《CMMI培训资料七》PPT课件.ppt_第1页
《CMMI培训资料七》PPT课件.ppt_第2页
《CMMI培训资料七》PPT课件.ppt_第3页
《CMMI培训资料七》PPT课件.ppt_第4页
《CMMI培训资料七》PPT课件.ppt_第5页
已阅读5页,还剩11页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

CMMI介绍 (七),CMMI Coordinator Team,October 08, 2004,CM Training,培训内容,CM process Part of SPDB guideline,CM process,Entry Criteria,Receive a project initiated signal, such as PI Note.,CM process,Inputs,Outputs of Client Engagement Anything identified in CM plan,CM process CM planning sub-process,Activities,1 In Kick off meeting of the project, PM assigns a CMer; 2 CMer gets the SDLC information from DM and identifies the configuration items for the project with DM. CMer Prepares CM plan as per CM plan template; 3 Identify configuration management tool;,To be Continued,CM process CM planning sub-process,Activities,4 CMer identifies CIs with DM, define location of baselined CIs in the CM plan, define the directory structure for the project; 5 CMer and DM define naming conversion, version control, change control mechanism, in the CM plan; 6 CMer defines CIs status account methods and schedule of CM audit in CM plan;,To be Continued,CM process CM planning sub-process,Activities,7 CMer communicates with PM to specify CM milestones and activities; 8 CMer communicates with SQA to confirm when and what should be reviewed and audited in CM plan; 9 CMer submits CM plan to PM for review and approval. Once it is approved, CMer should baseline it and performs CM activities based on this plan.,CM process Change control sub-process,Activities,1 When Change Request is received, PM handle with the change analysis, plan, design and implementation; 2 CMer puts the Change Request in CM library and gives it a serial number. PM records it in CR List worksheet of Project Tracking Sheet;,To be Continued,CM process Change control sub-process,Activities,3 According to Change Request, PM,DM and development team analyze the impacts of change, CMer should join; 4 Change acceptance criteria (e.g.):,To be Continued,Effort =5% implement by CCB,CM process Change control sub-process,Activities,5 Based on Impact analysis, CMer analyze the impacts on CIs which affected by the change, and makes properly activities; 6 When the change is closed, CMer will check in all related CIs into CM library with updated version number;,To be Continued,CM process Change control sub-process,Activities,7 The latest Project Tracking Sheet should hold all the Change Request list since the project initiation;,CM process CM Audit,Activities,1 CMer performs CIs status account and audit according to the Configuration Management Plan or an audit request; 2 The audit should focus on: Integrity of the baselines Configuration records correctly reflect the status of CIs Structure and integrity of the CM library Completeness and correctness of CIs,To be Continued,CM process CM Audit,Activities,3 CMer develops and distributes the CM Audit Report to the relative teams or person and SQA; 4 SQA should checking the contents of the CM library based on the CM Audit Report to verify the validation of this report.,To be Continued,CM process CM Audit,Activities,5 CMer should correct all problems that discovered during the audit. Meanwhile, he should track and correct th

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论