航专关联题9-18节-----5.doc_第1页
航专关联题9-18节-----5.doc_第2页
航专关联题9-18节-----5.doc_第3页
航专关联题9-18节-----5.doc_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Passage 1Our second engineer speaks English very well. He studies English very hard. He usually reads English for about an hour every day. He often talks to foreigners in English and he finds it Very useful to improve his English. All other engineers and motormen on our ship often learn from him. The motormen are repairing the welding machine nowA fresh water pipe is broken. They are going to weld It up, But its only a kind of makeshift。 After the ship gets to her next port of call, they11 replace it with a new one。1. Who speaks English very well? A. The chief engineer. B. The second engineer. C. The third engineer. D. The fourth engineer.2. How long does he read English every day? A. Half an hour. B. An hour. C. Two hours. D. Half a day.3What kind of machine are the motormen preparing?A. Welding machine B. Drilling machineC. Grinding machine D. Cutting machine4Whats wrong with the fresh water pipe?A. it is leaking B. It is brokenC. it is filled with oil D. It is filled with sludge5When are they going to replace the pipe?A. After welding it up B. Right nowC. During the annual repair D. When the ship reaches the portPassage 2We installed a new generator in our engine room during the repair. Its home-made. Its working very well now. There used to be a foreign-made one. But it was often out of order and it was not good to ensure safety. So we decided to replace it with a new one. There is a crack in the cooling water pipe of the main engine. The engineers and the motormen are going to repair it. They are going to weld it up, An engineer is measuring the length of the crack and some motormen are preparing the welding machine. They can repair it in an hour.1. When was the new generator installed in the engine room? A. When it was out of order. B. During the repair of the ship.C. After it was repaired. D. Two hours later.2. Where was the new generator made? A. In our country B. In Britain C. In German D. In Norway3. Why did we decide to replace the foreign-made one? A. Because it was foreign-mad. B. Because it was good.C. Because it ran for 1,000 hours. D. Because it was often out of order.4. Whats wrong with the water pipe? A. There is something wrong with the water pipe.B. There is a crack in the water pipe.C. There is oil leakage on the pipe.D. The water pipe is too large.5. How much time will it take to repair the pipe? A. Maybe in an hour. B. Maybe on half an hour.C. Maybe about half an hour. D. Not mentioned.Passage 3There are many safety devices used on different occasions on board,they are mainly emergency power source, emergency steering gear, water tight doors, quick closing device for the fuel oi1 system, ventilator coatings, emergency quick closing device of skylight, means of escape, engine room fan,emergency fire pump,lifeboat and so on, Antipollution devices are considered the most important equipment,They usually include oily water separators,sewage treatment devices and an incinerator1Which of the following belongs to the safety devices?A. Ventilator coatings and engine room fan.B. Means of escape and life boatC. Oily water separator and incineratorD. Both A and B2How many anti-pollution devices are mentioned in this passage?A. Two B. Three C. Four D. Five3What devices are introduced in the passage?A. Engine room equipmentB. Deck machineryC. Emergency devices and anti-pollution devicesD. Instrument on the bridge4. What equipment is used to separate the oil from bilge water?A. water tight doors B. steering gear C. an incinerator D. oily water separator5. What equipment will be used when abandon ship? A. life boat B. steering gear C. an incinerator D. oily water separatorPassage 4We dismantled and cleaned all the cylinder heads, ground the inlet and exhaust valves, and ground and cleaned the injectors, then we increased the pump pressure up to the instructions requirement. After that, we reassembled the inlet and exhaust valves and adjusted the clearances of the valves. When everything was finished, we had the engine trial, but we were sorry to fin, that the exhaust temperature was still too high.1. What did they dismantle and clean?A. The inlet valves B. All the cylinder headsC. The injectors D. The exhaust valve.2. According to what did they increase the pump pressure?A. According to the instruction bookB. According to the chief engineers instructionC. According to the instruction of the shipyard engineerD. According to the instruction of the surveyor3. What did they do after reassembled the inlet and exhaust valves A. Ground the inlet and exhaust valves B. Ground and cleaned the injectors C. Increased the pump pressure up D. Adjusted the clearances of the valves4. When did they have the engine trial?A. Before they know the abnormal temperature.B. After they adjusted the clearance of the valves.C. When they put everything right.D. Only before they reassembled the inlet and exhaust valves.5. From this passage, what do you know about the temperature in the end?A. The exhaust temperature is still too low.B. The exhaust temperature is restored in normal condition.C. The exhaust temperature can not be taken.D. The exhaust temperature is still too high. Passage 5The ballast water we discharged is clean and doesnt contain any oil,Our bilge water systemand ballast water system are two independent systems completely separated from each other. There is no chance for them to be affected by each other. There are no direct lines for the oily water to be discharged out of this ship. The system is made in accordance with MARPOL. The bilge water separator is in the middle of the engine room bottom floor.l. What water did they discharge?A. Ballast water B. Oily water C. Sea water D. Bilge water2. What systems are the independent systems?A. The ballast water systemB. The ballast water system and bilge water systemC. The bilge water systemD. Neither ballast water nor bilge water system3. Why cant the oily water on board the ship be discharged directly into the sea?A. Because the crew members has paid special attention to the sea pollution.B. Because they discharge all their oily water to the slop tank.C. Because there is no direct lines to be out of the ship.D. Because they never have oily water.4. Where is the bilge water separator? A. On the left in the engineB. On the right in the engine roomC. At the ladder side of the engine room bottom tankD. In the middle of the engine room bottom floor5. What equipment must be used when discharge the bilge water? A. Ballast water system B. Oily water separator C. Sea water D. MARPOLPassage 6Mr.Smith is one of the good engineers in the shipping company. He was appointed fourth engineer two years ago. He works hard and is very familiar with the main engine, the auxiliary engine and other equipment in the engine room. He has a good knowledge of the classification and specification of the ship, too. Besides, he speaks English well.Next week, he will go to Hamburg Shipyard by air to take over a new container ship with some other engineers and officers. He will become the third engineer of the new ship.Our ship drydocked(坞修) 5 days ago. According to the repair list, the workers h

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论