启闭机液压系统(一站控二门)设计【新版本】(包含CAD图纸、说明书)
收藏
资源目录
压缩包内文档预览:
编号:17276498
类型:共享资源
大小:7.03MB
格式:ZIP
上传时间:2019-04-02
上传人:机****料
认证信息
个人认证
高**(实名认证)
河南
IP属地:河南
50
积分
- 关 键 词:
-
CAD图纸】【
cad图图纸
启闭机CAD
cad系统设计图纸
cad系统设计图纸
门cad图图纸
- 资源描述:
-
























- 内容简介:
-
附录:英文资料(中英对照)Hydraulic system installment, debugging, maintenance & revelationInstallment: Whether is the hydraulic system installment a hydraulic system normal operation important link. First, installs the person. Hydraulic actuation system although has massively with the mechanical drive system similarity, but the hydraulic actuation system truly has its characteristic. After specialized training, and has the personnel which certainly installs the experience to be able to be engaged in the hydraulic system to install.Second, whether the examination hydraulic pressure is green Mainly is examines this item to design achieved the anticipated work goal, whether does realize the machine movement and achieves each performance index. Installs possibility which whether there is the craft realizes. Comprehensive understanding design overall each part of compositions, thoroughly understood each part plays role. The examination main content contains following several points:1st, Examination hydraulic system design. 2nd, Appraisal hydraulic system schematic diagram rationality. 3rd, Appraisal system manufacture technological level. 4th, Inspection and confirmation hydraulic system purification degree.5th, Hydraulic system spare part confirmation.Third, before the installment technology preparatory work hydraulic system before the installment, should defer to the related technical data to complete each preparatory work.1st, Technical data preparation and familiar hydraulic system schematic diagram, electrical schematic diagram, piping diagram, hydraulic pressure part, auxiliary, fitting detailed list and related part sample and so on, these materials all should prepare completely, in order to the engineers and technicians are item by item familiar to the concrete content and the specification and the research. 2nd, Commodity preparation according to hydraulic scheme and hydraulic pressure detailed list, checkup hydraulic pressure quantity, confirmation all hydraulic pressure part quality condition. Especially must strictly inspect the pressure gauge the quality, verifies the pressure gauge to furnish for examination the date, must recarry on the verification to the proving time excessively long pressure gauge, guarantees accurately is reliable.3rd, The quality testing hydraulic pressure part Center is easily polluted in the transportation or the stock process and the rust eclipses, the stock time excessively is long can cause in the hydraulic pressure part the seal aging to lose the leak-proof quality, some hydraulic pressure part because the processing and the assembly quality not good cause the performance not to be unreliable, therefore must carry on the strict quality testing to the part. Hydraulic pressure part quality testing:1st, Each kind of hydraulic pressure part model must be consistent with the part detailed list. 2nd, Must verify the hydraulic pressure part storage life excessively is whether long, or the storage environment does not gather the request, should pay attention to the hydraulic pressure part interior seal aging degree, when the necessity must carry on takes apart and washes, the replacement, and carries on the performance test. 3rd, On each hydraulic pressure part adjusting screw, adjusts the handwheel, the locking nut and so on all wants the integrity not to damage. 4th, The hydraulic pressure part supplements the seal surface quality should conform to the requirement, otherwise should give the replacement. 5th, The board style connection part connection plane does not permit to have the flaw. The installment seal trench size processing precision must conform to the related standard. 6th, The tubular connection part connection thread mouth does not permit to have damages with active button the phenomenon. 7th, The board style valve installs the ledger wall the connection plane not to permit to have the uneven flaw, the connection thread does not permit to have damages with active button the phenomenon. 8th, Will pass the oil mouth to stop up takes down, inspects the part interior will be whether clean. 9th, Inspects in the solenoid valve the electromagnetism ferrite core and the apparent mass, if has exceptionally does not permit the use. 10th, on various hydraulic pressure part appendix must be complete. The hydraulic pressure auxiliary quality testing 1st, The fuel tank must achieve the stipulation the quality requirement. In the fuel tank the appendix must be complete. The box interior does not permit to have the rust to eclipse, installs in front of the oil the fuel tank interior certainly to have to clean cleanly. 2nd, Leads with the oil filter model specification must be consistent with the design request, confirmed the filter element precision class, the filter element must not have the flaw, the connection bolt mouth does not permit to have damages, brings the appendix to have to be complete. 3rd, Each kind of seal outward appearance quality must conform to the requirement, and verifies leads the seal storage deadline. Has exceptionally or the storage deadline excessively long seal does not permit the use.4th, The accumulator quality must conform to the requirement, brings the appendix to have to be complete. Verifies the storage deadline, to deposits the long accumulator to have strictly to control quality, does not conform to the technical specification and the operation requirements accumulator does not permit the use. 5th, The air filter uses in to filter in the air the dust, ventilates the resistance not to be able too to be big, guaranteed the box internal pressure is an atmospheric pressure. Therefore the air filter must have enough in a big way passes the air the ability. The pipe and attachment quality testing The pipe material, passes the diameter, wall thickness and the attachment model specification and the processing quality all must conform to the design requirement.Uses the pipe not to permit to have the flaw. Has following exceptionally, does not permit the use: 1st, In the pipe, the outer wall surface corroded or has remarkably changes color. 2nd,The tube wound fissure depth is above pipe wall thickness 10%.3rd, In the pipe wall has the eyelet. 4th, the tube indents the degree to achieve the pipe diameter above 10%.When uses the curving pipe, has following exceptionally does not permit the use: 1st, In the pipe curving spot, the outer wall surface curve not rule or has the zigzag. 2nd, The pipe curving spot its elipse is bigger than above 10%.3rd, The flat curving spot minimum outer diameter is below original pipe outer diameter 70%. Uses the attachment not to permit to have the flaw. If has following exceptionally, does not permit the use: 1st, The attachment body or the nut thread has the scar, the burr or breaks buckles and so on the phenomenon. 2nd,The attachment body various junction planes processing precision has not achieved the specification. 3rd,The attachment body and the nut coordination is not good, has becomes less crowded or the card astringent phenomenon. 4th, Installs the seal packing collar the trench size and the processing precision has not achieved the stipulation the specification. The hose and the attachment has the following flaw not to permit the use: 1st, The hose surface has the wound skin or the aged phenomenon. 2nd, The attachment body has the rust to eclipse the phenomenon.3rd, The thread has the scar, the burr, breaks buckles has with the coordination becomes less crowded, the card astringent phenomenon. The flange has the following flaw not to permit the use: 1st, The flange packing surface has the blowhole, the crack, the burr, the radial direction trench. 2nd, the flange seal trench size, the processing precision do not conform to the design requirement. 3rd, On the flange seal metal filling piece does not permit to have each kind of flaw. Material degree of hardness should be lower than the flange degree of hardness.Fourth, The hydraulic pressure pipeline installs the request Hydraulic pressure pipelining is a main project which the hydraulic equipment installs. Whether the pipelining quality quality relates one of hydraulic system operating performance normal keys.1st, The cloth tube design and matches when the tube all should first act according to the hydraulic pressure schematic diagram, to the module, the hydraulic pressure part, the pipe connection, the flange which must connect make an all-around consideration. 2nd,The pipeline lays the arrangement and the trend should neat be consistent, each level clearly demarcated. Uses horizontal or the vertical cloth tube as far as possible, the horizontal pipeline No Parallelism should = 2/1,000; The vertical pipeline the verticality should not = 2/,400. Examines with the horizon. 3rd, Parallel or connects with tube series between, should have above 10mm the crevice. 4th, The pipeline disposition must cause the pipeline, the hydraulic valve and other part loading and unloading, the service is convenient. In the system any section of pipelines or the part should be able freely to disassemble and assemble as far as possible but does not affect other parts. 5th, Matches when the tube must enable the pipeline to have the certain rigidity and the vibration-proof dynamic energy. Should suitably dispose the pipe support and the tube clamps. The curving pipe should in get up nearby the curved spot to suppose the support or the tube clamps. The pipeline does not have clamps the direct welding with the support or the tube.6th, The pipeline weight should not by the valve, pump and other hydraulic pressure parts and auxiliary withstanding; Also should not by the pipeline supporting heavier part weight. 7th, A longer pipeline must consider the effective action prevented the temperature change causes the stress which the pipe expands and contracts causes.8th, The use pipeline material quality must have the explicit primitive basis material, does not permit the use regarding the material quality unclear pipe. 9th, The hydraulic system pipe diameter may use the grinding wheel cutter below 50mm to cut. Above the diameter 50mm pipe generally should use the machine-finishing method to cut. If uses gas cutting, then must use the machine-finishing method vehicle to go to the organization change part which because gas cutting forms, simultaneously may turn out the welding scarf. Besides the oil return pipe, the pressure does not allow by the pipeline with to roll the wheeled extrusion cutter bar to cut. The pipe cuts the surface to have to level, removes the burr, the oxide skin, the slag and so on. The margin surface and the pipe spool thread should be vertical.RevelationFirst, the foreword divulges is the present hydraulic pressure machinery universal existence breakdown phenomenon, is in particular more serious in the project mechanical hydraulic system, mainly is because the liquid flows in the hydraulic pressure part and the pipeline time has the pressure difference and various parts existence gap and so on causes divulges. Moreover, the bad operating mode condition also can have the certain influence to the project machinery seal. The hydraulic system once occurs will divulge, will be able to cause the system pressure.Second, divulges classification: The project mechanical hydraulic system divulges mainly has two kinds, the fixed seal place divulges with the movement seal place divulges, the fixed seal place divulges the spot mainly includes the cylinder bottom, various pipe connections connection place and so on, the movement seal place mainly includes cylinder spot and so on connecting rod spot, multichannel valve valve lever. Divulges outside from the fat liquor on also may divide into divulges divulges with in, outside divulges mainly is refers hydraulic pressure oil divulges in the environment from the system, in divulges is refers as a result of high and low pressure side reason and so on pressure difference existence as well as seal expiration, causes hydraulic pressure oil to flow to the low pressure side in the system interior by the high-tension side.Third, the influence divulges reason: sign factor: The seal choice :Hydraulic system feasibility, is decided in the very great degree by the hydraulic system seal design and the seal choice, because designs seals the structure to select not reasonably, the seal selects does not conform with the standard, has not considered hydraulic pressure oil and the packing material accommodating pattern, the load situation, the ep, the working speed size, the ambient temperature change in the design and so on. These are all direct in the varying degree or indirectly creates the hydraulic system to divulge. Moreover, because in the project machinery use environment has the dust and the impurity, therefore must select the appropriate dustproof seal in the design, avoids contamination and so on dust enters the system destruction seal, the pollution fat liquor, thus produces divulges. In other design reason: Designs considered the movement surface the geometry precision and roughness insufficiently are comprehensive as well as has not carried on the connection spot in the design the intensity examination and so on, these can cause in the machinery work divulges. Manufacture and the assembly factor :Make the factor: All hydraulic pressure part and the seal part all have the strict size common difference, the surface treatment, Surface fineness and the shape position male inferior request. If in manufacture process ultra difference, for example: The cylinder piston radius, the seal trough depth or the width, the attire seal packing collar hole size ultra difference or creates because of the processing question loses the circle, itself has the burr or has the depression spot, the chrome-plating falls off and so on, the seal can have the distortion, scratch, the pressure dies or presses phenomenon and so on reality does not occur causes it to lose the seal function. Enable components itself to have congenitally will infiltrate the leaking point, will have the leakage in the assembly or the use processAssembles the factor: The hydraulic pressure part should cease the barbaric operation in the assembly, if overstrain will cause the components to have the distortion, specially will use the bar copper and so on to strike the cylinder body, the seal flange and so on; Before the assembly should carries on the careful inspection to the components, when the assembly be supposed to dip little the components hydraulic pressure oil, gently presses in, when clean applies the diesel oil, specially seal packing collar, dust ring, rubber part and so on O shape circle, if causes it with the gasoline to be easy to get older loses the original elasticity, thus loses the seal function. Fat liquor pollution and the spare part damage: The gas pollution: Under the atmospheric pressure, hydraulic pressure oil center the insoluble 10% about air, in under the hydraulic system high pressure, can dissolve more air or the gas in the fat liquor. Air in fat liquor bubble formation, if the hydraulic pressure support in the work process in the extremely short time, the pressure the rapid transformation can cause the air bubble between the high and low pressure to have the high temperature in the high-tension side to occur in the low pressure side ruptures, if the hydraulic system part surface has time the concave spot and the damage, hydraulic pressure oil can high speed rush to the part surface acceleration surface attrition, causes divulges. The pellet pollution :Hydraulic ram takes some project mechanical hydraulic systems the main functional element, because in the work process the connecting rod exposes in outside is direct and the environment contacts, although puts on in the guidance is loaded with the dust ring and the seal and so on, but also unavoidably the dust, the contamination leads the hydraulic system, the acceleration seal and the connecting rod and so on scratching with the attrition, thus causes divulges, the pellet pollution damages one of quickest factors for the hydraulic pressure part.Water pollution :Because the working conditions are moist and so on the factor influence, possibly can cause the water to enter the hydraulic system, the volunteer fire brigade with hydraulic pressure oil the response, forms the acidic matter and the greasy dirt, reduces hydraulic pressure oil the lubricity, accelerates the part attrition, the water also can create the control valve the valve lever to have the caking, causes the control valve operation difficultly to scratch the seal, creates divulges.The components damage:Seal is by material and so on oil resistant rubber is made, because the long time use has the aging, the chap, the damage and so on can cause the system to divulge. If the components collide in the work process damage, can scratch seals the part, thus creates divulgesFourth, divulges the main preventing and controlling countermeasure to create the factor which the project mechanical hydraulic system divulges is the various synthesis influence result, by the existing technology and the material, must want fundamentally to eliminate the hydraulic system divulging is very difficult to achieve. Only has from above affects the hydraulic system to divulge the factor to embark, takes the reasonable measure to reduce the hydraulic system to divulge as far as possible. In the design and the processing link must fully consider the influence divulges important attribute seal trench design and processing. Moreover, the seal choice also is must often important, if does not divulge in at first the comprehensive consideration the influence factor, will be able to give the loss which later in the production will bring is unable to estimate. Chooses the correct assembly and the repair method, profits from the former experience. Like, uses the special-purpose tool as far as possible in the seal packing collar assembly, and spreads on the seal packing collar some lubrication oil. In hydraulic pressure oil the contamination control, must obtain from the pollution source, strengthens the source of pollution the control, but also must adopt effective filters the measure and the regular fat liquor quality testing. For effective shuts off the outside factor (water, dust, pellet and so on) to the hydraulic ram pollution, the coca some protective measures and so on. In brief, divulges preventing and controlling must comprehensively obtain, the synthesis considered can achieve effectively.液压系统安装、调试、保养和泄露安装:液压系统的安装是液压系统能否正常运行的一个重要环节。一、 安装人员液压传动系统虽然与机械传动系统有大量相似之处,但是液压传动系统确实有它的特性。经过专业培训,并有一定安装经验的人员才能从事液压系统的安装。二、 审查液压系统主要是审查该项设计能否达到预期的工作目标,能否实现机器的动作和达到各项性能指标。安装工艺有无实现的可能。全面了解设计总体各部分的组成,深入地了解各部分所起的作用。审查的主要内容包含以下几点: 1、 审查液压系统的设计。2、 鉴定液压系统原理图的合理性。3、 评价系统的制造工艺水平 。4、 检查并确认液压系统的净化程度。5、 液压系统零部件的确认。三、安装前的技术准备工作液压系统在安装前,应按照有关技术资料做好各项准备工作。1、 技术资料的准备与熟悉液压系统原理图、电气原理图、管道布置图、液压元件、辅件、管件清单和有关元件样本等,这些资料都应准备齐全,以便工程技术人员对具体内容和技术要求逐项熟悉和研究。 2、 物资准备按照液压系统图和液压件清单,核对液压件的数量,确认所有液压元件的质量状况。尤其要严格检查压力表的质量,查明压力表交验日期,对检验时间过长的压力表要重新进行校验,确保准确可靠。 3、 质量检查液压元件在运输或库存过程中极易被污染和锈蚀,库存时间过长会使液压元件中的密封件老化而丧失密封性,有些液压元件由于加工及装配质量不良使性能不可靠,所以必须对元件进行严格的质量检查。 A) 液压元件质量检查1、各类液压元件型号必须与元件清单一致。2、要查明液压元件保管时间是否过长,或保管环境不合要求,应注意液压元件内部密封件老化程度,必要时要进行拆洗、更换、并进行性能测试。3、每个液压元件上的调整螺钉、调节手轮、锁紧螺母等都要完整无损。4、液压元件所附带的密封件表面质量应符合要求、否则应予更换。5、板式连接元件连接平面不准有缺陷。安装密封件的沟槽尺寸加工精度要符合有关标准。6、管式连接元件的连接螺纹口不准有破损和活扣现象。7、板式阀安装底板的连接平面不准有凹凸不平缺陷,连接螺纹不准有破损和活扣现象。8、将通油口堵塞取下,检查元件内部是否清洁。9、检查电磁阀中的电磁铁芯及外表质量,若有异常不准使用。10、各液压元件上的附件必须齐全。B) 液压辅件质量检查 1、油箱要达到规定的质量要求。油箱上附件必须齐全。箱内部不准有锈蚀,装油前油箱内部一定要清洗干净。2、所领用的滤油器型号规格与设计要求必须一致,确认滤芯精度等级,滤芯不得有缺陷,连接螺口不准有破损,所带附件必须齐全。3、各种密封件外观质量要符合要求,并查明所领密封件保管期限。有异常或保管期限过长的密封件不准使用。4、蓄能器质量要符合要求,所带附件要齐全。查明保管期限,对存放过长的蓄能器要严格检查质量,不符合技术指标和使用要求的蓄能器不准使用。5、空气滤清器用于过滤空气中的粉尘,通气阻力不能太大,保证箱内压力为大气压。所以空气滤清器要有足够大的通过空气的能力。C) 管子和接头质量检查a) 管子的材料、通径、壁厚和接头的型号规格及加工质量都要符合设计要求。b) 所用管子不准有缺陷。有下列异常,不准使用: 1、管子内、外壁表面已腐蚀或有显著变色。2、管子表面伤口裂痕深度为管子壁厚的10%以上。3、管子壁内有小孔。4、管子表面凹入程度达到管子直径的10%以上。 c) 使用弯曲的管子时,有下列异常不准使用: 1、管子弯曲部位内、外壁表面曲线不规则或有锯齿形。2、管子弯曲部位其椭圆度大于10%以上。 3、扁平弯曲部位的最小外径为原管子外径的70%以下。 d) 所用接头不准有缺陷。若有下列异常,不准使用: 1、接头体或螺母的螺纹有伤痕、毛刺或断扣等现象。 2、接头体各结合面加工精度未达到技术要求。 3、接头体与螺母配合不良,有松动或卡涩现象。 4、安装密封圈的沟槽尺寸和加工精度未达到规定的技术要求。 e) 软管和接头有下列缺陷的不准使用: 1、软管表面有伤皮或老化现象。2、接头体有锈蚀现象。 3、螺纹有伤痕、毛刺、断扣和配合有松动、卡涩现象。f) 法兰件有下列缺陷不准使用: 1、法兰密封面有气孔、裂缝、毛刺、径向沟槽。2、法兰密封沟槽尺寸、加工精度不符合设计要求。3、法兰上的密封金属垫片不准有各种缺陷。材料硬度应低于法兰硬度。四、液压管道的安装要求液压管道安装是液压设备安装的一项主要工程。管道安装质量的好坏是关系到液压系统工作性能是否正常的关键之一。 1、布管设计和配管时都应先根据液压原理图,对所需连接的组件、液压元件、管接头、法兰作一个通盘的考虑。2、管道的敷设排列和走向应整齐一致,层次分明。尽
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。