摘要.doc

袁一煤矿1.2Mta新井设计【含CAD图纸+文档】

收藏

资源目录
跳过导航链接。
压缩包内文档预览:
预览图 预览图
编号:32014412    类型:共享资源    大小:81.17MB    格式:ZIP    上传时间:2019-12-16 上传人:机****料 IP属地:河南
50
积分
关 键 词:
含CAD图纸+文档 煤矿 1.2 Mta 设计 CAD 图纸 文档
资源描述:
袁一煤矿1.2Mta新井设计【含CAD图纸+文档】,含CAD图纸+文档,煤矿,1.2,Mta,设计,CAD,图纸,文档
内容简介:
摘 要一般部分为淮北矿业集团袁一煤矿1.2Mt/a新井设计。袁店一矿西部边界为袁店断层为界,东至32煤层-950 m的水平投影线和39467500经线,南从杨柳五沟断层及10煤层露头线,北到32煤层-950 m的水平投影线和区块登记边界。东西长约6.913.6 km,南北宽1.23.4 km,井田面积约35.98 km2。主采煤层为10煤,煤层倾角为515,平均约10,属于缓倾斜煤层,煤层平均厚度为3.9 m。井田工业储量为129.57 Mt,矿井可采储量90.47 Mt。矿井服务年限为53.9 a,第一水平服务年限25.2 a。矿井正常涌水量为392 m3/h,最大涌水量为584 m3/h。矿井最大相对瓦斯涌出量10.08 m3/t,属于高瓦斯矿井。井田开拓方式为立井两水平暗斜井延开拓,井田采用采、带区式布置方式,共划分为二个采区,十个带区,轨道大巷、胶带机大巷和回风大巷皆为岩石大巷,布置在10煤层底板岩层中。针对西六带区采用了带区准备方式,共划分5个回采工作面,并进行了通风、运煤、运料、排水、排矸、供电系统设计。针对10601工作面进行了采煤工艺设计。该工作面煤层平均厚度为3.9 m,平均倾角11.3。矿井年工作日为330 d,工作制度为“四六”制,工作面采用长壁综采一次采全高采煤法。采用双滚筒采煤机割煤,往返一次割两刀。截深0.8 m,每天六个循环,循环进尺4.8 m,月推进度144 m。大巷采用胶带输送机运煤,辅助运输采用电机车牵引固定矿车运料。矿井通风方式前期为中央分列式,中期为中央并列式,后期为中央分列式通风。主井采用两套带平衡锤的12 t箕斗提煤,副井采用一对1.5 t矿车双层四车窄罐笼和一个带平衡锤的1.5 t矿车双层四车宽罐笼运料和升降人员。专题部分题目是泥化巷道底板控制技术。翻译部分主要内容是复合载荷下沙层地基运转塑性模型,其英文题目为:A plasticity model for the behaviour of footings on sand under combined loading。关键词:袁一煤矿;暗斜井;大断面巷道;大采高一次采全厚采煤法;中央并列式ABSTRACTThe general part is a new design for YuanDian mine. Yuan Dian mine in west is bounded Yuan Dian fault; East to 32 coal-950m level projection lines and 39467500 at warp; South from a willow 5 ditch fault and 10 coal seam outcrop lines; North to 32 coal-1000 m level projection lines and block registration boundary. The length of the minefield is about 6.9 13.6km, north and south wide 1.2 3.4 km, field with an area of about 35.98km2. The 10# is the main coal seam. The dip angle of the coal is 515 degree and the average one is 10 degree. The average thickness of the coal is 3.9m in 10#.The proved recoverable reserves of the minefield are 129.57 million tons, and the minable reserves are 90.47 million tons. The designed productive capacity is 1.2 million tons per year, and the service life of the mine is 53.9 years. The normal flow of the mine is 392m3 per hour and the max flow of the mine is 584m3 per hour. The relative mine gas gush is 10.08m3/t, It is a high gas mine. The mine is a double level dark tilt extending depth and concentration rock roadway to develop and full strip preparation, which divided into three working areas and eight bandts, and track roadway, belt conveyor roadway and return airway are all rock roadways, arranged in the floor rock of 10# coal seam.The design applies strip preparation against the first band of West Two which divided into 5 stirps totally, and conducted coal conveyance, ventilation, gangue conveyance and electricity designing. The design conducted coal mining technology design against the 10601 face. The coal seam average thickness of this working face is 3.9m and the average dip is 11.3. The “four-six” working system is used in the mine. It produces for 330 days a year. The working face applies fully mechanized longwall full-height coal caving method, and uses double drum shearer cutting coal which cuts twice each working cycle. The depth-web is 0.8m with six working cycles per day, and the advance of a working cycle is 4.8m and the advance is 144m per month.The central laneway uses Belt Conveyor to transit coal, and trolley wagons are used for accessorial transportation in the roadway.The ventilation mode of this mine is earlier stage which using boundary juxtapose form and later stage which using center juxtapose form. The main shaft uses double 12t skips to lift coal with a balance hammer and the auxiliary shaft uses a twins narrow1.5t four-car double-deck cage and a wide 1.5t four-car double-deck cage to lift material and personnel transportation.The topic of special subject parts is the restoration technology of large section and loose-fractured Instability roadway which in high seepage pressure.Translation part is about the useage of coal mine of US, and discusses to set up a mechanical anchor system to improve the performance of bolt. Its English title is “A plasticity model
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
提示  人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
关于本文
本文标题:袁一煤矿1.2Mta新井设计【含CAD图纸+文档】
链接地址:https://www.renrendoc.com/p-32014412.html

官方联系方式

2:不支持迅雷下载,请使用浏览器下载   
3:不支持QQ浏览器下载,请用其他浏览器   
4:下载后的文档和图纸-无水印   
5:文档经过压缩,下载后原文更清晰   
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

网站客服QQ:2881952447     

copyright@ 2020-2025  renrendoc.com 人人文库版权所有   联系电话:400-852-1180

备案号:蜀ICP备2022000484号-2       经营许可证: 川B2-20220663       公网安备川公网安备: 51019002004831号

本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知人人文库网,我们立即给予删除!