


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
News ClipPort of Miami TunnelFrom:Tunnel Talk, Friday, July 02, 2010Subject:Port of Miami Tunnel gets underwayProvided by:Denise Pojomovsky, Communikatz, I/Miami-Port-Tunnel-Jul10-Groundbreaking.phpPort of Miami Tunnel gets underwayBy Shani WallisIt took time for the Port of Miami Tunnel to become a project but things have moved on since the public funding accord back in October 2009 transferred the 35-year PPP design-build-finance-operate-and-maintain concession to the Miami Access Tunnel (MAT) group. Groundbreaking by elected officialsSince then the MAT group, lead by the giant Bouygues conglomerate of France, has signed a $607 million design-build contract with Bouygues Publics Trauvaux, the heavy civil construction division of the conglomerate, for construction of the 3,900ft (1.1km) long twin tube, four lane tunnel and an order is placed with Herrenknecht for a 42ft (12.8m) EPB TBM to excavate the undersea drives. The twin tube tunnel and its associated works will create a new connection under the main shipping canal to the citys cruise and container port on Dodge Island. The new route will divert heavy port traffic away from the city streets of Miami and direct it instead through the tunnel and via a widening of the MacArthur Causeway and bridge from Watson Island to interstate highway I-395. Mobilisation of the project will continue towards arrival next spring of the Herrenknecht EPBM from the Schwanau factory in Germany. Once assembled, the machine will progress from a work site on Watson Island and pass 120ft (36.5m) below the sea surface to complete each 1.2km long, two-lane tunnel. Undersea tunnel link to Miami Port on Dodge IslandAt the recent ground breaking ceremony, Miami-Dade County Mayor Carlos Alvarez was joined by elected State, County and City officials as well as representatives of Floridas Department of Transportation, business and community leaders, and MAT managers to confirm support of the $1.3 billion project. In a last ditch effort to save the project, Florida State government agreed to pay 50% of the capital cost together with all of the operation and maintenance costs, while the remaining 50% of the capital costs will be provided by the local County and City governments. The financial agreement signed in October 2009 transferred of the project to MAT, which has a financial plan to combine partner equity with private bank and Federal Transportation Infrastructure Finance and Innovation Act (TIFIA) loans to finance the projects construction. The Federal TIFIA loan will be administered by FDOT and paid as milestone payments to MAT during the projects development. Once completed, FDOT will make annually operating and maintenance payments to MAT according to the availability of the infrastructure through the concession. Under a separate agreement, MAT has signed a contract with group partner Transfield Services to operate and maintain the toll road route. New tunnel route comes in under the Government Cut channel to the leftTransfield acquired performance-based infrastructure operating and maintenance company VMS of the United States in October 2007 and via that acquisition operates and maintains several highways and roal tunnel facilities including the road+rail Whittier Tunnel in Alaska and 17 tunnels on the National Highway System in Washington, D.C. At the groundbreaking ceremony, Mayor Alvarez said, the Port Tunnel is the most significant investment at our port since the creation of Government Cut shipping canal. The tunnel promises to transform downtown Miami as we know it. The tunnel is not only an investment in Miami-Dade County,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025北京市规划和自然资源委员会事业单位招聘55人考前自测高频考点模拟试题及一套参考答案详解
- 2025年哈尔滨市急救中心编制外合同制工作人员招聘5人模拟试卷完整参考答案详解
- 2025江西南昌动物园百花园管理所招聘3人模拟试卷及一套完整答案详解
- 2025福建福州市罗源县卫健系统事业单位招聘编内卫技人员41人模拟试卷及一套完整答案详解
- 2025中核集团中国核建春季校园招聘笔试题库历年考点版附带答案详解
- 2025中国建筑一局(集团)有限公司财务管理部合并财务报表管理岗招聘1人笔试题库历年考点版附带答案详解
- 美团安全知识培训内容课件
- 2025年初级会计《经济法基础》知识点:合同法的基本原则
- 2025医疗设备采购协议范本
- 2025现代化生产基地食堂外包协议
- 2025保密观知识竞赛题库(试题附答案25个)
- 2025-2026学年人教版(2024)初中生物八年级上册(全册)教学设计(附目录)
- 煤矿监管培训方案
- 企业反腐倡廉培训课件
- 湿疮湿疹中医护理查房
- 2025年6月新《中华人民共和国治安管理处罚法》全文+修订宣贯解读课件(原创内容丰富且全)
- DB31/T 1377.4-2022实验鸡和鸭第4部分:设施及环境
- 2025邮储银行面试题目及答案
- 他人借车免责协议书
- 城中村改造项目规划设计(仅供参考)
- 公司代经营合同范例
评论
0/150
提交评论