已阅读5页,还剩70页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1,Module und Variations_E,Modules and variations New graphics guidelines Design proposals Roland Berger Hamburg, November 2001,2,Module und Variations_E,Contents Page,A. Standard slides 3 B. Lists (1) Factors, no specific number 7 C. Lists (2) Factors, specific number 13 D. Matrix Factors, comparisons 24 E. Process (1) Factors, steps 35 F. Process (2) Factors, impact 49 G. Process (3) Factors, interlinked 67 Annex: Nine key changes compared to the old standards 73,3,Module und Variations_E,A. Standard slides,4,Module und Variations_E,Methodological competence,Key projects,Industry competence,Professional experience,Languages,Education,Consultant profile: first name, last name,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Position: xxxxxxxxxxxxxxxxxxxxxxxx,German xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Born: xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,Nationality: xxxxxxxxxxxxxxxxxxxxx,Updated: mm/year,5,Module und Variations_E,Organizational chart,6,Module und Variations_E,Organizational chart (including headcount),7,Module und Variations_E,B. Lists (1) Factors, no specific number,8,Module und Variations_E,Lists horizontal (variations),Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,1,2,3,4,9,Module und Variations_E,Lists vertical (variations),1,2,3,4,10,Module und Variations_E,Schedule,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,11,Module und Variations_E,Sets of guidelines,2,3,4,5,Guidelines 1,Guidelines 2,Guidelines 3,Guidelines 4,Guidelines 5,Comments 1,Comments 2,Comments 3,Comments 4,Comments 5,1,12,Module und Variations_E,13,Module und Variations_E,C. Lists (2) Factors, specific number,14,Module und Variations_E,Pyramid (3 or 4 levels),15,Module und Variations_E,Pyramid (5 levels/centered),16,Module und Variations_E,3 factors (interwoven),1,2,3,17,Module und Variations_E,Common ground,18,Module und Variations_E,4 factors (1),19,Module und Variations_E,4 factors (2),20,Module und Variations_E,4 factors (3),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,21,Module und Variations_E,1、24号,所有小的多功厅,华厅,总体费用,1。6万 2、帆厅(搭建,5000去掉) 3、最大的费用,23-25号,搭建:原,6万,3.5万 大草,2万 颁奖,1。5万 少:二万五 4、比较小,午餐,24,26,净价310(280+15%),22,Module und Variations_E,4 factors (3b dynamic),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,Four dynamic factors,23,Module und Variations_E,6 factors (variation),24,Module und Variations_E,D. Matrix Factors, comparisons,25,Module und Variations_E,Matrix/table (Horizontal/vertical comparison of data variations),1,2,3,4,26,Module und Variations_E,Special types of matrix opportunities/threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,1,2,3,4,27,Module und Variations_E,Special types of matrix pros and cons,1,2,3,28,Module und Variations_E,Special types of matrix controversy,1,2,3,4,29,Module und Variations_E,Special types of matrix conflict/tension (1),30,Module und Variations_E,Special types of matrix conflict/tension (2),31,Module und Variations_E,Special types of matrix bottom up/top down (1),BOTTOM UP,TOP DOWN,.,.,32,Module und Variations_E,Special types of matrix bottom up/top down (2),.,.,BOTTOM,UP,TOP,DOWN,1,2,33,Module und Variations_E,Special types of matrix equilibrium,34,Module und Variations_E,Special types of matrix imbalance,35,Module und Variations_E,E. Process (1) Factors, steps,36,Module und Variations_E,Processes,1,2,3,37,Module und Variations_E,Process/phases,1,2,3,4,5,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,1,2,3,4,38,Module und Variations_E,Cycles (1) (color presentation),39,Module und Variations_E,Cycles (2),40,Module und Variations_E,Spirals (orthogonal),1,2,41,Module und Variations_E,Hurdles,42,Module und Variations_E,Resistance/obstacles,1,2,5,7,3,4,6,43,Module und Variations_E,Filters,1,2,4,5,3,6,44,Module und Variations_E,Change of mindset/direction,1,2,3,4,45,Module und Variations_E,Nodes/interfaces,1,4,3,7,5,6,8,9,2,46,Module und Variations_E,Pressure,1,2,47,Module und Variations_E,Increase/decrease,1,2,3,4,5,6,7,8,48,Module und Variations_E,Various types of brackets (to be used instead of block arrows),1,2,3,4,5,6,7,8,9,10,11,49,Module und Variations_E,F. Process 2 Factors, impact,50,Module und Variations_E,Consequences (1),.,.,.,.,.,.,51,Module und Variations_E,Consequences (1a),.,.,.,.,.,.,52,Module und Variations_E,Consequences (2),53,Module und Variations_E,Consequences (3),.,.,.,.,54,Module und Variations_E,Consequences (4),.,.,.,.,1,2,55,Module und Variations_E,Impact (3 factors),QUALITY,TIME,COST,56,Module und Variations_E,Impact (4 and 6 factors),57,Module und Variations_E,Impact (4 factors),Factor 3,Factor 2,Factor 4,Factor 1,Generic description of the 4 factors,58,Module und Variations_E,Impact (5 factors),Factor 3,Factor 2,Factor 4,Factor 5,Generic description of the 5 factors,Factor 1,59,Module und Variations_E,Impact (6 factors),Factor 2,Generic description of the 6 factors,Factor 3,Factor 1,Factor 5,Factor 4,Factor 6,60,Module und Variations_E,Impact (7 factors),Factor 3,Generic description of the 7 factors,Factor 2,Factor 6,Factor 4,Factor 5,Factor 7,Factor 1,61,Module und Variations_E,Impact (8 factors),Factor 3,Generic description of the 8 factors,Factor 2,Factor 6,Factor 7,Factor 4,Factor 5,Factor 1,Factor 8,62,Module und Variations_E,6 success factors,Impact and result (1),63,Module und Variations_E,Impact and result (2),5 success factors,64,Module und Variations_E,Vision,Vision,65,Module und Variations_E,Action/reaction,66,Module und Variations_E,Value chain,Customer,Supplier,Development,Production,Sales,Distribution,Company,67,Module und Variations_E,G. Process 3 Factors, interlinked,68,Module und Variations_E,Action/reaction (1),69,Module und Variations_E,Action/reaction (2) (transparent color presentation),70,Module und Variations_E,Interaction,1,2,3,71,Module und Variations_E,Jigsaw puzzle,72,Module und Variations_E,Spiral,73,Module und Variations_E,Annex: Nine key changes compared to the old standards,74,Module und Variations_E,Do not use block arrows,Use variations instead,1,2,3,4,1,2,3,4,BACKUP,New Content design Key changes regarding lean, linear, literal“,Do not use shading or borders,Instead, use unframed colored shapes in shades of key blue, for emphasis only,Do not use ovals,Instead, use AutoShapes with corners completely rounded off,Do not use stickers with lines,Instead, use upper case stickers (13 point), (key blue shade 1), positioned in the header area,Do not put numbers in circles,Instead,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 不横穿马路安全教案
- 交通安全图片教育教案
- 优美舞蹈简单教学教案
- 儿童服药五个必须教案
- 六年级家长学校教案
- 分享幼儿写字文案教案
- 初中物理液体强度教案
- 古诗《凉州词》教案
- 工坊管理面试重点
- 太阳多美好舞蹈教案
- 2025广西南宁市公安局第二次公开招聘警务辅助人员445人考试参考题库及答案解析
- 2025年学法普法考试答案(全套)
- 代购汽车买卖合同范本
- 光催化还原剂设计与调控-洞察与解读
- 2025年华能鼎力(北京)新能源有限公司介绍企业发展分析报告
- 仲利国际租赁在线测试答案
- 2025公安机关人民警察(高级)执法资格证考试模拟试题及答案
- 2025年成都市事业单位招聘考试综合类专业能力测试试卷(人力资源类)试题集
- 悬崖架子施工方案范本
- 【《采煤工作面液压支架结构设计》18000字(论文)】
- 2025年浙江省烟草专卖局(公司)招聘考试笔试试题(含答案)
评论
0/150
提交评论