已阅读5页,还剩8页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
C2005.11.12 B2005.11.5 A 2005 10 10 版次 Rev. 日期 Date 编 制 Prepared By 审 核 Reviewed By 批 准 Approved By CBI 业主/监理 Owner/Supervisor 修 改 说 明 Revision Description. CHINA NUCLEAR INDUSTRY HUAXING CONSTRUCTION CO. 福建液化天然气站线工程福建液化天然气站线工程 Fujian LNG Terminal and Trunkline Project 液化天然气低温储罐土建工程 LNG Cryogenic Tank Civil Works 编码 CODEDD-MS-HUAX-004 文件类别 Doc. Type 方案Method Statement 文件名称 Doc. Title 福建LNG施工现场临时用电方案 Method Statement of Jobsite Temporary Power of FJLNG Project 版次Rev 页码 Page ABCDEFG 版次Rev 页码 Page ABCDEFG 0 11 1 12 2 13 3 14 4 15 5 16 6 17 7 18 8 19 9 20 10 21 FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 2/12 CHANGE RECORD PAGE REVISIONDESCRIPTION OF REVISION CISSUE FOR REVIEW FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 3/12 目目 录录 ContentContent 1.工程概况工程概况 General.4 2.供配电方式供配电方式 Method of Power Supply4 3.配电箱和开关箱配电箱和开关箱 Distribution Box and Switch Box.5 4.现场防雷保护现场防雷保护 Site Lightning Protection 6 5.施工用电负荷计算施工用电负荷计算 Calculation of Power Load During Construction6 6.电缆、漏电保护器选择电缆、漏电保护器选择 Selecting of Cable, Switch 7 6.1. 主电缆截面的选择主电缆截面的选择 Selection of main cable section.7 6.2. 开关选择开关选择 Selection of Switch .8 7.临时用电平面图临时用电平面图 Temporary Power Layout9 8.现场临时用电系统图现场临时用电系统图 Site Temporary Power System Layout.9 9.现场安全技术档案:现场安全技术档案:Site Safety Documents .9 10. 安全用电及防火措施安全用电及防火措施 Safety and Fireproofing of using Power 9 10.1. 安全用电措施安全用电措施 Safety Measures 9 10.2. 电气防火措施电气防火措施 Fireproofing of electricity.11 10.3. 雨季临时用电措施雨季临时用电措施 Rainy Temporary Electricity Measures12 FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 4/12 1.工程概况工程概况 General 福建 LNG 低温储罐转运站工程位于福建省莆田市秀屿区。业主为我方现场提 供 1000KVA, 2000KVA 两台变压器,作为用电电源。主要的施工设备为五台塔吊, 三台布料机以及二台升降机等,施工的主要特点是用电负荷大,施工用电需要系数 大。 FJLNG Cryogenic Storage Tank project is located in Xiu Yu District, Putian City, Fujian. The client provides two transformers with capacity of 1000KVA and 2000KVA respectively as power supply. During two tanks construction, the main equipment includes five tower cranes, three placing booms and two elevators. The construction needs large power supply, power coefficient is great. 2.供配电方式供配电方式 Method of Power Supply 由业主现场提供的 1000KVA,2000KVA 变压器配电室低压柜已设电度表, 故在我方各个总配电柜不再设置。供电方式采用三相五线制 TN-S 系统。 为减少 因停电对生产的影响面,故采用放射式的配电方式,即:从变压器配电室低压柜引 出五个干线回路至施工现场五个总配电柜,分别供塔吊,地泵,升降机,施工照明 以及机具用电,在总配电箱及开关箱,以及距离超过 100m 的箱内做重复接地,并 与保护零线可靠联接。工作零线和保护零线要严格区分,不得混用。所有机电设备 的金属外壳必须与保护零线做可靠联接。对负荷比较大的塔吊、地泵、采用单独回 路配电,对距离较远且负荷较小的机具可采用树干式配电方式。 As ammeter is attached in the low-voltage cabinet of 1000KVA, 2000KVA transformer distribution room provided by owner, we will not install any ammeter in main distribution cabinets. Power is to be provided in TN-S System with three phases five lines. In order to minish the impact of power off upon production, radial way of distribution is adopted, that is: to give out five main line circuits to site five main distribution panels from low-voltage cabinets, which respectively supply power for tower crane, concrete pump, elevator, construction lighting, machines and tools power. The main distribution box, switch box and the distance over 100m between distribution box and switch box should be earthed repeatedly and well connected to PE line. The N line should be strictly differentiated from PE line, cannot be used confusedly. The metal shells of all mechanic equipments should be well connected to PE line. The way of distribution FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 5/12 in tower crane and pump with comparatively large load should be separate circuit. Nonetheless, the way of distribution in machines and tools with long distance and lower load could be in trunk distribution. 施工现场:根据现场实际情况变压器至现场总配电柜线路采用 VV22电缆直 埋的方式敷设,到塔吊、地泵的线路采用 YCW 电缆架空方式敷设至分配电柜,塔 吊、地泵(布料机)设置独立防水开关箱,去移动式设备电源线采用耐磨电缆。 Jobsite: According to site circumstance, transformer to site main distribution cabinet is adopted with VV22 cable buried underground to crane, pump and placing boom. Circuit is adopted with YCWcable set up to secondary distribution cabinet. One water-proof switch box shall be used for each tower crane, concrete pump (placing boom). Meanwhile portable equipment is adopted with wear-resisting cable. 现场开关箱的设置:沿罐体四周根据施工需要设立防水开关箱,供振动棒、施 工照明等设备使用;由配电箱引至二级配电箱的电缆可通过绳子固定在模板操作平 台上,二级配电箱和开关箱将随着罐体模板的提升而升高(提升过程中总电源应切 断) ,满足施工生产用电的需要。 Setting up of site switch box: Water-proof switch boxes around tank shall be installed as required for the construction equipment such as vibrator, lighting etc. Cable from main distribution box to secondary distribution box could be gone along with rope and fixed on the formwork platform. The secondary distribution box and switch box shall be moved up with the formwork lifting (the power shall be cut off during lifting) to satisfy demand for construction. 3.配电箱和开关箱配电箱和开关箱 Distribution Box and Switch Box 配电箱、开关箱采用符合标准要求的金属箱,固定式配电箱、开关箱的下 底与地面的距离大于 1.3m,小于 1.5m,移动式配电箱、开关箱的下底与地面的距 离大于 0. 6m,小于 1.5m;配电箱与开关箱的距离不得超过 30m,开关箱与其控制 的设备水平距离不得超过 5m。配电箱与开关箱必须安装在干燥,通风的场所。现 场配电箱,统一作为防水防尘型。整个临时配电系统采用两级漏电保护。 Metal box according with the specification shall be adopted for site distribution box and switch box. Distance of the bottom of fixed distribution box and switch box away from ground shall be from 1.3m to 1.5 m; distance of the bottom of moveable FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 6/12 distribution box and switch box away from ground shall be from 0.6m to 1.5 m; distance of distribution box away from switch box should be less than 30 m; horizontal distance of switch box away from controlled equipment should be less than 5m. Distribution box and switch box should be arranged in dry and ventilated place. Site distribution box shall be water-proof and dust-proof. 2 levels leakage breaker shall be used in the site temporary power supply system. 现场照明:Site Lighting 夜间施工区照明采用防水碘钨灯;罐体施工现场:在每台塔吊上装三盏 3500W 镝灯用于现场夜间照明。由于钢筋加工厂 6#塔吊高度为 20 米,故采用 1000W 高压钠灯,可以保证照度。 The waterproof iodine tungsten lamps shall be used for lighting in the construction area during night shift. Three 3500W dysprosium lamps are installed on each tower crane for site lighting during night. Owing to 20m high of 6# crane tower at rebar process workshop, we use 1000W high-voltage natrium lamps to ensure the lighting. 4.现场防雷保护现场防雷保护 Site Lightning Protection 在做塔吊基础时,利用基础部分主筋相互焊接并与塔吊基础节和接地引出线焊 接连通形成可靠的良好的电气连接,采用脚手架钢管作为接地极与接地引出线焊接, 保证接地电阻小于 4 欧姆,若达不到要求,则需要增加接地极数量。 When installing crane foundation, choosing some main rebars welded each other connects with the anchor foot and earthing eduction to make good electrical connection. Scaffold tube to be used for electrode shall be welded with earthing eduction to ensure earthing resistance less than 10; otherwise the number of electrode should be increased. 5.施工用电负荷计算施工用电负荷计算 Calculation of Power Load During Construction 主要设备用电量统计表 Statistics of Power Load of Main Equipment 序号 S.N. 设备名称 Equipments Name 单机容量(功率) Unit Capacity (Power) 数量 Quantity 小计 sub-total (kW) 1 号罐 Tank 1 FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 7/12 1砼振动器 Concrete Vibrator31030 2地泵 Concrete Pump1103330 3塔吊 Tower Crane 1202240 4塔吊 Tower Crane 1601160 5升降机 Elevator 11111 6照明 Lighting50 7压力泵 Force Pump7.517.5 8其它负荷 Other Load20 2 号罐 Tank 2 1砼振动器 Concrete Vibrator31030 2地泵 Concrete Pump1103330 3塔吊 Tower Crane 1202240 4升降机 Elevator 11111 5照明 Lighting50 6压力泵 Force Pump7.517.5 7其它负荷 Other Load20 6.电缆、漏电保护器选择电缆、漏电保护器选择 Selecting of Cable, Switch 根据现场实际情况,对电气设备进行分组,利用 Excel 电子表格计算。 (见附页 1) Divide the electric equipment into groups according to jobsite actual conditions. Result calculated by Excel (refer to appendix). 6.1 主电缆截面的选择主电缆截面的选择 Selection of main cable section A. 按发热条件选择截面 selecting cable as per heating condition FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 8/12 查表格 3-13,初选 VV223*185+2*95 电缆,其允许载流量为 273A . Looking to Table 3-13, primary selection of cable is VV223*150+2*70, allowed current-carrying capacity of which is 273A. B.考虑电压损失选择截面 selecting cable as per voltage loss 查表格 3-14,VV 系列 185mm2的 R0=0.0991/km,X0=0.07/km, 把电压和 距离换算为千单位。 Looking to Table 3-14, R0=0.0991/km,X0=0.07/km of VV series 185 mm2. Convert Voltage and Distance into kilo unit. 则干线的 3#塔吊处的电压损失为:So the voltage loss of main cable of Tower Crane is: U= R0/10/Ue21nPaLa+ X0/10/Ue21n QaLa =0.0991 /(10*0.382)*200*0.3+0.07/(10*0.382)*80*0.3 =4.11+0.86 =4.97 5 通过计算主干线选择 VV223*185+2*95 电缆(余略)By calculation, select VV223*185+2*95 cable as main cable.(Rest omitted) 6.2 开关选择开关选择 Selection of Switch A. 开关的额定电压线路的额定电压;Rated voltage of switchRated voltage of circuit B.开关的额定电流线路的计算电流;Rated current of switchcalculated current of circuit C.开关脱扣器的额定电流线路的计算电流;Rated current of tripper of switchcalculated current of circuit 根据市场调研,拟采用德力西电器元件,厂家提供资料,主开关 CDM,630A 相应 参数如下:We plan to use electric elements provided by DELIXI with information according to market investigation. Main switch is CDM,630A with relevant parameters as followings: Ue=690V400V,符合条件 A;Conformity with conditional expression A; Ie=630A273A,符合条件 B;Conformity with conditional expression B; FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 9/12 Ie=630A273A;符合条件 C;Conformity with conditional expression C; 故开关符合要求。其他分配电箱主开关及漏电保护器选择(略)So switch is qualified. Selection of main switches and leakage breakers of other DISTRIBUTION BOX are omitted. 7.临时用电平面图临时用电平面图 Temporary Power Layout Refer to DD-DWG-EL-001. DD-DWG-EL-002 8.现场临时用电系统图现场临时用电系统图 Site Temporary Power System Layout Refer to DD-DWG-EL-003. DD-DWG-EL-004. DD-DWG-EL-005 . DD-DWG-EL-006 . DD-DWG-EL-007. . DD-DWG-EL-008 9.现场安全技术档案:现场安全技术档案:Site Safety Documents 现场临时用电施工组织设计;Site Temporary Power Construction and Organization Arrangement 现场临时用电接地电阻记录;Ground Electrical Resistance Record of Site Temporary Power 现场临时用电定期检查记录;Periodic Inspection Record of Site Temporary Power 现场临时用电巡视维修记录;Inspection and Repair Record of Site Temporary Power 10 安全用电及防火措施安全用电及防火措施 Safety and Fireproofing of using Power 10.1 安全用电措施安全用电措施 Safety Measures 10.1.1 技术措施 Technical Measures 施工现场供电采用 TN-S 接零保护系统,保护零线应与工作零线分开单独使 用,杜绝混用。PE 线在总配电箱处做一组重复接地,接地电阻不大于 10。PE 线 不能加设开关及熔断器,所有电气设备的金属外壳必须与 PE 线做可靠电气连接, 不能一部分接零,一部分接地。Power supply carries out connecting Zero Line protection system, protection Zero Line and working Zero Line should be used respectively. PE Line should be earthed repeatedly at main DISTRIBUTION BOX,ground electric resistance is less than 10.Switch and fuse should not be connected with PE line and all metal shells of electric equipments should also be connected with PE line dependably rather than one part be connected to zero line and another be connected to ground. 1) 施工现场的配电箱和开关箱应配置两级漏电保护,并选用电流动作型,漏电动 FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 10/12 作电流不大于 30mA,额定漏电动作时间应不大于 0.1S。潮湿及手持工具末级 漏电动作电流应不大于 15mA。DISTRIBUTION BOX and Switch box on construction site shall have 2 Level leakage breaker with maximum current less than 30mA and time for cutting current less than 0.1s. The maximum current of leakage breaker to cut circuit shall be less than 15mA in moist places and of hand control tools. 2) 配电箱实行一机一闸,并应有过载、短路、及断路保护功能。One machine matches one switch in DISTRIBUTION BOX with the function of overload breaker, short breaker and circuit breaker. 3) 配电箱内设备必须完好无损,安装牢固,导线接头包扎严密,绝缘良好,电源 线进箱处做固定。箱内分路应标注明确。箱门内侧应标有单线系统,箱门应配 锁,并由专人负责。配电箱周围不能有杂物。Equipment in DISTRIBUTION BOX are not allowed to damage, the installation should be fixed; the conducting wire connection should be tight; insulating condition is good; power supple wire in DISTRIBUTION BOX should be fixed; the branch circuit in DISTRIBUTION BOX should be marked clearly; inside DISTRIBUTION BOX there should be One Level system; the door of DISTRIBUTION BOX should be locked, and professional worker should be responsible for it. There is not any rubbish around DISTRIBUTION BOX. 4) 潮湿场所应采用安全电压 36V 或 24V 照明。碘钨灯用铁架的应做好保护接零, 所有 220V 灯具都应使用单极漏电保护开关。Where moist places are should be security voltage 36V or 24V lighting. Iodine tungsten lamp should protect in connecting Zero Line, all the lighting fixtures 220V should use One Level with leakage breaker. 5) 电动建筑机械和手持电动工具使用需符合 JCJ46-88 第八章的有关要求。Electric construction machine and manual electrical machine should meet related requirement in Chapter Eight of JCJ46-88. 6) 对分类用电人员进行安全基本知识培训,并做好安全技术交底。Conduct security basic knowledge training for electricians, and finish the security technical induction. 7) 电气设备,配电系统要定期检查,做好记录。线路检修时,实行工作票制,由 FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 11/12 专业电工检修设专人统一组织,统一指挥。Electrical equipment and distribution system should be tested periodically, with making records. When circuit is examined, professional electrician should examine and repair by unified organization. 1.1.1. 组织措施 Organization Measures 1) 建立安全检查制度。包括内容:接地电阻、电气设备绝缘、漏电保护器动作灵 敏度等,用电设备是否安全可行并做好检测记录。Establish security inspection rules, including: whether ground electric resistance, electrical equipment insulating and leakage breaker are flexible or acute, etc; whether electrical equipments are safe and make the record of inspection. 2) 建立临时用电施工组织设计的编制,审批验收制度。Establish preparation, approval and acceptance system of temporary power construction organization design. 3) 建立技术交底,履行交底人与交被交底人的签字手续,写明交底日期。 Establish technical induction; carry out the sign record between two parties. 4) 建立维修制度,做好维修工作日志,内容应详细,记载时间、内容及处结果, 并有维修人员及验收人员签字。Establish repairing rules; finish the daily record. The contents should be detailed, such as record time, contents and results, meanwhile repair and acceptance worker should sign. 5) 建立拆除制度不用的闸箱设备随时拆除。Establish the system of dismantling, ie, dismantle immediately idle brake box. 6) 建立安全用电责任制,落实到人。Establish security power responsibility system. 7) 持证上岗,禁止非电工无证上岗。Only can electricians with permit go to work. 8) 进行专业培训,提高电气工作人员的专业素质。Carry on professional training, improve technical competence. 10.2 电气防火措施电气防火措施 Fireproofing of electricity 1.1.2. 技术措施 Technical Measures 1) 合理配制各种电气设备的保护装置,对用电设备过载、短路、进行可靠的保护。 Install rationally protection devices of all kinds of electrical equipments. 2) 电气设备集中场所应配置灭火器材,电气设备周围严禁烟火。Electrical equipments in concentrated places should install fire-extinguishing equipments, firework is forbidden strictly around electrical equipments. FUJIAN LNG RECEIVING TERMINAL _ Method Statement of JobSite Temporary Power of FJLNG Project _ REVISION :C PAGE: 12/12 3) 配电箱、电气设备周围不准堆放易燃、易爆物品,不准使用火源。Explosive and combustible materials are not allowed around DISTRIBUTION BOX and electrical
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年淮南市田家庵区街道办人员招聘笔试参考题库及答案详解
- 2026年内蒙古自治区乌兰察布市街道办人员招聘考试模拟试题及答案详解
- 2025年淄博市博山区法检系统书记员招聘笔试试题及答案详解
- 2026年温州市龙湾区街道办人员招聘笔试参考题库及答案详解
- 2025年西藏自治区街道办人员招聘考试试题及答案详解
- 2025年莱芜市莱城区中小学教师招聘笔试试题及答案详解
- 2026年江西省萍乡市街道办人员招聘笔试备考题库及答案详解
- 2026年焦作市马村区法检系统书记员招聘笔试模拟试题及答案详解
- 初升高完美衔接教材 地理教学 你所在的城市最适合种植哪种绿植呢
- 2026年固原市原州区街道办人员招聘笔试备考题库及答案详解
- 2026年廉洁从业教育培训测试题及答案
- 2026年吉林省国资委监管企业2026年度第一次集中招聘(613人)考试备考题库及答案详解
- 金融赋能:我国城镇化建设中金融发展与城镇化关系的深度剖析与实证研究
- 二年级孤独的小螃蟹故事
- 代理记账100问(完整版带答案)
- TSG 08-2026 特种设备使用管理规则
- 危化品企业法人责任制度
- 快递网点管理制度牌
- jb-qb-5ei型火灾报警控制器使用说明书(船用)v2.0
- 一河一策合同范本
- 雨课堂学堂云在线《人工智能原理》单元测试考核答案
评论
0/150
提交评论