




已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
讲解基础槽钢制作材料的存放根据乏风氧化站的安装项目及规范要求,我们将质量控制项目划为以下几个部分:瓦斯氧化装置安装; 低压电气系统安装;主气管线安装;配套的低浓度瓦斯添加系统安装。According to the lack of wind oxidized station installation project and specification requirements, we will quality control program is divided into the following several parts: (1) gas oxidation device installation; (2) low voltage electrical system installation; (3) the main gas pipe installation; (4) of low concentration gas adding system installation. 3 安装质量控制The installation quality control 工艺流程:氧化装置基础验收氧化装置的主体安装检查设备试运行Processes: oxidation device based acceptance - oxidation device main body - check - equipment installation commissioning 3.1 瓦斯氧化装置主体部分安装。氧化装置是氧化站核心部分,在安装施工过程中,必须严把验收、安装、试验工序。3.1 gas oxidation device main body part of the installation. Oxidation oxidation is the core part, in the installation process, must strictly the acceptance, installation, test process. 3.1.1 氧化装置基础验收工序。氧化装置验收与清点检查,一定要查明设备的型号,核实设备的型号、名称、规格是否与设计图纸相符;检查设备的表面是否破损、外伤,平面是否变形;检查设备,清点零件、部件、附件是否齐全,检查厂家图纸、说明书及合格证是否齐全。3.1.1 oxidation device based acceptance process. Oxidation device acceptance and inventory check, must find out the equipment models, to verify the model, name, specification of equipment is consistent with design drawings; Check equipment surface is damaged, trauma, and whether the plane deformation; Check equipment, whether inventory parts, components, accessories complete, check whether factory drawings, manual and certificate of approval is complete. 3.1.2 安装工序。氧化装置安装前应详细了解安装说明书3.1.2 the installation process. Oxidation device before the installation should be details about installation instructions 起吊时,根据氧化装置及配套设备标示重量选用相应级别吊车(大于25T)及吊具,吊车工要持证上岗,并具有一定的工作经验。钢丝绳应挂在吊耳处,不得与重要部件(切换阀、安全阀、进气系统)直接接触; lifting, selected according to oxidation device and equipment labeled weight cranes (greater than 25 t) level and spreader, crane operators must hold relevant certificates, and have certain work experience. Wire rope should be hanging in hanging ears, not with important components (switch valve, safety valve, air intake system) direct contact; 就位安装时利用道木、钢丝绳、导链、千斤顶、滚杠等使部件平稳移动到指定位置;并将其找正、调平; when installed in place, sleeper, wire rope, chain transmission, jack, rollarounds smooth and moved to the specified location to make the parts; And its alignment, leveling; 检查氧化装置,保证其开机前各系统状态良好。 permission levels check oxidation device, ensure the all systems before starting the in good condition. 通过抓好以上三个工序,我们在实际安装施工中,羟丙基甲基纤维素发现问题与及时厂家协商重新进行处理。On through pay special attention to the above three working procedure, we in the actual installation, the manufacturer find problems and timely negotiation again for processing. 3.2 低压电气系统安装3.2 low voltage electrical system installation 工艺流程:基础型钢制作安装配电柜搬运吊装电缆连接配电柜连接固定Process: foundation, power distribution ark handling hoisting steel fabrication and installation to cable connection, power distribution ark fixed connection 3.2.1 施工准备3.2.1 construction preparation 施工中需要的主要海吉布施工工具、试验设备等准备齐全。 needed during construction mainly construction tools, test equipment and other preparation is complete. 对参加施工人员组织施工前图纸技术、安全交底。 to join construction personnel before construction drawings technical clarificaiton, safety. 设备检查验收。设备到工地后,检查其包装及密封情况是否良好,开箱进行外观检查,油漆是否完整均匀,水性油墨盘面编号醒目,字迹平整清洁;清点数量与清单是否相符,核实设备的规格、型号、名称与设计要求是否相符;检查设备的表面是否破损、外伤,平面是否变形;配电柜内的瓷件、仪表、器件、端子板是否完好;检查设备,清点零件、部件、附件是否齐全,装箱单、备件、厂家图纸、酱油说明书及合格证是否齐全;各种辅材规格型号与设计要求是否一致,合格证是否有效,并进行现场抽查,不合格者禁用。 acceptance inspection equipment. Equipment to the site, check whether the packing and sealing good, out of the box for appearance inspection, the paint is complete uniform and disk serial number marked, writing smooth clean; Counting number consistent with whether listing, to verify the specifications of the equipment, model number and name and whether the design requirements; Check equipment surface is damaged, trauma, and whether the plane deformation; In power distribution cabinet of porcelain, instruments and devices, terminal board are in good condition; Check equipment, whether inventory parts, components, accessories complete, packing list, spare parts, manufacturer drawings, manual and certificate whether is complete; All kinds of auxiliary material specifications and design requirements are consistent, certificate is valid, and spot checking, not eligible disabled. 3.2.2 基础槽钢制作及安装基础槽钢安装3.2.2 foundation channel steel production and installation of foundation channel steel is installed 根据施工图纸进行基础槽钢的制作、安装。在安装基础槽钢时,认真核对控制屏,微机柜,配电柜外观尺寸,基础槽钢安装完工后,其底部要高于地面10mm左右,其顶部平直度和侧面垂直度要求均为:全长不大于5mm。基础槽钢应牢固可靠接地,与槽钢焊接牢固。基础槽钢安装完后,进行防腐处理,同时接地良好。According to the construction drawings for foundation channel steel production, installation. When installing a foundation channel steel, carefully check the control panel, computer cabinets, power distribution ark appearance size, after the completion of the foundation channel steel is installed, its bottom is higher than the ground about 10 mm, the top side straightness and vertical degree requirements are: total length is not more than 5 mm. Foundation channel steel should be reliable grounding, and channel steel welding is firm. After the foundation channel steel installation, anti-corrosion treatment, grounding is good at the same time. 3.2.3 微机柜、配电柜安装3.2.3 computer cabinets, power distribution ark installation 基础槽钢安装完后,将微机柜、配电柜搬运至基础槽钢上,进行调平、找正,用镀锌螺栓紧固。柜子之间的铜排母线连接牢靠美观。After foundation channel steel is installed, to carry computer cabinets, power distribution cabinet to the foundation channel steel, leveling and alignment, using galvanized bolts. Cabinet copper platoon bus connection between the solid and beautiful. 3.2.4 电缆敷设3.2.4 cable laying 电缆敷设前,对电缆沟、电缆规格、电缆型号、数量、外观进行全面的检查核实,符合设计要求时方可施工。电缆敷设要求排列整齐,清晰,标高正确;电缆、导线穿管敷设
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025版货物运输保险合同:物流企业货物保险风险防范协议
- 2025版车间承包与产业升级服务合同
- 二零二五年度二手车交易税费减免合同范本
- 二零二五年度PK人工智能产业合作合同
- 企业员工课程思政培训心得体会
- 智能制造安全保障措施
- 2025年小学教师体艺专项培训计划
- 2025年上半年财务部工作总结范文
- 人教云教学软硬件支持语文心得体会
- 班主任职业压力管理心得体会
- 扬州市红十字会应急救护培训:问题剖析与优化路径
- 《智能制造基础与应用》课件 第五章 智能制造柔性系统
- 实训十一胸部CT检查CT检查技术课件
- DB14-T 3191-2024 古建筑木结构安全性鉴定技术规范
- JJF(皖) 179-2024 气体涡街流量计在线校准规范
- 奶茶店转让合同书
- 中医内科学课件.感冒
- 2024年延安市市直事业单位选聘笔试真题
- 青少年暑期安全知识课件
- 《秦皇岛市城市区公共租赁住房申请条件》(秦政办字【2020】6号)
- GB/T 21099.5-2024企业系统中的设备和集成过程控制用功能块(FB)和电子设备描述语言(EDDL)第5部分:EDDL内置库
评论
0/150
提交评论