兴仁县顺发煤矿开采设计【含CAD图纸+文档】
收藏
资源目录
压缩包内文档预览:
编号:37131078
类型:共享资源
大小:8.23MB
格式:ZIP
上传时间:2020-01-05
上传人:机****料
认证信息
个人认证
高**(实名认证)
河南
IP属地:河南
50
积分
- 关 键 词:
-
含CAD图纸+文档
兴仁县
煤矿
开采
设计
CAD
图纸
文档
- 资源描述:
-
压缩包内含有CAD图纸和说明书,均可直接下载获得文件,所见所得,电脑查看更方便。Q 197216396 或 11970985
- 内容简介:
-
摘要本设计为顺发煤矿0.3Mt/a新井设计。共分7章:1.井田地质概况;2.井田开拓;3.大巷运输及设备;4.采区布置及装备;5.矿井通风与安全;6.矿井提升、运输、排水、压缩空气设备选型;7.环境保护。顺发井田位于贵州省兴仁县。井田境界位:位于贵州省西南部、兴仁县城南西,隶属黔西南州兴仁县四联乡管辖,地处兴仁县四联乡三村。距兴仁县城8km,直距3km,距黔西南州州政府所在地兴义市76km,直距36km,离兴义市顶效镇60km,直距26km。南昆铁路、324国道从矿区南西部顶效镇经过,贵阳至兴义高等级公路从矿区西部直距1km处通过,313省道自矿区北部2km处通过,309省道自矿区西部矿界外约600m处通过,矿山有公路与309省道相通矿井为斜井多水平水平开拓,矿井主井采用带式输送机运煤,副井单钩串车作为辅助提升。矿井通风方式为中央并列式通风。矿井主运输为胶带运输。工作面采用走向长壁采煤法,面长120m,采煤工艺为综合机械采煤法。矿井年工作日为330d,每天净提升时间18h。矿井工作制度采用“三八”制,二班生产、一班准备。关键词斜井,井田开拓,串车,综合机械采煤,中央并列式通风Abstract The design for the SHUNFA coal mine 0.3Mt/a Nii. Is divided into 7 chapters: the 1 Geological Survey; 2 field development; 3 Lane transport and equipment; 4 mining area layout and equipment; 5 mine ventilation and safety;6 mine hoisting, transportation, water, compressed air equipment selection; 7environmental protection. SHUNFA mine is located in Guizhou County of Xingren province. The boundaryposition: is located in the southwest of Guizhou Province, southwest of Xingren County, under the jurisdiction of Qianxi Prefecture of Xingren County,township, three village of Xingren County township of tetralogy of fallot. Ju Xingren County 8km, straight from the 3km, from Guizhou southwest state government is located in Xingyi City, 76km, straight from the 36km, from the city of Xingyi Dingxiao town 60km, straight from the 26km. The Nanning Kunming railway, 324 National Road from the south western mining town after the top efficiency, Guiyang to high grade highway in Xingyi mining area at a distance of 1km from the West straight through, 313 provincial highway fromnorthern mining area 2km through, 309 provincial highway from western mining area ore out of bounds of about 600m by mining, highway and highway 309 connected The mine inclined shaft multi level development, mine main shaft by a belt conveyor, auxiliary hook series car as auxiliary hoist. Mine ventilation way tie for the central ventilation. The main transport of mine for the tape transport.Face the strike long wall method, long 120m, coal mining technology forcomprehensive mechanical coal mining method. Working for the mine 330D,time 18h net every day promotion. The system of mine use three eightsystem, class two, class preparation production. Keywords i
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。