全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Hydraulic disorders and balanced discussion on hydraulicAbstract HVAC works in the building, the regulation of water balance is an important issue. In this paper, static and dynamic balance hydraulic hydraulic balance the concept of combining two kinds of hydraulic and the characteristics of balance, Analysis of the traffic flow system and the system changed several typical way of hydraulic equipment balance the choice and implementation of water balanced manner.key words Hydraulic disorders; Steady ; Operation Condition ; The number of resistance1 Hydraulic disorders and the concept of water balanceIn hot water heating system and chilled water air-conditioning system in the thermal (cold) the users actual traffic flow and design requirements as the inconsistency between the users of water imbalance.Hydraulic disorders can be the extent of the actual traffic flow and design requirements to measure the ratio of X, X said an imbalance of water.X = QS/QJ(QS:The actual user traffic,QJ:The design requirements of the user traffic)Hydraulic balance refers to the network of users in all other users of changes in traffic flow to maintain unchanged the ability of their own, usually with hydraulicstability of the users coefficient r to that.=1/ XMAX = QJ/ QMAX (QJ:The design requirements of the user traffic,QMAX:The largest user traffic )2 Hydraulic hydraulic balance disorders and the classification2.1 Static and passive hydraulic hydraulic balance disordersAs the design, construction, equipment and other material reasons for the resistance of the pipeline system and design requirements than the number of channels of resistance ratio of inconsistency, So that the actual system user traffic flow inconsistent with the design requirements, arising from the hydraulic system disorders, called the static water imbalance.Static hydraulic imbalance is the steady, fundamental, is inherent in the system itself, is Chinas HVAC water in the hydraulic system disorders an important factor.Through the pipeline system in additional static balance hydraulic equipment (hy -draulic balance valve) of the pipeline system to regulate the ratio of resistance to the pipeline design requirements of the same ratio of resistance , At this time when the system throughput to meet the design flow, the flow of terminal equipment are also to meet the design flow, static hydraulic system to achieve balance.2.2 Dynamic imbalance of hydraulic and dynamic water balanceWhen a user opened the valve of changes in water flow changes, other users of the flow also will be changed, from design flow, resulting in an imbalance of water, called hydraulic dynamic imbalance.Hydraulic dynamic imbalance is dynamic and changing , it is not inherent in the system itself, the system is in the process of the operation.Through the new pipeline system in the dynamic balance of hydraulic equipment (flow regulator or pressure regulator) , when other users valve opening event of a cha-nge, Dynamic hydraulic equipment through the balance of shielding, so that the flow is not followed its own changes, terminal equipment does not interfere with each other traffic, when the hydraulic system to achieve dynamic balance.3 The flow of the hydraulic system of balanceThe flow of hydraulic balance HVAC system design is common in the hydraulic system, in the process of running the entire traffic system remained unchanged. Com-monly used in the following two forms:3.1 Complete system for trafficComplete set flow system is in the system without any dynamic valve, the system after the completion of commissioning in the early opening of the valve not to make any changes, The entire system to always maintain a constant flow. Full flow system will apply mainly to terminal equipment do not have to adjust to flow through the system, If the end of a three-speed fan coil switch regulating wind speed and the use of variable air volume air handling units of air-conditioning systems and lower system requirements, Just climate heating water temperature compensation for adjustment to meet the basic needs of the heating system.Complete set flow hydraulic system exists only static imbalance , and there is no hydraulic dynamic imbalance , the only static in the relevant parts installed hydraulic equipment can be balanced.Usually in the engine room catchment system installed on the hydraulic balancevalve; water for air-conditioning system that can return to the building each floor level of water pipes installed on the hydraulic balance valve. Figure (1-5).For some systems, although not contain any dynamic valve, but not through other means to regulate non-flow, Therefore, in actual operation of users because of a cold or overheated rooms and change the valve opening to change the flow, so that this system can be set between traffic and variable flow between3.2 Single-tube series (with the bypass) heating systemOne-pipe heating system including the series of vertical double-standard onepipe system and vertical series single-tube systems . This system will remain basi- ically unchanged in charge of traffic, is scheduled traffic system. The former as an example to illustrate the hydraulic system to achieve a balanced manner.Such a system exists mainly static hydraulic imbalance in the level of branches on the two-or three because of the regulatory role of Wen Kongfa . There is a certain dynamic hydraulic imbalance . So just in the relevant parts of the hydraulic balance additional related equipment to enable the system to maintain water balance . Asfoll- ows:(1) in the engine room catchment system installed on the hydraulic balance valve;(2) in the legislature to set up water pipes on the hydraulic balance valve;(3) in the horizontal branches of the installation of traffic on the regulator to ensu re that the branch loop constant flow (in this branch can loop pipeline of internal cha-nges to maintain a constant flow, May also change in other loop to avoid traffic by jamming).4 Variable flow of water balanceDue to peoples quality system requirements and the continuous improvement of energy-saving awareness , change water flow in the HVAC system works occupy an increasingly important position. Variable flow system in the process of running allbra -nches of the loop traffic load along with the external environment changes and chang -s . As HVAC works in a year of operation for most of the time in a partial load oper operating conditions, most of the time variable flow system flows are lower than the system design flow. So such a system is real-time, sensitive, highly efficient, energy- efficient.Due to peoples quality system requirements and the continuous improvement of energy-saving awareness , change water flow in the HVAC system works occupy an increasingly important position. Variable flow system in the process of running allbra -nches of the loop traffic load along with the external environment changes and chang -s . As HVAC works in a year of operation for most of the time in a partial load oper operating conditions , most of the time variable flow system flows are lower than the system design flow. So such a system is real-time, sensitive, highly efficient, energy- efficient.Variable flow system in general there is still imbalance in water, there are also hy draulic dynamic imbalance , it is necessary to adopt correspon
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年山东外事职业大学单招职业技能测试题库含答案
- 2026年无锡南洋职业技术学院单招综合素质考试必刷测试卷汇编
- 2025年延安子长县文化艺术演职人员招聘(32人)参考题库含答案详解(典型题)
- 2026年湘南幼儿师范高等专科学校单招职业适应性考试题库汇编
- 2026年重庆护理职业学院单招职业技能测试必刷测试卷含答案
- 2026年广州卫生职业技术学院单招职业倾向性测试必刷测试卷附答案
- 2026年东营科技职业学院单招职业技能考试题库汇编
- 东方资产招聘试题及答案
- 2026年湖南省永州市单招职业适应性考试题库附答案
- 2025广东“百万英才汇南粤”-广州琶洲人工智能与数字经济试验区管理委员会直属事业单位引进高层次人才1人参考题库带答案详解(完整版)
- 暖通安装施工组织设计方案
- 急性根尖周炎临床表现讲解
- 12D101-5110KV及以下电缆敷设工程
- 预防校园欺凌:我们与恶的距离
- 高速铁路客运服务职业生涯规划
- 列车电子防滑器-电子防滑器原理
- 西方交响乐-完整版课件
- 计算机网络基础与应用-网络管理与维护
- LED显示屏系统安装与调试方案
- 钣金加工过程作业指导书
- 自主移动机器人教学课件第4章 导航规划 2 避障规划和轨迹规划
评论
0/150
提交评论