


全文预览已结束
VIP免费下载
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
News ClipPort of Miami TunnelFrom:Tunnel Talk, Friday, July 02, 2010Subject:Port of Miami Tunnel gets underwayProvided by:Denise Pojomovsky, Communikatz, I/Miami-Port-Tunnel-Jul10-Groundbreaking.phpPort of Miami Tunnel gets underwayBy Shani WallisIt took time for the Port of Miami Tunnel to become a project but things have moved on since the public funding accord back in October 2009 transferred the 35-year PPP design-build-finance-operate-and-maintain concession to the Miami Access Tunnel (MAT) group. Groundbreaking by elected officialsSince then the MAT group, lead by the giant Bouygues conglomerate of France, has signed a $607 million design-build contract with Bouygues Publics Trauvaux, the heavy civil construction division of the conglomerate, for construction of the 3,900ft (1.1km) long twin tube, four lane tunnel and an order is placed with Herrenknecht for a 42ft (12.8m) EPB TBM to excavate the undersea drives. The twin tube tunnel and its associated works will create a new connection under the main shipping canal to the citys cruise and container port on Dodge Island. The new route will divert heavy port traffic away from the city streets of Miami and direct it instead through the tunnel and via a widening of the MacArthur Causeway and bridge from Watson Island to interstate highway I-395. Mobilisation of the project will continue towards arrival next spring of the Herrenknecht EPBM from the Schwanau factory in Germany. Once assembled, the machine will progress from a work site on Watson Island and pass 120ft (36.5m) below the sea surface to complete each 1.2km long, two-lane tunnel. Undersea tunnel link to Miami Port on Dodge IslandAt the recent ground breaking ceremony, Miami-Dade County Mayor Carlos Alvarez was joined by elected State, County and City officials as well as representatives of Floridas Department of Transportation, business and community leaders, and MAT managers to confirm support of the $1.3 billion project. In a last ditch effort to save the project, Florida State government agreed to pay 50% of the capital cost together with all of the operation and maintenance costs, while the remaining 50% of the capital costs will be provided by the local County and City governments. The financial agreement signed in October 2009 transferred of the project to MAT, which has a financial plan to combine partner equity with private bank and Federal Transportation Infrastructure Finance and Innovation Act (TIFIA) loans to finance the projects construction. The Federal TIFIA loan will be administered by FDOT and paid as milestone payments to MAT during the projects development. Once completed, FDOT will make annually operating and maintenance payments to MAT according to the availability of the infrastructure through the concession. Under a separate agreement, MAT has signed a contract with group partner Transfield Services to operate and maintain the toll road route. New tunnel route comes in under the Government Cut channel to the leftTransfield acquired performance-based infrastructure operating and maintenance company VMS of the United States in October 2007 and via that acquisition operates and maintains several highways and roal tunnel facilities including the road+rail Whittier Tunnel in Alaska and 17 tunnels on the National Highway System in Washington, D.C. At the groundbreaking ceremony, Mayor Alvarez said, the Port Tunnel is the most significant investment at our port since the creation of Government Cut shipping canal. The tunnel promises to transform downtown Miami as we know it. The tunnel is not only an investment in Miami-Dade County,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年演出经纪人之演出经纪实务模拟题库(能力提升)
- 生物-2025年中考考前最后一卷试题押题猜想(陕西卷)
- 八年级英语上册新教材解读课件(人教版2024)
- 急性腹痛问诊要点2025
- 河南省周口市扶沟县2023-2024学年七年级下学期7月期末考试英语试题(含答案无听力音频及原文)
- 甘肃省酒泉市敦煌中学2024-2025学年高一上学期期中考试数学(B)试卷(含答案)
- 2025年云南中考数学第一次模拟试卷(无答案)
- 2025年广东省广州市花都区中考二模道德与法治试卷(含答案)
- 2025室内墙面涂料供货合同样本范文
- Tiagabine-d6-NO050328-d-sub-6-sub-生命科学试剂-MCE
- 2023年四川省绵阳市三台县数学四下期末学业水平测试试题含解析
- 山西省灵丘县恒鑫源矿业有限公司东岐铁矿资源开发利用和矿山环境保护与土地 复垦方案
- 有机化学(中国农业大学)知到章节答案智慧树2023年
- 预焊接工艺规程pWPS新编
- 武汉市初中语文教师中高级职称考试试卷
- 等效跌落高度
- 赤峰旅游景点介绍
- 一年级新生报名登记表
- 质量管理体系获证组织现场监督检查指南(1405稿)
- 安全用药的基本知识有哪些
- GB/T 4414-2013包装钨精矿取样、制样方法
评论
0/150
提交评论