00 0.00 0.00 0.00 38#整治田间道416 11.20 15.12 1.18 0.80 87.20 39#整治田间道28 5.60 7.56 0.59 0.40 43.60 40#整治田间道15 3.50 4.73 0.37 0.25 27.25 41#整治田间道520 14.00 18.90 1.47 1.00 109.00 42#整治田间道28 5.60 7.56 0.59 0.40 43.60 小计3514198.7133.24510.36357.039566768.45华光村43#整

34、治田间道416 11.20 15.12 1.18 0.80 87.20 44#整治田间道312 8.40 11.34 0.88 0.60 65.40 45#整治田间道312 8.40 11.34 0.88 0.60 65.40 46#整治田间道416 11.20 15.12 1.18 0.80 87.20 47#整治田间道416 11.20 15.12 1.18 0.80 87.20 48#整治田间道28 5.60 7.56 0.59 0.40 43.60 49#整治田间道936 25.20 34.02 2.65 1.80 196.20 50#整治田间道312 8.40 11.34 0.88

35、0.60 65.40 小计32128 89.60 120.96 9.41 6.39 697.60 合计90361252.70 341.15 26.53 18.02 1967.45 田间道涵管(1000mm)工程量统计表村名田间道编号1000mm涵管(处)涵管长度(m)开挖土方(m3)回填夯实土方(m3)C15垫层15cm(m2)C30砼(m3)钢筋制安(kg)余坝村27#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 小计1 4 5.20 7.64 2.40 1.94 73.17 天王村30#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 32#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 33#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 35#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 36#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 41#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 42#整治田间道1 4 5.20 7.64 2.40 1.94 73.17 小计7 28 36 53 17 14 512 华光村43#整治田间道1 4 5.20 7.64 2.40

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论