免费预览已结束,剩余4页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Contract No.:TECHNICAL CONSULTANCY SERVICE CONTRACTProject Name: Client(Hereinafter referred to as Party A): Consultant(Hereinafter referred to as Party B): Signing Date: Signing Place: Qingdao City, Shandong Province Valid period: ATTENTION1. This contract is template for Technical Consultancy Service Contract printed under the Supervision of Ministry of Science and Technology of P. R. China.2. This contract shall be made when one Party (consultant) provides the other Party (client) feasibility studies, technology forecasting, specialized technical investigation, analysis and evaluation report for specific technical projects.3. If one Party of the contract includes not only one agent, they can sign in sequence under Party A or Party B, according to each agents function shown in the contract.4. The details which havent been mentioned in the contract can be agreed as appendixes by both Parties, the appendixes shall be parts of this contract.5. The articles not needed to be filled in the contract by the Parties shall be marked as “/”.TECHNICAL CONSULTANCY SERVICE CONTRACTClient(Party A): Location: Legal representative: Project contact: Contact way: Address: Tel: Fax: E-mail: Consultant(Party B): Location: Legal representative: Project contact: Contact way: Address: Tel: Fax: E-mail: Party A desires to obtain the technical consultancy service from Party B concerning Environmental Impact Assessment (hereinafter referred to as EIA) Report of project and pay the consultancy fee to Party B. On the basis of truly and fully expressing each others objectives, the two Parties make the following agreements according to the Contract Law of P. R. China. Both Parties shall abide by the contract scrupulously.Article 1 Content, Requirement and Mode of Technical Consultancy Service from Party B.1.1 Consultancy Service Contents: Composing the EIA Report of XXXXXXXX Project.1.2 Consultancy Service Requirements: According to the requirements of relevant Environmental Protection laws and regulations, technological rules, compose the EIA Report of Project. Get the approval of the authoritative environmental protection administration departments. 1.3 Consultancy Mode: Complete and submit the EIA Report of X XXXXXXXX Project. Pass the expert review through the technical angle. Reach the approval requirements of environmental protection administration departments.Article 2 Party B shall finish the Consultancy Service for the project according to the following schedule: After signing the contract and paying the fee, Party B shall finish the EIA Report (Report for review) in working days. According to the expert review comments, submit the modified EIA Report (Report for approval) in working days. Article 3 To guarantee Party Bs efficiently consultancy service work, Party A shall provide the following cooperation: 3.1 Provide the technical materials: (1)Feasibility Study Report for the proposed project; (2)Provide the proposed project location map, floor plan, flow chart, etc. See the attached information list. 3.2 Provide the operation conditions: (1)Nominate a person who shall be responsible for the business contact during the cooperation period; (2)Provide the site investigation conditions; (3)Pay the fee according to the contract requirements. (4) 3.3 Others: The time and way for Party A to provide the above-mentioned cooperation: Party A shall provide the information needed for the environment assessment in days. The delayed time shall be the time extended for delivering the EIA report. Article 4 Price and Payment4.1 The total consultancy fee: 4.2 The fee shall be paid (in one time or in phases) by Party A to Party B. Specific manner and time of payment are as follows: (1) (2) Bank name, address and account number of Party B: Bank name: Address: Account number: Article 5 The two Parties both have the obligation to keep the following confidential in performing the contract.Party A:1Confidentiality contents (including the technical and business information): / 2Range of people involved: / 3Confidentiality period: / 4Disclosure responsibilities: / Party B: 1Confidentiality contents (including the technical and business information):Party B shall take proper measures to keep the technical information provided by Party A confidential. Party B shall not disclose the information to any third Party without prior consent of Party A. 2Range of people involved: / 3Confidentiality period: 4Disclosure responsibilities: Article 6 The modification of the contract shall be made by both Parties under mutual consensus and determined in writing. In case the following circumstances, one Party can ask for the request to modify the contract rights and obligations, the other Party shall give the reply within days. The request can be regarded as agreed if the reply is delayed. 1 The changes of the contract content; 2 The change of the consultancy fee; 3 The change of the time for providing the information; 4 The change of the work completion time. Article 7 The two Parties agree to check and accept the technical service result delivered by Party B according to the following standards and methods:7.1 The pattern of Party B to submit the technical consultancy service result: originals of EIA report, passed by the review meeting which is arranged by environmental protection departments.7.2 The acceptance standard of technical consultancy service: The quality and technical specifications of the special report shall meet the relevant environmental approval requirements, at the same time, Party B is responsible for the conclusions of the EIA report.7.3 The acceptance method of technical consultancy service results: taking the special report passing the expert review as the acceptance criteria (not including the situation that failing passing the review because of non-compiling quality or technical factors).7.4 The time and location of acceptance: Article 8 The two Parties agree to be liable for the breach of contract respectively according to the following agreement: 1. In case that Party A can not provide Party B information or the fee in time and causing the EIA work cant be finished on time, the time shall be extended accordingly.2. In case the EIA report failed to pass the review (not caused by Party A), all the fees occurred in the second review shall be borne by Party B.Article 9 The two Parties agree that, in case the losses occur when Party A makes and carries out the decision by following Party Bs technical consultancy service result which is finished on agreed standards and methods of this contract, which shall be handled by Method (1/2/3). 1Party B is not liable.2Party B is partially liable. The specific method of bearing is: 3Party B is fully liable. Article 10 The two Parties agree, 10.1 Within the validity period of Contract, the new technical achievement achieved by Party A on the basis of the technical consultancy results submitted by Party B shall belong to (Party A /both Parties). 10.2 Within the validity period of Contract, the new technical achievement achieved by Party B on the basis of technical materials or working conditions provide by Party A shall belong to (Party B /both Parties).Article 11 The two Parties agree, within the validity period of Contract, Party A nominates as the project contact person. Party B nominates as the project contact person. The project contact person shall take the following responsibilities.11.1 Communicate and cooperate with each other, fulfill the task on time. 11.2 Party A guarantees to pay the fee of EIA on time. Party B guarantees to finish the EIA report on time. 11.3 Either Party who changes the project contact person shall inform the other Party in written in time. Any Party shall be responsible for the losses caused by not timely informing the change. Article 12 The two Parties agree, in case the following circumstances lead unnecessary or impossible of performing the contract, the contract shall be terminated. 12.1 Force majeure factors 12.2 / 12.3 / Article 13 In case any dispute arises out of the performance of the contract, the two Parties shall seek a solution through mutual negotiation and mediation. In case no consensus can be reached, the dispute shall be handled through the below Method (1/2): 1Submit to Arbitration Commission for arbitration; 2Sue to the peoples court. Article 14 The two Parties agree, the definition and interpretation of the relevant words and technical terms referring to the contract and appendixes are as follows:1 ; 2 ; 3 ;Article 15 The following technical documents which are related in performing this contract, after confirming through by both Parties, shall be parts of this contract. 15.1 ; 15.2 ; 15.3 ; Article 16 Miscellaneous16.1 The fee for EIA in this contract is specially for composing
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025云南高黎贡山国家级自然保护区保山管护局招聘公益性岗位人员1人笔试考试备考试题及答案解析
- 2025广东广州市白云区石井中心幼儿园招聘2人考试笔试参考题库附答案解析
- 2025年甘肃省武威市城镇公益性岗位工作人员招聘21人笔试考试备考试题及答案解析
- 2025广西南宁昇智人力资源服务有限公司第47期招聘1人(中国共产主义青年团南宁市青秀区委员会)笔试考试参考题库及答案解析
- 2025首都医科大学附属北京中医医院面向应届毕业生(含社会人员)招聘51人笔试考试参考试题及答案解析
- 2026天津医科大学朱宪彝纪念医院第二批招聘24人笔试考试参考试题及答案解析
- 2025年陕煤韩城矿业有限公司招聘(500人)笔试考试备考试题及答案解析
- 山东省菏泽市高二上学期期末考试生物试题
- 2025中国农业发展集团有限公司总部招聘3人笔试考试参考题库及答案解析
- 2025年新能源行业供应链风险管理风险评估报告
- 屠呦呦简介-人物介绍PPT
- 综采工作面喷洒阻化剂的安全技术措施
- 不同视角下的临终关怀学知到章节答案智慧树2023年温州医科大学
- 高速公路半填半挖及填挖交界路基施工工法
- IABP在危重冠心病患者PCI术中应用
- GB/T 29472-2012移动实验室安全管理规范
- GB/T 25088-2010道路车辆牵引车和挂车之间的电连接器24 V 7芯辅助型(24S)
- 叉车技能比武方案计划
- 人力资源部门经理竞聘演讲课件
- 汽车维修增项服务认知讲解课件
- 交管12123驾驶证学法减分题库
评论
0/150
提交评论