




已阅读5页,还剩5页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
relationship, established equivalent relationship 14, and subject: application problem (4)-scores and percentage application problem review content overview answers scores, and percentage application problem of key is: according to meaning, (1) determine standard volume (units 1) (2) find associate volume rate corresponds to relationship, Then in-line solution. Category fraction multiplication word problem score Division applications engineering problem problem XV, a subject: review of the measurement of the amount of capacity, measurement and units of measurement of common units of measurement and their significance in rate 1, currency, length, area, volume, unit size, volume, weight and rate. (Omitted) 2, commonly used time units and their relationships. (Slightly) with a measurement units Zhijian of of poly 1, and of method 2, and poly method 3, and of method and poly method of relationship measurement distance of method 1, and tool measurement 2, and estimates 16, and subject: geometry preliminary knowledge (1)-line and angle review content line, and segment, and Ray, and vertical, and parallel, and angle angle of classification (slightly) 17, and subject: geometry preliminary knowledge (2)-plane graphics review content triangle, and edges shaped, and round, and fan axisymmetric graphics perimeter and area combination graphics of area subject : Preliminary knowledge (3)-review of solid content category 1-d shapes are divided into: cylinder and cone 2, column is divided into: cuboid, square 3, cone cone of the features of cuboids and cubes relationship between characteristics of circular cone is slightly solid surface area and volume 1, size 2, table .和建筑工程地下防水层施工工艺一.施工准备1.技术准备现场管理人员掌握施工图的内容,明确施工的具体做法,熟练掌握各种规范及操作规范,并所有参加施工人员进行技术交底。2.材料器材准备:材料必须在根据施工需要提前进场,经取样检测合格。3.现场准备和施工作业环境的要求.地下防水工程施工期间,明挖法的基坑必须保持地下水位稳定在基底0.5m 以下,必要时应采取降水措施。.地下防水工程的防水层,严禁在雨天、雪天和五级风及其以上时施工,其施工环境气温不低于5。.施工区段内筏板垫层已施工完毕,且验收合格,具备做防水条件。并且提前关注天气情况,保证23天内没有雨雪。二.施工方法及施工技术要点1.细部节点防水做法细部节点(平立面交接处、穿墙管等)是防水工程的薄弱环节,必须有针对性的进行合理、安全、科学的设计并要求高质量的施工操作,才能保证地下室防水系统的整体性及密闭不透水性。.防水混凝土施工缝处理防水混凝土施工缝采用钢板止水带进行处理(见下图),采用钢板在施工缝处形成环形封闭钢板圈。.防水混凝土后浇带处理方法:.防水混凝土剪力墙对拉螺栓处理:以防止在对拉螺栓沿铁丝贯穿部位渗透水,影响防水效果。止水环与钢筋应满焊严密,两端止水环与两侧模板之间应加垫木,拆模后除去垫木,沿止水环平面将对拉钢筋割掉,凹坑以膨胀水泥砂浆封堵,如下图: 膨胀水泥砂浆封堵完成后对其表面增加一层5050防水卷材加强层。 .卷材搭接施工时,相邻两幅卷材的搭接要错开,错开长度不小于1500,搭接长度为不小于100,平面搭接以及立墙搭接如下示意图所示: .附加层的设置在平立面交接处、转折处、阴阳角、管根等部应设置卷材附加增强层,一般情况下采用与大面卷材同材质的专用附加层卷材宽度500。特殊部位附加卷材则需现场按要求进行裁剪。.底板与外墙交接处防水做法平立面交接处、转折处附加专用附加层卷材,底板卷材与砖砌永久保护墙之间刷油满粘施工,卷材收口部位采用砖体进行临时固定,待立墙施工时拆除临时保护,与底板卷材接茬宽度不小于100,详见下图所示:.外墙卷材收口做法外墙立面卷材的收口采用固定压条、射钉固定、并用沥青基密封膏密封,在保证防水系统的安全性能的前提下,对延长防水系统的安全使用寿命起到极大的帮助。柔性防水层收头如下图所示:.穿墙管防水做法 .三维阴阳角处防水做法 阳角(此处的阴阳角专指三维交叉部位)在防水层施工中,数量诸多,也是防水层薄弱的部位之一,该处的通常做法是由施工作业人员按照下图方式现场裁剪和安装:按照上图尺寸放样、裁剪、热合,并通过严格的质量检测。优点:保证防水系统质量.顶板与地下室外墙交接处施工方法在拐角处顶板卷材往外墙下翻250、外墙卷材往顶板上翻250叠层形成附加层,顶板卷材在立墙上下翻250与外墙外层卷材上翻250搭接,已加强角部的防水安全,如下图所示:.电梯井/集水坑防水做法在电梯井及集水坑的阴阳角转折处设置与大面同材质的SBC卷材作附加增强层,附加层宽度500,如下示意图所示:.卷材防水临时甩茬做法2.地下室底板防水施工工艺.施工工艺流程:基层表面清理节点附加增强处理定位弹线试铺铺贴卷材收头处理、节点密封清理、检查整修保护层施工。.操作要点及技术要求:1)铺设卷材防水层前,必须将基层的尘土杂物认真清扫干净,并要求基层平整。2)应铺贴卷材加强层,采用配套的聚合物水泥防水粘结材料;固化后的粘结料厚度不应小于1.3;3)结构底板垫层混凝土部位的卷材满粘法施工,卷材与基层粘结应采用满粘法粘结面积不应小于90%,刮涂粘结料应均匀,不应露底、堆积;侧墙采用外墙外防外贴法的卷材及顶板部位的卷材应采用满粘法施工。4)卷材与基面、卷材与卷材间的粘结应紧密、牢固;铺贴完成的卷材应平正顺直,搭结尺寸应准确,不得产生扭曲和皱折。5)卷材搭结处的接头部位应粘贴牢固,接缝口应封严或采用材性兼容的密封材料封缝。6)铺贴立面卷材防水层时,应采取防止卷材下滑的措施。7)铺贴双层卷材时,上下两层和相邻两幅卷材的接缝应错开三分之一至二分之一幅宽,且两层卷材不得相互垂直铺贴。8)聚乙烯丙纶复合防水卷材搭接宽度为100 。9)卷材防水层的基面应坚实、平整、清洁,阴阳角处应做圆弧或折角,并应符合所用卷材的施工要求。10)铺贴双层卷材时,上下两层和相邻两幅卷材的接缝应错开1312幅宽,且两层卷材不得相互垂直铺贴。11)铺贴立面卷材防水层时,应采取防止卷材下滑的措施。主体结构完成后,铺贴立面卷材时,如卷材接茬处有局部损伤,应及时进行修补。卷材接缝必须粘贴封严。铺贴卷材应先铺平面,后铺立面,交接处应交叉搭接。临时性保护墙应用石灰砂浆砌筑,内表面应用石灰砂浆做找平层,并刷石灰浆。12)分工序自检,自检合格后报请总包、监理及建设方按照国标地下防水工程质量验收规范(GB 50208-2002)验收,验收合格后及时进行保护层的施工。13)卷材防水层经验收合格后应及时做保护层。保护层应符合以下规定:侧墙卷材保护层采用80厚聚苯板;底板卷材保护层为50厚C20细石混凝土;基础底板侧面卷材保护层采用240厚砖墙。三.成品保护措施1.在防水层的施工过程中,施工人员须穿软底鞋,严禁穿带钉子或尖锐突出的鞋进入现场,以免破坏防水层。2.施工过程中质检员应随时、有序的进行质量检查,如发现有破损、扎坏的地方要及时组织人员进行正确、可靠的修补,避免隐患的产生。3.卷材防水层施工完毕自检合格后,应及时报请总包方、监理方进行验收。4.底板卷材防水层验收合格后,应及时进行保护层的施工。5.严禁在未进行保护的防水层上托运重型器物和运输设备。6.不得在已验收
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 小熊与大树的对话童话作文(13篇)
- 个人成长潜能呈现承诺书6篇范文
- 公司出口商品质量保障承诺书(7篇)
- 2025南平市延平区疾病预防控制中心招聘驾驶员模拟试卷及参考答案详解一套
- 尊贵艺术珍品保真购藏承诺函(9篇)
- 2025年烟台市公费医学生考试选聘(139人)考前自测高频考点模拟试题带答案详解
- 企业资产采购标准合同范本
- 商业计划书制作流程工具
- 2025内蒙古鄂尔多斯市康巴什区青年就业见习计划招募考前自测高频考点模拟试题及答案详解(全优)
- 辽宁省葫芦岛市2024-2025学年高一下学期期末考试地理地理试卷(解析版)
- 学堂在线 军事理论 章节测试答案
- 公司车辆使用登记表
- 胆总管结石术后护理
- 中国糖尿病防治指南课件
- 校园欺凌防范与处置操作指引
- 建筑结构试题及答案
- GB/T 4854.7-2008声学校准测听设备的基准零级第7部分:自由场与扩散场测听的基准听阈
- OTN技术与应用(阿法迪)
- 高标准基本农田建设项目电力施工组织设计
- 财富沙盘流程课件
- 旋挖钻桩基施工方案
评论
0/150
提交评论