幸福家园B2#楼土建施工设计【含CAD图纸+文档】
收藏
资源目录
压缩包内文档预览:(预览前20页/共122页)
编号:37175752
类型:共享资源
大小:3.12MB
格式:ZIP
上传时间:2020-01-05
上传人:机****料
认证信息
个人认证
高**(实名认证)
河南
IP属地:河南
50
积分
- 关 键 词:
-
含CAD图纸+文档
幸福
家园
B2
土建
施工
设计
CAD
图纸
文档
- 资源描述:
-
压缩包内含有CAD图纸和说明书,均可直接下载获得文件,所见所得,电脑查看更方便。Q 197216396 或 11970985
- 内容简介:
-
1 外文翻译1.2 Earthwork Because earthmoving methods and costs change more quickly than those in any other branch of civil engineering, this is a field where there are real opportunities for the enthusiast. In 1935 most of the methods now in use for carrying and excavating earth with rubber-tyred equipment did not exist. Most earth was moved by narrow rail track, now relatively rare, and the main methods of excavation, with face shovel, backacter, or dragline or grab, though they are still widely used are only a few of the many current methods. To keep his knowledge of earthmoving equipment up to date an engineer must therefore spend tine studying modern machines. Generally the only reliable up-to-date information on excavators, loaders and transport is obtainable from the makers.Earthworks or earthmoving means cutting into ground where its surface is too high ( cuts ), and dumping the earth in other places where the surface is too low ( fills). Toreduce earthwork costs, the volume of the fills should be equal to the volume of the cuts and wherever possible the cuts should be placednear to fills of equal volume so as to reduce transport and double handlingof the fill. This work of earthwork design falls on the engineer who lays out the road since it is the layout of the earthwork more than anything else which decides its cheapness. From the available maps ahd levels, the engineering must try to reach as many decisions as possible in the drawing office by drawing cross sections of the earthwork. On the site when further information becomes available he can make changes in jis sections and layout,but the drawing lffice work will not have been lost. It will have helped him to reach the best solution in the shortest time.The cheapest way of moving earth is to take it directly out of the cut and drop it as fill with the same machine. This is not always possible, but when it canbe done it is ideal, being both quick and cheap. Draglines, bulldozers and face shovels an do this. The largest radius is obtained with the dragline,and the largest tonnage of earth is moved by the bulldozer, though only over short distances.The disadvantages of the dragline are that it must dig below itself, it cannot dig with force into compacted material, it cannot dig on steep slopws, and its dumping and digging are not accurate.Face shovels are between bulldozers and draglines, having a larger radius of action than bulldozers but less than draglines. They are anle to dig into a vertical cliff face in a way which would be dangerous tor a bulldozer operator and impossible for a dragline. Each piece of equipment should be level of their tracks and for deep digs in compact material a backacter is most useful, but its dumping radius is considerably less than that of the same escavator fitted with a face shovel.Rubber-tyred bowl scrapers are indispensable for fairly level digging where the distance of transport is too much tor a dragline or face shovel. They can dig the material deeply ( but only below themselves ) to a fairly flat surface, carry it hundreds of meters if need be, then drop it and level it roughly during the dumping. For hard digging it is often found economical to keep a pusher tractor ( wheeled or tracked ) on the digging site, to push each scraper as it returns to dig. As soon as the scraper is full,the pusher tractor returns to the beginning of the dig to heop to help the nest scraper.Bowl scrapers are often extremely powerful machines;many makers build scrapers of 8 cubic meters struck capacity, which carry 10 m heaped. The largest self-propelled scrapers are of 19 m struck capacity ( 25 m heaped )and they are driven by a tractor engine of 430 horse-powers.Dumpers are probably the commonest rubber-tyred transport since they can also conveniently be used for carrying concrete or other building materials. Dumpers have the earth container over the front axle on large rubber-tyred wheels, and the container tips forwards on most types, though in articulated dumpers the direction of tip can be widely varied. The smallest dumpers have a capacity of about 0.5 m , and the largest standard types are of about 4.5 m . Special types include the self-loading dumper of up to 4 m and the articulated type of about 0.5 m . The distinction between dumpers and dump trucks must be remembered .dumpers tip forwards and the driver sits behind the load. Dump trucks are heavy, strengthened tipping lorries, the driver travels in front lf the load and the load is dumped behind him, so they are sometimes called rear-dump trucks. 2.2土方工程由于和土木工程中任何其他工种的施工方法与费用相比较,土方挖运的施工方法与费用的变化都要快得多,因此对于有事业心的人来说,土方工程是一个可以大有作为的领域。在1935年,目前采用的利用轮胎式机械设备进行土方挖运的方法大多数还没有出现。那是大部分土方是采用窄轨铁路运输,在这目前来说是很少采用的。当时主要的开挖方式是使用正铲、反铲、拉铲或抓斗等挖土机,尽管这些机械目前仍然在广泛应用,但是它们只不过是目前所采用的许多方法中的一小部分。因此,一个工程师为了使自己在土方挖运设备方面的知识跟得上时代的发展,他应当花费一些时间去研究现代的机械。一般说来,有关挖土机、装载机和运输机械的唯一可靠而又最新的资料可以从制造厂商处获得。土方工程或土方挖运工程指的是把地表面过高处的土壤挖去(挖方),并把它倾卸到地表面过低的其他地方(填方)。为了降低土方工程费用,填方量应该等于挖方量,而且挖方地点应该尽可能靠近土方量相等的填方地点,以减少运输量和填方的二次搬运。土方设计这项工作落到了从事道路设计的工程师的身上,因为土方工程的设计比其他任何工作更能决定工程造价是否低廉。根据现有的地图和标高,道路工程师应在设计绘图室中的工作也并不是徒劳的。它将帮助他在最短的时间内获得最好的方案。费用最低的运土方法是用同一台机械直接挖方取土并且卸土作为填方。这并不是经常可以做到的,但是如果能够做到则是很理想的,因为这样做既快捷又省钱。拉铲挖土机。推土机和正铲挖土机都能做到这点。拉铲挖土机的工作半径最大。推土机所推运的图的数量最多,只是运输距离很短。拉铲挖土机的缺点是只能挖比它本身低的土,不能施加压力挖入压实的土壤内,不能在陡坡上挖土,而且挖。卸都不准确。正铲挖土机介于推土机和拉铲挖土机的之间,其作用半径大于推土机,但小于拉铲挖土机。正铲挖土机能挖取竖直陡峭的工作面,这种方式对推土机司机来说是危险的,而对拉铲挖土机则是不可能的。每种机械设备应该进行最适合它的性能的作业。正铲挖土机不能挖比其停机平面低很多的土,而深挖坚实的土壤时,反铲挖土机最适用,但其卸料半径比起装有正铲的同一挖土机的卸料半径则要小很多。在比较平坦的场地开挖,如果用拉铲或正铲挖土机运输距离太远时,则装有轮胎式的斗式铲运机就是比不可少的。它能在比较平的地面上挖较深的土(但只能挖机械本身下面的土),需要时可以将土运至几百米远,然后卸土并在卸土的过程中把土大致铲平。在挖掘硬土时,人们发现在开挖场地经常用一辆助推拖拉机(轮式或履带式),对返回挖土的铲运机进行助推这种施工方法是经济的。一旦铲运机装满,助推拖拉机就回到开挖的地点去帮助下一台铲运机。斗式铲运机通常是功率非常大的机械,许多厂家制造的铲运机铲斗容量为8 m,满载时可达10 m。最大的自行式铲运机铲斗容量为19立方米(满载时为25 m),由430马力的牵引发动机驱动。翻斗机可能是使用最为普遍的轮胎式运输设备,因为它们还可以被用来送混凝土或者其他建筑材料。翻斗车的车斗位于大橡胶轮胎车轮前轴的上方,尽管铰接式翻斗车的卸料方向有很多种,但大多数车斗是向前翻转的。最小的翻斗车的容量大约为0.5立方米,而最大的标准型翻斗车的容量大约为4.5m。特殊型式的翻斗车包括容量为4 m的自装式翻斗车,和容量约为0.5 m的铰接式翻斗车。必须记住翻斗车与自卸卡车之间的区别。翻斗车车斗向前倾翻而司机坐在后方卸载,因此有时被称为后卸卡车。41 外文翻译1.1 Reinforced ConcretePlain concrete is formed from a hardened mixture of cement ,water ,fine aggregate, coarse aggregate (crushed stone or gravel),air, and often other admixtures. The plastic mix is placed and consolidated in the formwork, then cured to facilitate the acceleration of the chemical hydration reaction lf the cement/water mix, resulting in hardened concrete. The finished product has high compressive strength, and low resistance to tension, such that its tensile strength is approximately one tenth lf its compressive strength. Consequently, tensile and shear reinforcement in the tensile regions of sections has to be provided to compensate for the weak tension regions in the reinforced concrete element.It is this deviation in the composition of a reinforces concrete section from the homogeneity of standard wood or steel sections that requires a modified approach to the basic principles of structural design. The two components of the heterogeneous reinforced concrete section are to be so arranged and proportioned that optimal use is made of the materials involved. This is possible because concrete can easily be given any desired shape by placing and compacting the wet mixture of the constituent ingredients are properly proportioned, the finished product becomes strong, durable, and, in combination with the reinforcing bars, adaptable for use as main members of any structural system.The techniques necessary for placing concrete depend on the type of member to be cast: that is, whether it is a column, a bean, a wall, a slab, a foundation. a mass columns, or an extension of previously placed and hardened concrete. For beams, columns, and walls, the forms should be well oiled after cleaning them, and the reinforcement should be cleared of rust and other harmful materials. In foundations, the earth should be compacted and thoroughly moistened to about 6 in. in depth to avoid absorption of the moisture present in the wet concrete. Concrete should always be placed in horizontal layers which are compacted by means of high frequency power-driven vibrators of either the immersion or external type, as the case requires, unless it is placed by pumping. It must be kept in mind, however, that over vibration can be harmful since it could cause segregation of the aggregate and bleeding of the concrete.Hydration of the cement takes place in the presence of moisture at temperatures above 50F. It is necessary to maintain such a condition in order that the chemical hydration reaction can take place. If drying is too rapid, surface cracking takes place. This would result in reduction of concrete strength due to cracking as well as the failure to attain full chemical hydration.It is clear that a large number of parameters have to be dealt with in proportioning a reinforced concrete element, such as geometrical width, depth, area of reinforcement, steel strain, concrete strain, steel stress, and so on. Consequently, trial and adjustment is necessary in the choice of concrete sections, with assumptions based on conditions at site, availability of the constituent materials, particular demands of the owners, architectural and headroom requirements, the applicable codes, and environmental reinforced concrete is often a site-constructed composite, in contrast to the standard mill-fabricated beam and column sections in steel structures.A trial section has to be chosen for each critical location in a structural system. The trial section has to be analyzed to determine if its nominal resisting strength is adequate to carry the applied factored load. Since more than one trial is often necessary to arrive at the required section, the first design input step generates into a series of trial-and-adjustment analyses.The trial-and adjustment procedures for the choice of a concrete section lead to the convergence of analysis and design. Hence every design is an analysis once a trial section is chosen. The availability of handbooks, charts, and personal computers and programs supports this approach as a more efficient, compact, and speedy instructional method compared with the traditional approach of treating the analysis of reinforced concrete separately from pure design.2 中文翻译2.1钢筋混凝土素混凝土是由水泥、水、细骨料、粗骨料(碎石或;卵石)、空气,通常还有其他外加剂等经过凝固硬化而成。将可塑的混凝土拌合物注入到模板内,并将其捣实,然后进行养护,以加速水泥与水的水化反应,最后获得硬化的混凝土。其最终制成品具有较高的抗压强度和较低的抗拉强度。其抗拉强度约为抗压强度的十分之一。因此,截面的受拉区必须配置抗拉钢筋和抗剪钢筋以增加钢筋混凝土构件中较弱的受拉区的强度。由于钢筋混凝土截面在均质性上与标准的木材或钢的截面存在着差异,因此,需要对结构设计的基本原理进行修改。将钢筋混凝土这种非均质截面的两种组成部分按一定比例适当布置,可以最好的利用这两种材料。这一要求是可以达到的。因混凝土由配料搅拌成湿拌合物,经过振捣并凝固硬化,可以做成任何一种需要的形状。如果拌制混凝土的各种材料配合比恰当,则混凝土制成品的强度较高,经久耐用,配置钢筋后,可以作为任何结构体系的主要构件。浇筑混凝土所需要的技术取决于即将浇筑的构件类型,诸如:柱、梁、墙、板、基础,大体积混凝土水坝或者继续延长已浇筑完毕并且已经凝固的混凝土等。对于梁、柱、墙等构件,当模板清理干净后应该在其上涂油,钢筋表面的锈及其他有害物质也应该被清除干净。浇筑基础前,应将坑底土夯实并用水浸湿6英寸,以免土壤从新浇的混凝土中吸收水分。一般情况下,除使用混凝土泵浇筑外,混凝土都应在水平方向分层浇筑,并使用插入式或表面式高频电动振捣器捣实。必须记住,过分的振捣将导致骨料离析和混凝土泌浆等现象,因而是有害的。水泥的水化作用发生在有水分存在,而且气温在50F以上的条件下。为了保证水泥的水化作用得以进行,必须具备上述条件。如果干燥过快则会出现表面裂缝,这将有损与混凝土的强度,同时也会影响到水泥水化作用的充分进行。设计钢筋混凝土构件时显然需要处理大量的参数,诸如宽度、高度等几何尺寸,配筋的面积,钢筋的应变和混凝土的应变,钢筋的应力等等。因此,在选择混凝土截面时需要进行试算并作调整,根据施工现场条件、混凝土原材料的供应情况、业主提出的特殊要求、对建筑和净空高度的要求、所用的设计规范以及建筑物周围环境条件等最后确定截面。钢筋混凝土通常是现场浇注的合成材料,它与在工厂中制造的标准的钢结构梁、柱等不同,因此对于上面所提到的一系列因素必须予以考虑。对结构体系的各个部位均需选定试算截面并进行验算,以确定该截面的名义强度是否足以承受所作用的计算荷载。由于经常需要进行多次试算,才能求出所需的截面,因此设计时第一次采用的数值将导致一系列的试算与调整工作。选择混凝土截面时,采用试算与调整过程可以使复核与设计结合在一起。因此,当试算截面选定后,每次设计都是对截面进行复核。手册、图表和微型计算机以及专用程序的使用,使这种设计方法更为简捷有效,而传统的方法则是把钢筋混凝土的复核与单纯的设计分别进行处理。4开题报告一、选题依据1.设计目的及意义我的毕业设计题目是幸福家园B2#楼土建施工设计,该工程为钢筋混凝土框架剪力墙结构,结构层数18层。工程位于范家屯102公路南侧,亚细亚西侧。工程为居民住宅。工程总建筑面积为8800m2。设计的主要目的是:建筑工程专业毕业设计是大学教育中综合性、实践性极强的一个重要的教学环节。在设计中,一方面要有扎实的专业基础知识,并把所学的知识运用到设计、施工中去,正确使用国家的规范、条例和规程的能力;另一方面,还要求有一定的知识面、与他人协调和配合的能力。这是因为建筑的科技水平越来越高,并需要多专业交叉配合才能完成。随着科学技术的发展和社会的进步,课程设计的内容也要不断地完善和充实。设计从建筑工程现场技术和经济管理方面入手,练习识图审图技能、编制设计工程的招标工程量清单、投标报价、制定施工方案和工程技术难度大的典型专项施工方案。经过以上的一系列设计实践训练,达到提高分析和解决实际工程技术和经济问题的能力,为走上工作岗位后,胜任现场工程师的岗位工作,奠定必备的施工技术管理和经济管理方面的工作基础。2.设计拟解决的工程实际问题通过毕业设计,加强自己对所学专业知识理解和掌握、突出强调造价计算;清单编制,投标报价;施工方案;识图审图等基本技能的训练,加强自己分析问题和解决问题的能力,为自己今后从事建筑工程施工经营管理方面的工作奠定必备的基础。依据施工图纸、国家现行施工质量验收规范、类似工程的施工经验,编制设计工程的施工方案。从适用性、科学性、指导性、经济性等方面综合评价,确定合理的施工方案,用以指导工程施工,控制工程质量和工程进度。2.1 通过识图审图的训练,熟悉掌握施工图纸。核查设计中的错漏,正确整改,以确保在施工时能严格执行正确的设计意图,“按图施工”,保证施工工程的结构安全和设计使用功能的实现;2.2 编制招标工程量清单,熟悉工程特征和工程内容,掌握工程量计算规则,全面而准确地计算工程量,为正确地计算工程造价奠定“量”的基础;2.3 依据现行市场价格指数或现行定额基价,计算投标工程分部分项综合单价、措施项目、其他项目的投标费用、计算工程总价,熟悉工程造价“量”、“价”计算方法,正确地计算工程造价,使施工企业取得合理的利润;2.4 依据施工图纸、国家现行施工质量验收规范、类似工程的施工经验,编制设计工程的施工方案。通过多方案比选,制定针对本工程特点的施工方案(施工方法、施工顺序、设备配置、技术措施和安全措施、进度控制)。从适用性、科学性、指导性、经济性等方面综合评价,确定合理的施工方案,用以指导工程施工,控制工程质量和工程进度;2.5 对技术难度大、影响工程质量、危及施工安全的重要分项工程和施工工具的使用,制定专项施工方案。如:对基坑支护结构、大体积混凝土温度裂缝控制、高层施工用外脚手架、框架模板系统制定专项施工方案。通过材料选择、构造设计、荷载汇集、内力计算、强度校核等手段进行安全性验算,确保以上关键施工技术的安全性。3.设计拟应用的现场资料综述3.1场地与地质条件:3.1.1地势平坦(见总平面图);3.1.2地质资料:场地土类别三类、土质条件见结构说明书,地下水标高-1.8米.3.1.3抗震设防烈度:七度;框架结构抗震等级二级.3.1.4主导风向:西北风,基本风压:0=0.65Kn/m23.1.5 地基土壤标准冻结深度:1.7m3.2 施工条件3.2.1工期:2014.04.012015.7.30;共12个月;3.2.2工现场位置及周围环境见建筑总平面图(依据指导老师要求);3.2.3工现场地势平坦,“三通一平”已经完成;3.2.4工程处于市区,所有建筑材料、构配件和施工机械均可经市区道路直接运抵现场;3.2.5行包工包料(除电梯甲方分包,外装花岗岩由乙方分包);3.2.6工单位的劳动力、施工机械和运输工具均能满足本工程的需要;3.2.7凝土供应采用商品混凝土,现场应设置1台搅拌机满足零星需要.4.设计拟应用的文献综述4.1设计中的清单工程量计算和综合单价报价计算拟应用的文献:依据建设工程工程量清单计价规范规定的工程特征、工程内容、计算规则章节计算清单工程量;依据吉林省建筑工程消耗量定额基价表、吉林省装饰装修工程消耗量定额基价表规定的计算规则和单位基价计算工程直接费,按工程类别计取管理费和利润,求对应于清单项目的综合费用,最终计算对应于清单项目的综合单价。依据吉林省建设工程材料预算价格估算材料价格;参考建设工程量清单计价编制要解与实例,全面而准确地计算工程量和综合单价报价。4.2 设计中的施工组织设计部分拟应用的文献:选择工程施工质量验收规范合订本作为施工方案制定的质量标准依据;选择建筑施工手册、高层建筑施工手册、高层建筑施工和土木工程施工现行版教材、实际工程的施工组织设计范例作为制定施工方法、进度控制、安全管理措施的参考文献;选择龚晓南等基坑工程设计与施工、建筑施工扣件式钢管脚手架安全技术规范、建筑荷载规范等作为专项施工方案的设计依据。5.设计相关技术的国内外现状(1)本工程计算报价所采用的工程量清单为08版本,紧跟时代发展趋势;(2)本工程为高层框架剪力墙结构,在长春地区比较普遍;(3)本工程采用静压桩,在长春及东北其他地区使用广泛;(4)国内无论是墙体外保温工程,还是内保温以及夹芯保温工程都存在不同程度的质量问题,如耐久性不强、裂缝、结露霉变、鼓涨脱落等,其中裂缝问题最为突出。(5)在施工组织设计部分,对脚手架,模板进行专项设计,这种方法符合目前实际工程的要求。二、设计方案及技术路线2.1. 设计方案:施工组织设计: (1)、工程量清单:招标工程工程量清单文件:总说明,分部分项工程量清单编制,措施项目清单编制,其他项目清单。(2)、工程量清单报价书:工程量清单投标文件报价书:投标总价,工程项目总价表,分项工程费汇总表,建筑、装饰工程工程量清单报价表,单位工程费汇总表,分部分项工程量清单计价表,措施项目清单计价表,其他项目清单计价表,零星工作项目计价表,主要材料价格表,分部或分项工程量清单综合单价分析表,措施项目费用分析表。(3)、施工组织设计 工程概况内容:工程概况、地点特征、施工条件、施工特点分析及本工程的主要实物量。 施工部署及施工方案A 测量放线:测量工作的总要求,工程轴线的控制;垂直度控制。B 土方工程:工程降排水设计,支撑支护设计,土方开挖、运输及回填。C 基础工程:确定施工顺序,施工机械、机具的选择,施工方法、质量要求及相应质量控制措施。D 主体工程:确定施工顺序,施工机械、机具的选择,主要构件模板设计、脚手架选型与设计,钢筋、模板、混凝土的施工方法、质量要求及相应质量控制措施。E 砌筑工程:砖墙、砌块墙、组合墙的组砌方法及质量要求,质量控制措施。F 屋面工程:确定施工顺序,屋面各个构造层次的施工方法、质量要求、相应质量控制措施及材料运输方式等。G 装饰工程:确定施工顺序及流水施工安排,主要装饰工程施工工艺、施工方法、质量要求、相应质量控制措施。 施工技术组织措施:保证质量措施,保证安全措施,冬雨季施工措施。 编制单位工程施工进度计划A 编制单位工程施工进度计划的初始方案,B 施工进度计划的初始方案的检查和调整,C 绘制施工进度计划表。资源需要量计划 单位工程施工平面布置图 投标报价技术经济指标分析,进行方案比较。计算确定各临时设施及相关施工机械设备数量:A 起重运输机械的布置:塔式起重机、混凝土泵和泵车、施工电梯等的布置。B 搅拌站、加工棚、仓库及材料构件堆场的布置:计算搅拌站、加工棚、仓库及材料构件堆场的面积;合理确定搅拌站、加工棚、仓库及材料构件堆场的位置。C 运输道路的布置:选择路面的结构和宽度,合理布置施工道路。D 临时设施的布置:计算确定各种临时设施的面积;合理确定其位置。E 临时供水供电线路的布置:合理确定。F 绘制施工平面布置图技术路线(毕业设计技术总路线)会审图纸计算工程量清单(与会审图纸同时进行)进行钢筋抽样工程量清单汇总(包括:分部分项工程量清单,措施项目清单。其他项目清单)完成工程量清单编制计算定额与综合单价完成分部分项工程量清单综合单价分析表完成措施项目清单计价表及其他项目清单表完成投标总价编写施工方案(模板,脚手架工程进行专项施工方案)编制单位工程施工进度计划单位工程施工平面布置图完成施工组织设计三、可能存在的问题及解决措施1. 问题:如何读懂建筑、结构施工图是毕业设计中的新课题解决措施是:首先学习弄懂结构平法施工图(国标101图集),听老师对该图集的专题讲解,认真领会。用该图集反复与施工图分析对比阅读,最终学会准确地识图、用图;2. 问题:工程量清单编制、综合单价报价、措施费、其他费和工程总造价的计算工作量较大,是综合性较强的建筑经济课题,如何能最好的完成解决措施是:在设计时要合理分配设计时间,计算时采用熟悉清单、定额规则和工程量计算相同步的方法,认真听老师的专题讲座、遇疑难问题及时请教老师。发现问题,反复研究分析、及时查找原因,准确整改,上手要快。达到能独立而准确地计算清单“量”、“价”的目的;3. 问题:我们在校学生工程经验较少,编制较完整又符合工程实际的施工组织设计有一定难度,如何能最好的完成解决措施是:在设计中,应认真听老师的专题讲座,夯实专业知识基础。另外,要汲取在生产实践中获取的实际经验,研究类似工程的施工组织设计范例,抓住施工方法的技术关键,编制较科学合理的施工组织设计;4. 问题:专项施工方案设计,技术性较强,解决的是施工中的关键技术问题,涉及的专业理论领域宽,且有深度解决措施是:应在老师专题讲座的引导下,进行专题攻关,温习相关专业理论知识,训练独立分析问题和解决问题的能力和专业理论的综合运用能力,创新思维,攻克技术难关,完成专项施工方案设计。5. 问题:在会审图纸中发现有些梁,板未标注,从说明中也查不出;解决措施是:经过与同学讨论,并找老师请教,得出结论,该处属于漏标,属于图纸绘制疏忽,遂将其记入图纸会审记录。6. 问题:计算工程量清单时,不断的出现算错的问题。主要是对计算规则不熟悉,理解有偏差;解决措施是:通过认真理解清单计算规则,仔细计算即可避免错误的再次发生;7. 问题:在施工组织设计专项设计时,对模板的设计方法不清楚;解决措施是:查询施工手册,看其设计方法,或者咨询老师;8. 问题:在施工组织设计的时候,常遇到力学知识,结构知识模糊,计算遇到困难;解决措施是:查找
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。