已阅读5页,还剩70页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1,Module und Variations_E,Modules and variations New graphics guidelines Design proposals Roland Berger Hamburg, November 2001,2,Module und Variations_E,Contents Page,A. Standard slides 3 B. Lists (1) Factors, no specific number 7 C. Lists (2) Factors, specific number 13 D. Matrix Factors, comparisons 24 E. Process (1) Factors, steps 35 F. Process (2) Factors, impact 49 G. Process (3) Factors, interlinked 67 Annex: Nine key changes compared to the old standards 73,3,Module und Variations_E,A. Standard slides,4,Module und Variations_E,Methodological competence,Key projects,Industry competence,Professional experience,Languages,Education,Consultant profile: first name, last name,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Position: xxxxxxxxxxxxxxxxxxxxxxxx,German xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Born: xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,Nationality: xxxxxxxxxxxxxxxxxxxxx,Updated: mm/year,5,Module und Variations_E,Organizational chart,6,Module und Variations_E,Organizational chart (including headcount),7,Module und Variations_E,B. Lists (1) Factors, no specific number,8,Module und Variations_E,Lists horizontal (variations),Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,1,2,3,4,9,Module und Variations_E,Lists vertical (variations),1,2,3,4,10,Module und Variations_E,Schedule,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,11,Module und Variations_E,Sets of guidelines,2,3,4,5,Guidelines 1,Guidelines 2,Guidelines 3,Guidelines 4,Guidelines 5,Comments 1,Comments 2,Comments 3,Comments 4,Comments 5,1,12,Module und Variations_E,13,Module und Variations_E,C. Lists (2) Factors, specific number,14,Module und Variations_E,Pyramid (3 or 4 levels),15,Module und Variations_E,Pyramid (5 levels/centered),16,Module und Variations_E,3 factors (interwoven),1,2,3,17,Module und Variations_E,Common ground,18,Module und Variations_E,4 factors (1),19,Module und Variations_E,4 factors (2),20,Module und Variations_E,4 factors (3),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,21,Module und Variations_E,1、24号,所有小的多功厅,华厅,总体费用,1。6万 2、帆厅(搭建,5000去掉) 3、最大的费用,23-25号,搭建:原,6万,3.5万 大草,2万 颁奖,1。5万 少:二万五 4、比较小,午餐,24,26,净价310(280+15%),22,Module und Variations_E,4 factors (3b dynamic),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,Four dynamic factors,23,Module und Variations_E,6 factors (variation),24,Module und Variations_E,D. Matrix Factors, comparisons,25,Module und Variations_E,Matrix/table (Horizontal/vertical comparison of data variations),1,2,3,4,26,Module und Variations_E,Special types of matrix opportunities/threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,1,2,3,4,27,Module und Variations_E,Special types of matrix pros and cons,1,2,3,28,Module und Variations_E,Special types of matrix controversy,1,2,3,4,29,Module und Variations_E,Special types of matrix conflict/tension (1),30,Module und Variations_E,Special types of matrix conflict/tension (2),31,Module und Variations_E,Special types of matrix bottom up/top down (1),BOTTOM UP,TOP DOWN,.,.,32,Module und Variations_E,Special types of matrix bottom up/top down (2),.,.,BOTTOM,UP,TOP,DOWN,1,2,33,Module und Variations_E,Special types of matrix equilibrium,34,Module und Variations_E,Special types of matrix imbalance,35,Module und Variations_E,E. Process (1) Factors, steps,36,Module und Variations_E,Processes,1,2,3,37,Module und Variations_E,Process/phases,1,2,3,4,5,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,1,2,3,4,38,Module und Variations_E,Cycles (1) (color presentation),39,Module und Variations_E,Cycles (2),40,Module und Variations_E,Spirals (orthogonal),1,2,41,Module und Variations_E,Hurdles,42,Module und Variations_E,Resistance/obstacles,1,2,5,7,3,4,6,43,Module und Variations_E,Filters,1,2,4,5,3,6,44,Module und Variations_E,Change of mindset/direction,1,2,3,4,45,Module und Variations_E,Nodes/interfaces,1,4,3,7,5,6,8,9,2,46,Module und Variations_E,Pressure,1,2,47,Module und Variations_E,Increase/decrease,1,2,3,4,5,6,7,8,48,Module und Variations_E,Various types of brackets (to be used instead of block arrows),1,2,3,4,5,6,7,8,9,10,11,49,Module und Variations_E,F. Process 2 Factors, impact,50,Module und Variations_E,Consequences (1),.,.,.,.,.,.,51,Module und Variations_E,Consequences (1a),.,.,.,.,.,.,52,Module und Variations_E,Consequences (2),53,Module und Variations_E,Consequences (3),.,.,.,.,54,Module und Variations_E,Consequences (4),.,.,.,.,1,2,55,Module und Variations_E,Impact (3 factors),QUALITY,TIME,COST,56,Module und Variations_E,Impact (4 and 6 factors),57,Module und Variations_E,Impact (4 factors),Factor 3,Factor 2,Factor 4,Factor 1,Generic description of the 4 factors,58,Module und Variations_E,Impact (5 factors),Factor 3,Factor 2,Factor 4,Factor 5,Generic description of the 5 factors,Factor 1,59,Module und Variations_E,Impact (6 factors),Factor 2,Generic description of the 6 factors,Factor 3,Factor 1,Factor 5,Factor 4,Factor 6,60,Module und Variations_E,Impact (7 factors),Factor 3,Generic description of the 7 factors,Factor 2,Factor 6,Factor 4,Factor 5,Factor 7,Factor 1,61,Module und Variations_E,Impact (8 factors),Factor 3,Generic description of the 8 factors,Factor 2,Factor 6,Factor 7,Factor 4,Factor 5,Factor 1,Factor 8,62,Module und Variations_E,6 success factors,Impact and result (1),63,Module und Variations_E,Impact and result (2),5 success factors,64,Module und Variations_E,Vision,Vision,65,Module und Variations_E,Action/reaction,66,Module und Variations_E,Value chain,Customer,Supplier,Development,Production,Sales,Distribution,Company,67,Module und Variations_E,G. Process 3 Factors, interlinked,68,Module und Variations_E,Action/reaction (1),69,Module und Variations_E,Action/reaction (2) (transparent color presentation),70,Module und Variations_E,Interaction,1,2,3,71,Module und Variations_E,Jigsaw puzzle,72,Module und Variations_E,Spiral,73,Module und Variations_E,Annex: Nine key changes compared to the old standards,74,Module und Variations_E,Do not use block arrows,Use variations instead,1,2,3,4,1,2,3,4,BACKUP,New Content design Key changes regarding lean, linear, literal“,Do not use shading or borders,Instead, use unframed colored shapes in shades of key blue, for emphasis only,Do not use ovals,Instead, use AutoShapes with corners completely rounded off,Do not use stickers with lines,Instead, use upper case stickers (13 point), (key blue shade 1), positioned in the header area,Do not put numbers in circles,Instead,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 导猎员创新思维模拟考核试卷含答案
- 烟机电工岗前技术改进考核试卷含答案
- 二甲醚装置操作工岗前面试考核试卷含答案
- 浓硝酸工安全实践考核试卷含答案
- 《傅雷家书》阅读答案参考
- “全动力”课堂教学集体备课教案
- 湖南省长沙市2025-2026学年高二语文上学期11月期中测试试题含解析
- 2026年农业科技研发人员的招聘面试题集
- 2026年题型全解析与应试技巧指南书
- 2026年智慧物流中的AI技术面试分析
- 淇河流域水文地球化学环境对缠丝鸭蛋形成的影响探究
- 2026山东济南市中城市发展集团有限公司社会招聘备考题库附答案详解
- 乐山国有资产投资运营(集团)有限公司乐山产业投资(集团)有限公司2026年社会公开招聘考试备考试题及答案解析
- 市政道路工程旁站监理实施细则
- 2026年蜀道投资集团有限责任公司校园招聘笔试备考试题及答案解析
- 交通安全设施施工安全技术交底记录
- 海南省海口市2024-2025学年八年级下学期期中考试道德与法治试卷(含答案)
- 2025年电梯安全管理员考试题库及答案
- 《军事理论》课件-中国古代军事思想
- 《下肢深静脉血栓介入治疗围术期护理指南(2025)》解读课件
- 膀胱癌靶区勾画的精准放疗多学科策略
评论
0/150
提交评论